Loading…
Loading…
29 live9 closing this weekmost from Project Director PMU BIIU ADB PWD Dehradun and NBCC Bhawan
29 results • Best match
Development of Satellite Township Phase-l, Package 3 (Group Housing 02) including allied works at Rakh Gund Aksha, Bemina, Srinagar (J and K) on Design, Engineering, Procurement and Construction (EPC) basis with Operation and Maintenance of 2 years
Electromechanical Works of 3x40 MW Sirkari Bhyol Rupsiabagar HEP including Detailed Design, Engineering, Manufacture, Supply, Erection, Testing, commissioning and other associated different works on EPC (Engineering, Procurement and Construction)
CONSTRUCTION OF 30.00M STEEL COMPOSITE GIRDER BRIDGE AT KM 31.600 DESIGN CHAINAGE 243.46 ON GANGOTRI RISHIKESH SECTION OF NH34 ON EPC MODE IN THE STATE OF UTTARAKHAND UNDER EPC MODE
Electro-Mechanical Works of 2x36 MW Tiuni Plasu HEP on EPC basis.
Treatment of 16 no of landslide location on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2025-26
Landslide treatment work from Km. 6.016 to Km. 6.180 (1 location) on Narendranagar Ranipokhri Motor Road (SH-77) in District Tehri Garhwal under EPC mode.
Landslide treatment work from Km. 7.020 to Km. 7.160 (1 location) on Narendranagar Ranipokhri Motor Road (SH-77) in District Tehri Garhwal under EPC mode.
Landslide treatment work from Km. 9.070 to Km. 9.250 (1 location, Jajred) on Kalsi Chakrata Motor Road (SH-20) in District Dehradun under EPC mode.
Landslide treatment work from Km. 2.025 to Km. 2.295 (1 location) on Kathgodam Haidakhan Sanniband Similiya bend Motor Road (SH-103) in District Nainital under EPC mode.
Landslide treatment work from Km. 40.400 to Km. 40.758 (1 location) on Ramnagar Bhandarpani Amgarhi Okhaldunga-Talli Sethi Motor Road (SH-71) in District Nainital under EPC mode.
Landslide treatment work from Km. 63.095 to Km. 63.467 (1 location) on Ramnagar Bhandarpani Amgarhi OkhaIdunga TaIIi Sethi Motor Road (SH 71) in District Nainital under EPC mode.
Landslide treatment work from Km. 18.150 to Km. 18.560 (1 location) on Garjiya (Ghughtidhar) Betalghat-Khairna- Odakhan-Bhateliya-Muketshwar Motor Road (SH 62) in District Nainital under EPC mode.
Renovation, Modernization and Upgradation of Kulhal Hydroelectric Project on turn key basis
Landslide treatment work from Ch. 269.900 km to Ch. 270.214 km (Crown portion at Totaghati) on NH-07 (old NH-58) in the State of Uttarakhand under Annual Plan 2025-26 - under EPC mode
Treatment of 30 nos of landslide locations from km 64.380 to km 186.085 on NH-09 (Old NH-125) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2026-27
Construction of balance and left out work of The River Crest at Village Kalyanpur of Rudrapur District of Uttarakhand State pertains to M/s Supertech on EPC Basis.
Construction of 2256 Science Laboratories (Physics, Chemistry and Biology) in 922 Government Schools of Rajasthan at different locations on EPC Basis for Rajasthan Council of School Education, Jaipur
Construction of balance and left out work of The River Crest at Village Kalyanpur of Rudrapur District of Uttarakhand State pertains to M/s Supertech Limited on EPC Basis
Design and Execution of Three Skybridge Lifts and Water Transfer System from TD 2 Drain to Water Bodies, including Allied Works, at Bharat Vandana Park, Sector 20, Dwarka, New Delhi, on EPC Basis
Development of Satellite Township Phase-l, Package 6 (Studio Apartment and 1BHK) including allied works at Rakh Gund Aksha, Bemina, Srinagar (J and K) on EPC basis with O and M of 2 years
Providing Architectural and Engineering Consultancy services for Construction of a) Office Complex of Reserve Bank of India at Nelapadu, Amaravati, Andhra Pradesh and b) Officers and Staff Residential Complex of Reserve Bank of India at Inavolu, ... ( EPC Basis )
Design and construction of 300 bedded including 50 bedded super speciality hospital 2 basement plus ground plus 6 floors multilevel car parking ground plus 10 storied Type 2 28 nos, stilt plus 7 floor Type 3 18 nos Stilt plus 9 floor Type 4 12 nos ... in EPC Mode Design ...
Design and construction of 300 bedded including 50 bedded super specialty hospital 2 basement plus ground 6 floors multilevel car parking ground plus 10 storied Type II 28 Nos stilt plus 7 floors Type III 18 nos stilt plus 9 floor Type IV 12 Nos ... in EPC mode Design ...
Widening to 2 Lane paved shoulder from Existing Chainage 12.000 to Km 40.500 Badhwala to Lakhwar Bend Realignment from km. 12.00 to 31.122 on NH-507 Length-25.660 Km in the State of Uttarakhand on EPC Mode.
Installation of 33/11 KV CSS to provide uninterrupted power supply at Nagrasu in EDD,Rudraprayag on Semi Turnkey Basis
Work Of Installation of 33 KV Ring Main Unit at 33/11 Kv S/s Rudraprayag on Semi Turnkey Basis
Upgradation of Distribution Transformer into CSS at Gopinath Temple in S/s Chamoli against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis
Upgradation of Distribution Transformer into CSS at Police line Gopeshwar in S/s Chamoli against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis
Upgradation of Distribution Transformer into CSS at Collectrate/Kund Feeder in S/s Chamoli against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis