Loading…
Loading…
906 results • Best match
3. Periodical Repair of road from Atharobhola to National Highway (NH-08) (Link No L030) (L 8.19 km) during the year 2023-24
OR of National Highway 208 at Km 83.00 to km 85.20 under Kamalpur Sub-Division, Dhalai during the year 2019-20. SH CC Retaining wall, land slide clearance etc.
Settlement of FL Warehouse From Ranirbazar to Jirania Including Municipal/Nagar Panchayat area under West Tripura District along the National Highway
Construction of Black top road from National Highway to Bandana Paul house at Tepania GP under Udaipur Division during FY 2025-26
NIT for settlement of warehouse from Ranirbazar to Jirania including Municipal, Nagar Panchayat area under West Tripura District along the National Highway
Construction of Black top road from National Highway to Bandana Paul house at Tepania GP under Udaipur Division during FY 2025-26
Construction of Passenger shed near ARDD Office, National Highway Road at Kshirode Nagar VC under Padmabil RD Block as per PWD SoR 2023.
Construction of C.C road from TSR-14 Bn main gate to join national highway (Length 26 mtr.) at HQr. 14th Bn. TSR, Hichacherra, Jolaibari South Tripura.
Construction of Boundary wall along the National Highway infront of Belonia Girls Hostel attached to Belonia Girls H S School, Belonia South Tripura (PWD SoR-2023)
Rectification of 04 nos. Blackspots on Gomati Chouraha Udaipur section of NH 58 (Old NH 08) in the State of Rajasthan on EPC Mode
Renovation and maintenance of Trauma care centre of AGMC for capacity development of GBP Hospital in National Highway during eleventh 5 years plan in FY 22-23.
Construction of CC Road including drain some portion in various spots from National Highway to Manaranjan Debnath to Dilip Karmakar, Word no 21 UMC_UDP 2023_24, Tatol Length 96.50m.
Const.of Paver Block road from near the house of Golapi Biswas to National Highway of Ward no.09 under Mohanpur Municipal Council during the year of 2025-26.
Construction of approx 50(Fifty) mtr Pucca drain from National Highway road at Champaknagar to kamalanagar under Jirania RD Block SH Construction of RCC drain (L 50.0 mtr). . (Deposit Work)
NIeT for settlement of Foreign Liquor Warehouse from Ranirbazar to Jirania including Municipal/Nagar Panchayat area under West Tripura District along the National Highway for the period of April 2025 to March 2026.
NIeT for settlement of Foreign Liquor Warehouse from Ranirbazar to Jirania including Municipal/Nagar Panchayat area under West Tripura District along the National Highway for the period of April 2024 to March 2025.
Ordinary Repair of NH NH-08 between the Ch.375.00 km to Ch. 388.100 Km during the year 2019-20 SH Road side shoulder, protection by Palasiding and sand bag placing including land slide removal
Operation and Maintenance of 04 nos. Highway Mini Nest facilities or amenities at Negadiya Toll Plaza and Mandawada Toll Plaza on Gomati Chouraha Udaipur section of NH 8 New NH 58 under the jurisdiction of PIU Udaipur in the state of Rajasthan
Mtc. of road from NH-08 to NH-08 via Lontharai Shib Mandir
Construction of approx. 26.00mtr Pucca drain from National Highway road at Champaknagar to Kamalanagar under Jirania RD Block SH Construction of RCC drain L 26.00 mtr under PWD R and B Sub Division, Jirania During the year 2021 22 under BEUP..
