Loading…
Loading…
78 live22 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
78 results • Best match
Design, Engineering, Procurement and Construction (EPC) of the Indian Grain Storage Management and Research Institute (IGMRI) Training Institute Complex at PUSA, New Delhi.
Engineering, Procurement and Construction of Residential flats including all Civil, Structural, Mechanical, Electrical, Plumbing, Fire Fighting, Horticulture, Landscaping and all associated works.
C/o New Boys and Girls Hostels in Maulana Azad Medical College, New Delhi on EPC Mode
Construction of 4 Lane Mukundra Bypass on Kota-Jhalawar Section of NH-52 in the State of Rajasthan on EPC Mode.
PROVISION OF TRANSIENT ACCOMMODATION FOR PATIENTS OF AH RR AND BHDC ON EPC MODE UNDER GE P EAST DELHI CANTT-10
One Time improvement of NH-9 (Rohtak Road) From Punjabi Bagh underpass till Tikri Border in the State of Delhi on EPC Mode
Development of Interchange at Starting Point of Ahmedabad Dholera Expressway meeting with Sardar Patel Ring Road SPRR in Ahmedabad Gujarat on EPC Mode.
Construction of a two-lane Secondary Service Road along UER-II within the available RoW in the State of Delhi on EPC mode.
PROVISION OF GENERAL ENGINEERING ANCILLARY BAY AGGREGATES RESET DEPARTMENT NO. 02 AND STRIPPING, WASHING AND DEGREASING BAY FOR AB WKSP AT DELHI CANTT EPC MODE
Six laning of Atkadih to Gorhar Section of NH 19 (Old NH 2) from Km 320.800 to km 326.160 in the State of Jharkhand on EPC Mode
Balance Works of 4 lane Bangalore Chennai Expressway from Arakkonam to Kancheepuram (Km 204.500 to Km 230.000) (Phase III/Package III) in Tamil Nadu on EPC Mode.
EOI Document for Prebid Tieup for Selection of Consortium Partner for Design Supply InstallationTestingCommissioning and Operation Maintenance of ATMS projects in Zone1 Delhi Region on EPC mode
Construction of 2 ROBs (129A and 134A) on the bypassed section of Thiruvarur Town in the Nagapattinam Thanjavur Section of NH 83 in Tamil Nadu on EPC Mode
Construction of 6 lane Viaduct and service road from Baikampady (Km.365.200) to KIOCL junction (Km.368.275) of NH-66 in the state of Karnataka on EPC mode
Request For Proposal (RFP) for Design Supply Installation Testing Commissioning and Operation and Maintenance of Advanced Traffic Management System (ATMS) projects in Zone 1 (Delhi Region) on EPC mode
Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode.
Request For Proposal (RFP) for Design Supply Installation Testing Commissioning and Operation and Maintenance of Advanced Traffic Management System (ATMS) projects in Bangalore Vijayawada Economic Corridor (BVEC) on EPC mode
Balance work of Major Bridge on well foundation over River Gomti on NH 128A (Parallel to Shastri Bridge) in Jaunpur City in the state of Uttar Pradesh on EPC mode
Upgradation of Chitrod-Rapar-Balasar section of NH-927C to two-lane with paved shoulders from design km 0.00 to km 57.848 in the State of Gujarat on EPC mode.
Upgradation to 2 Lane with Paved Shoulders of Naliya Narayan Sarovar section from design km 220.773 to km 288.987 of NH 41 in the state of Gujarat on EPC mode.
Construction of Service Road along with 02 flyovers-underpasses at Ch. 85.750 to 97.250 on Guna Bypass Section of NH-46 in the State of Madhya Pradesh on EPC Mode
Construction of State Guest House Delhi Sadan at Plot No 5 Sector 19 Dwarka New Delhi including all services on EPC basis Mode I
Construction of 2 Lane Service Road of STRR (West side) NH948A Balagondapalli (Tamil Nadu) to Karnataka/Tamil Nadu border from km 144.170 to km 179.936 in Tamil Nadu on EPC Mode.
Widening and Strengthening Of Existing 2 Lane to 2 lane with Paved Shoulder from Km. 205.373 to Km. 311.700 of NH-326 in the State of Odisha under EPC mode (Package-2)
Balance work for Const of Western Side Spur of Rampur Rudrapur sec connecting NH24 to NH 87 bypassing Rampur Town at Risk and Cost of Contractor on EPC Mode in Uttar Pradesh.
Balance work for Construction of 8-lane access-controlled expressway from km 154.6 to Km 190.0 of Vadodara Mumbai Expressway (Jujuwa to Gandeva section) in Gujarat on EPC mode (Pkg-VIII)-02nd Call
Const. of 4L from Kadur Km 256.530 to Hasnapur Potulamadugu Km 267.360 Mahabubnagar Bypass of Hyderabad Panaji sec of NH167 L 10.830km under NH O in the state of Telangana on EPC Mode.
Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode
Development or construction of entry exit arrangement AT 4 Lane Greenfield Expressway SPUR from Delhi Vadodara Greenfield Expressway near Bandikui to Jaipur section of NE 4C in the state of Rajasthan on EPC Mode.
Widening and strengthening of stretch from Hansdiha (Design Ch 92.380 km) to Chopa More (Design km 129.370) of NH-133 to 4 lane with paved shoulder in the State of Jharkhand under EPC mode
Construction of 4 lane Bypass Road to the existing NH 31 and NH 922 through Bairiya Ara section from Km. 0.000 to Km. 27.062 in the State of Uttar Pradesh and Bihar on EPC Mode
Construction of Additional Major Bridge and its approaches across river Teesta (at Sevoke) starting around km 591.310 of NH-10 (Old NH-31) in the District of Darjeeling West Bengal on EPC Mode under NH(O)
Development of 4/6 Lane Green Field Bypass for Etmadpur and Tundla Town on Section of Agra Etawah NH 19 from design Km. 0.000 to Km. 16.200 in the State of Uttar Pradesh on EPC Mode.
Construction of 4 L of Ujjain Jhalawar Sec of NH 552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli Kadiya (PKG 1) in the State of Madhya Pradesh on EPC Mode under NH(O).
Construction of Perimeter Roads on Both sides of Emergency Landing Facilities (ELF) including ATC Plinth (50m x 50m) on Chilakaluripeta Nellore Section of NH16 from Km. 1210.000 to Km. 1214.600 in Andhra Pradesh on EPC Mode
Construction of 4-Lane Flyover along with Approaches and Service Roads at Simrahi Bazar from Design Ch. 170.210 Km to Ch. 172.250 Km on NH27 (Total Length 2.04 Km.) in the State of Bihar on EPC Mode.
Balance work of Six laning of Kagal Satara section of NH 48 (old NH 4) Package I from km 592.500 to km 658.000 in the State of Maharashtra to be executed on EPC mode under Bharatmala Pariyojana
Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode in the State of Karnataka
AE services for Development of Access Controlled Highway of 4 lane from Kadur (Km 256.160) to Hasnapur/Potulamadugu (Km 267.360) (Mahabubnagar Bypass) of Hyderabad Panaji section of NH167 (length 11.200km) under NH(O) in Telangana on EPC mode.
Rectification of 25 no of Accident Spots Blackspots in Karur Dindigul Madurai Kayathar sec of NH44 Chettikulam Natham sec of NH785 and Const of Combined Office Building for RO n PIU Madurai in Tamil Nadu on EPC mode
Construction of 4L of Ujjain Jhalawar Sec of NH 552G from Ch.86.500 Aakli Kadiya to Ch.159.263 Jhalawar (Jn with NH52) PKG 2 in the State of Madhya Pradesh and Rajasthan on EPC Mode under NH(O)
CS for Supervision Consultant during OnM of 8L AC GF DVE NH148N starting at Sohna Gurugram Road NH248A near Alipur vill to Haryana Rajasthan Border Ch.0.000 to Ch.78.800 in Haryana on EPC mode under Bharatmala Pariyojana
Rehabilitation and Upgradation of exist 2L to 4L of NH146 from Km 0.000 Km 158.600 near Berkheri vill to Km 23.423 Km 181.800 near Lehdara vill in the State of Madhya Pradesh on EPC Mode TL 23.423 km
Widening and Strengthening of Existing 2 Lane to 2 Lane with Paved Shoulder from Km. 68.600 to Km. 162.700 and Km. 178.400 to Km. 183.732 of NH-326 in the State of Odisha under EPC Mode (Package-1)
Construction of 4 Lane Access Controlled Bypass to Tiruvannamalai Town starting from Design km 75.150 of new NH38 and ending at Design km 88.030 of new NH38 (Design Length 22.710km) in the state of Tamil Nadu on EPC Mode
Rectification of Black Spot locations of Chutupallu Ghati from Ch. 92.885 to Ch.97.920 and Charahi Ghati Section from Ch. 51.540 to Ch. 52.500 on NH33 (New NH20) under NH(O) on EPC mode in the State of Jharkhand
Construction of General Pool Residential Complex at Village Bahapur, New Delhi Construction of 80 nos. Type V and 80 nos. Type VI residential units including basement, G to 20 floors, including all development works and services on EPC Mode I basis
Rectification work on 8L access controlled expressway section of Delhi- Vadodara Green Field Alignment (NH 148N)on EPC Mode under Bharatmala Pariyojana in Rajasthan in the state of Rajasthan on Risk and Cost of Contractor on Item Rate basis (Pkg 13)
Rectification work on 8L access controlled expressway section of Delhi- Vadodara Green Field Alignment (NH 148N)on EPC Mode under Bharatmala Pariyojana in Rajasthan in the state of Rajasthan on Risk and Cost of Contractor on Item Rate basis (Pkg 14)
Engagement of user fee agency through e-quotation for Dularpur Fee Plaza for two lane with paved shoulder road under EPC mode on Bahraich-Shrawasti Section (km 248.400 to km 310.000) on NH-730 in the state of Uttar Pradesh