Loading…
Loading…
14 live5 closing this weekmost from National Highways and Infrastructure Development Corporation and Chief Executive Officer THCB
14 results • Best match
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) OF KALYAN SAGAR BANK DEVELOPMENT INCLUDING ALLIED WORKS
Engineering, Procurement and Construction (EPC) of Development of Tourist Facilities at Twin Island of Dumboor, Dhalai, Tripura including Allied Works.
Engineering,Procurement and Construction (EPC) of Multi-Level Car Parking (MLCP) Structure including all Civil, Structural, Architectural, MEP, Fire and Life Safety, EV Charging Infrastructure and Allied Works, on Turnkey Basis
Construction of New 480 seated Ekalavya Model Residential School EMRS at Mungiyakami Khowai Tripura on EPC basis
Construction of New 480 seated Ekalavya Model Residential School EMRS at Dasda Tripura North on EPC basis
CONSTRUCTION OF PROPOSED BUILDING FOR THE RENEWABLE ENERGY SERVICE CENTRE AT GURKHABASTI, AGARTALA ON ENGINEERING, PROCUREMENTAND CONSTRUCTION (EPC) BASIS
Strengthening of Agartala Government Medical College (AGMC) and Govind Ballabh Pant Hospital (GBP), Tripura for Enhancement of 100 Undergraduate (MBBS) Seats and 83 Postgraduate (MD/MS) Seats through Infrastructure Development on EPC Basis
Design, manufacture, supply, erection, testing, commissioning of LED based Solar High Mast including Guarantee/ Warranty, Annual Maintenance Contract and insurance coverage for 5 (five) years on turn-key basis throughout the State of Tripura
Constn of 10 bedded PHC At Kalajhari Amarpur with 10nos of staff quarters kitchen morgue garage generator and driver room And At Rupaichari under South District with meeting room kitchen morgue garage and driver room
Strengthening of Udaipur-Sabroom section from km 55.000 to km 127.372 of NH-08 and Raising and drainage provision in selected stretches of Agartala-Udaipur section of NH-08 in the State of Tripura on EPC mode
Restoration works at risk and cost of EPC Contractor through STMC in Tripura during FY 2026 27 on percentage rate and work order for the following road stretches Kaila Khw Pkg I Kaila Khw Pkg IV Kaila Khw Pkg V Agar Khw Pkg II
RR work on NH 208 from km 36 to km 72 at various locations of existing road of Rangamati to Patichhari road section Pkg III at risk and cost of EPC Contractor in Tripura in FY 2026 27 on item rate and work order basis
R and R work on NH 208 from km 0 to Km 36 at various locations of existing road of Khowai - Harina section Pkg II at risk and cost of EPC Contractor in Tripura in FY 2026 27 on item rate basis and work order basis
Maintenance Repair work on Champaknagar to Khayerpur road section on NH-08 from Km 242.500 to Km 261.610 (existing road) at various sections at the risk and cost of EPC Contractor in the state of Tripura in the FY 2026-27 on item rate basis work