Mtc. of road starting from NH-08 to NH-08 via Lontharai Shib Mandir
OR of NH 08 during the year 2019-2020. SH Construction of Approach road of RCC Bridge over river Sanicherra at Km 291.930
Repair and Maintenance KANCHANPUR VAGHMUN Road of NH 44A from Ch 86 km to Ch 115 km in the State of Tripura on percentage rate and work order basis
Rectification of 12 no of black spots identified by MoRTH under jurisdiction of PIU Udaipur on 4 laning of Gomati Chauraha Udaipur section of NH 8 from Km 177.000 to Km 260.100 in the State of Rajasthan
Mtc of the road from NH 08 to NH 08 via Choudhadevatathali L 800 mtr NH 08 to NH 08 via Pabiacherra School road L 1200 mtr Kumarghat Darchawi road to Ekalavya school via NirmalSaha house L 800 mtrduring the year 2021 22 SH Patch metalling patch car
Mtc. of different roads i NH 44 to gathalong -Kamarbag road L 1.21 Km, ii) NH 44 to NH 44 via Chandrapur PHC L 2.13 Km ,iii) NH 44 to Tatua tilla L 2.23 Km under Matabari Block SH Patch repairing, Patch carpeting, tack coat, surface drain etc
Mtc. of Agartala town road during the year 202223 SH Grouting,Re Carpeting and sand seal coat etc. Back side of Rasham bagan School to Ichamua road,NH 08 to Morrum nagar Mission road,NH 08 to Rajdhan Nagar Road, NH-08 to Burning Ghat road, NH 08 to
Development of road from NH-08 near Chakmaghat CRPF camp to NH-08 near rice mill of Sri Parimal Das (L- 1.30 km)
Mtc of road from NH-08 Kakuliya to Dolucherra
Improvement of road from Jangalia NH 08 to Dhakabari
NIT for Settlement of Foreign Liquor Ware House Ranirbazar to Jirania including municipal /nagarpanchayat area under west tripura district along with NH for the period from 1st April 2026 to 31st March 2027
OR of NH 208 at Km 80.00 to km 83.00 under Kamalpur Sub-Division, Dhalai during the year 2019-20. SH CC Retaining wall, land slide clearance etc.
OR of NH-208 From km 61.00 to Km 65.00 during the year 2019-20 SH Temporary Protection work by Pallasiding, removing Land slide, gunny bag filling etc.
Construction of C.C.Road with side protection from NH-08 to near the house of Subal Dey (Ward-11) under Kumarghat Municipal Council during the year 2020-21.
OR of NH-208 From Km 75.00 to km 80.00 during the year 2019-20. SH Temporary Protection work by Pallasiding, removing Land slide, gunny bag filling, etc.
FDR / Mtc. of road from NH-08 to NH-08 via Upanagar (L- 2.00 Km) during the year 2022-23 aided by Additional Fund (2nd Call)
OR of NH-208 From km 69.00 to Km 75.00 during the year 2019-20. SH Temporary Protection work by Pallasiding, removing Land slide, CC block , gunny bag filling, etc.
OR of NH-208 From km 65.00 to Km 69.00 during the year 2019-20 SH Temporary Protection work by Pallasiding, RCC retaining wall, removing Land slide, gunny bag filling, etc
Ordinary repair of NH-08 between the CH 397.00 KM to CH 405.00 KM during the year 2019-20 SH BM, PMC, Seal coat etc. Gr-II
Ordinary repair of NH-08 between the CH 397.00 KM to CH 405.00 KM during the year 2019-20 SH BM, PMC, Seal coat etc. Gr-III
Development of road Chutosurma road upto NH-208 (L 6.00 Km)
Construction of RCC road from NH of Ranjit Das to NH of Subodh Das Wno 7 under Baghon GP under 54 Kadamtala Kurti AC under RD Dharmanagar Division
Maintenance of Road from NH-8 near Zilla Parishad Office to NH-8 near CMO Office via Ambassa Colony (Length - 2.65 Km) / SH- Replacement of existing damaged Slab Culvert (Span 10.00 m) by RCC Box Cell (Single cell 8m x 5m) at chainage 0.050 Km
Improvement and Widening to two lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 of NH 208 on Khowai -Teliamura- Harina section) (Package-II) in of Tripura
Ordinary repair of NH-08 between the CH 397.00 KM to CH 405.00 KM during the year 2019-20 SH BM, PMC, Seal coat etc. Gr-I.
Ordinary repair of NH-08 between the CH 397.00 KM to CH 405.00 KM during the year 2019-20 SH BM, PMC, Seal coat etc. Gr-IV
Ordinary repair of NH-08 between the CH 397.00 KM to CH 405.00 KM during the year 2019-20 SH BM, PMC, Seal coat etc. Gr-IV
Construction of RCC Bridge over River Gomati at Ch 49.800 Km and over River Muhuri at Ch 93.775 Km including Approach road to the bridge on Agartala to Sabroom road section of NH-08 (old NH-44) in the state of Tripura on EPC basis
Periodical Renewal of 1 roadstarting from NH 08 near SubashSanga Club to Pabiacherra bazaar via Netaji Pally Total length 0 point 275 Km 2 road from NH 08 to Suryasen para Total length 0 point 170 Km and 3 road starting from Buddhamandir NH 08 to
Const of C.C.Road from NH near Tripti Hotel to n/h of Pankaj Das at ward 15 under kumarghat municipal council during the year 2022-23