Loading…
Loading…
46 live4 closing this weekmost from Ministry of Road Transport and Highways and National Highways Authority of India
46 results • Best match
Construction of Bypass Road to Aska Town on NH-157 in the state of Odisha on EPC mode
Construction of new Major H.L. bridge utei at km. 87.900 on NH 59 in the state of Odisha on EPC mode
Construction of New Major HL Bridge across River ONG at Km. 43.500 on NH-26 in the State of Odisha on EPC mode
Construction of 2 Lane Bridge at Km 21.206 and Km 26.983 at Bargarh District on NH-26 in the State of Odisha under EPC Mode
Construction of FOB at Munda Sahi, Jarapada, Katada, Luhamunda , handpa and katibari on Angul Sambalpur of NH 55 in the state of Odisha on EPC Mode
Procurement, Supply, Erection and Commissioning of Supplementary Mining Plant (SMP - 5) at Orissa Sand Complex (OSCOM), Chatrapur, Ganjam, Odisha on EPC Basis
Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km 38.500 (Design ch. 6.750) of NH-157 in the state of Odisha on EPC Mode
Development of 80MW 320 MWh Battery Energy Storage System (BESS) system through complete EPC mode at four designated locations in Odisha along with 15 years of Comprehensive Operation and Maintenance
Reconstruction of Bridges Major Bridge at Takera at Ch 184.200 and four Minor Bridge at Ch189.400, 190.600,191.400 and 193.200 on NH-57 in the state of Odisha on EPC mode
Construction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode
EXECUTION OF BALLAST LESS TRACK WORKS FROM SHIVALINGAPURAM STATION KM. 45.483 TO BORRAGUHALU STATION KM. 72.550 IN CONNECTION WITH KOTTAVALASA KORAPUT DOUBLING PROJECT OF RAYAGADA DIVISION, EAST COAST RAILWAY ON EPC MODE
CONSTRUCTION OF NEW MAJOR H.L. BRIDGE LANTH-I AT CH 113/960 Km AND LANTH -II AT CH 114/446 Km OF NH 26 IN THE STATE OF ODISHA IN EPC MODE
Construction of H. L. Bridge across Brahmani river on Manjuripada Hatibari road (from km 4.290 to 7.030) connecting to Sukinda Block in the District of Jajpur for the year 2026-27 (EPC Mode)
Construction of Phulbari Instream Storage Structure across River Sapei near village Phulbari in Bargaon block of Sundargarh district in state of Odisha on EPC Turn key basis including power connectivity system and operation and maintenance
Construction of Proposed HL Bridge over Local Nallah at Ch 96.400 Km over Gadgadi River at Ch. 105.550 Km and Widening and Strengthening from Ch 91.720 to 91.920 Km on NH-153 (B) in the State of Odisha on EPC Mode
Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode
Construction of 1 Flyover at Palbani,1 PUP at Kuchai,1 PUP at Samsanghat on Jharpokharia Balasore section of NH 18 and 1 VUP at Manda on Baharagora Singhara of NH 49 in the state of Odisha on EPC Mode
Under Ground Pipe Line Irrigation Gravity Flow with Micro Irrigation System in the Command Area of JLMC and its System From RD 45.630KM to RD 82.64KM of SIP, Laxmiposi, Mayurbhanj, Odisha. on EPC Turn Key basis including O and M for 5 years
Design and Construction of Multi storied, Type-II, Type-III, Type-IV and Type-V Staff Quarters, Divisional store depot, Training institute including electrical general works and allied works at Rayagada and Area office at Koraput in connection with ... ( EPC ) ... (EPC) Mode
Construction of ISS at Sarsara Balitikra across river Jeera in Bargarh District Odisha on EPC Turnkey Basis including Power Connectivity system and Operation and Maintenance for five years
Construction of Bharatpur ISS across river Ichha near village Bharatpur in Lephripada Block of Sundargarh district in State of Odisha on EPC Turnkey Basis including Power Connectivity system and Operation and Maintenance of complete commissioned
Design, Engineering, Supply, Erection, Testing and Commissioning work towards Construction of 400 KV D/C Quad line from proposed NTTPP, NLC, Talabira to 400/220/132/33 KV Grid Sub-Station, Lapanga along with Construction of 02 Nos. of 400 KV bays at ... on EPC contract basis.
Compressed Air System for 1X800 MW NTPC Darlipali-II STPP - EPC as per tender documents.
EPC of Ash Handling System at 1X800 MW NTPC Darlipali Stage-II, Odisha
Operation And Maintenance Of Other Machines And Plants - Procurement, Supply, Erection and Commissioning of Supplementary Mining Plant (SMP - 5) at Orissa Sand Complex (OSCOM), Chatrapur, Ganjam, Odisha on EPC Basis
Execution of Operation and Maintenance works on selected stretches of 4/6L of puintola tangi on NH 16 including construction of drains and repairs of precast drain slabs at location delinked from scope of EPC contractor at risk cost of EPC contractor
EPC PACKAGE FOR ASH HANDLING SYSTEM PACKAGE AND MILL REJECT HANDLING SYSTEM AT 3X800MW, NLC TALABIRA THERMAL POWER PROJECT, JHARSUGUDA, ODISHA.
EPC of Coal handling plant, Biomass handling system and Mill Reject handling system at 1X800 MW NTPC DARLIPALI STAGE-II, ODISHA
Execution of Pothole Rectification/Filling Works of NH 53 at the risk n cost of the EPC Contractor of Duburi Chandikhole of NH 53 in the State of Odisha
Rectification of roughness/unevenness identified in PQC pavement at the risk n cost of EPC Contractor of 4 laning of Angul Sambalpur section of NH 55 in the state of Odisha
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor ... on EPC Basis in ...
Design, Engineering, Supply, Erection, Testing and Commissioning work towards Construction of 400 KV D/C Quad line from proposed NTTPP, NLC, Talabira to 400/220/132/33 KV Grid Sub-Station, Lapanga along with Construction of 02 Nos. of 400 KV bays at ... on EPC contract basis.
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road ... on EPC Basis in ...
Avenue Plantation and Cactus Plantation works at Risk and Cost of EPC contractor, along Amritsar to Jamnagar Section of 6L of (Rasisar) to (Deogarh) (near Dhadhaniya) section on NH 754K in the State of Rajasthan
Design, Engineering, Supply, Erection, Testing and Commissioning of work towards Construction of 400kV Indravati to Therubali Double Circuit Transmission Line from proposed 600MW, PSP Sub Station at Mukhiguda to proposed 400/220kV GSS Therubali with ... on EPC contract basis.
Avenue Plantation or Replacement of Dead Avenue plants work at Risk and Cost of EPC contractor, along Amritsar to Jamnagar Section of 6L of (Rasisar) to (Deogarh) (near Dhadhaniya) of Pkg 3 section on NH 754K in the State of Rajasthan
Avenue Plantation or Replacement of Dead Avenue plants work at Risk and Cost of EPC contractor, along Amritsar to Jamnagar Section of 6L of (Rasisar) to (Deogarh) (near Dhadhaniya) of Pkg 6 section on NH 754K in the State of Rajasthan
Avenue Plantation or Replacement of Dead Avenue plants work at Risk and Cost of EPC contractor, along Amritsar to Jamnagar Section of 6L of (Rasisar) to (Deogarh) (near Dhadhaniya) of Pkg 5 section on NH 754K in the State of Rajasthan
Avenue Plantation or Replacement of Dead Avenue plants work at Risk and Cost of EPC contractor, along Amritsar to Jamnagar Section of 6L of (Rasisar) to (Deogarh) (near Dhadhaniya) of Pkg 2 section on NH 754K in the State of Rajasthan
STATION LIGHTING SYSTEM (EPC) FOR 3x800 MW NLC TALABIRA TPP (NTTPP)
Jeypore - Nabarangpur New BG Railway Line project: Design & Construction of New BG Railway Line between Ambaguda(excluding) (13.60 Km) to Nabarangpur(including) (43.996Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side ... on EPC Basis in ...
Design, Engineering, Supply, Erection and Commissioning of 220 kV DC Line from proposed 400/220 kV GIS Sub-station at Ramakrushnapur to existing 220/132/33 kV GSS, Bhadrak along with 2 Nos. of 220 kV Feeder Bay Extension at 220/132/33 kV GSS, Bhadrak ... on EPC /Turnkey ... EPC/ Turnkey CONTRACT
Provision of 5kVA Auxiliary Transformers(AT) in connection with Supply, Installation and Commissioning of Hot Axle Box Detector(HABD) on turnkey basis along with recording system with cloud server over KUR Division. Qty-08 Nos. including the work for electrical power supply through Auxiliary Transformer(AT) at all 08sites.
Engineering, Supply, Erection, Testing and Commissioning for Conversion of existing 03 nos Conventional Grid Substation at Cuttack, Bhanjnagar and Thiruvali into SAS enabled Substation through installation of Kiosk Based Automation System and ... on turnkey contract
Engineering Supply Erection Testing and commissioning of 2x200MVA, 220 132 KV and 2x100MVA 220 33 KV Grid Substation at Panikoili with LILO arrangement from 220KV New Duburi Paradeep DC line to proposed 220 132 33 KV SubStation at Panikoili and 132KV ... on Turnkey basis.
Augmentation of 220/132/33KV Atri Substation capacity from 320 MVA to 480MVA at 220 kV level through construction of 220 kV and 132 kV 3rd 160MVA Auto Transformer Bay and 60 MVA to 110 MVA at 132 kV level through construction of 132 kV and 33kV 3rd ... on Turnkey contract