18 live7 closing this weekmost from WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED and Eastern Railway
18 results • Best match
Design, Engineering, Procurement and Construction, EPC contract for Proposed Construction of CISF Building, 3 storey including allied works at Ramnagar, Kolkata, West Bengal.
"Execution of Third Line BG track between Ranaghat Jn. (Excl.) and Krishnanagar Jn. (Excl.) from Km 75.210 (from Sealdah) to Km 97.585 (from Sealdah) including Electrification & Signalling works" on EPC mode.
EOI invited for association as JV Partner from Exp. Agencies for Construction of Additional Major Bridge and its approaches across river Teesta at Sevoke... in District of Darjeeling, West Bengal On Engineering,Procurement, Construction (EPC) Mode
Construction of Additional Major Bridge and its approaches across river Teesta (at Sevoke) starting around km 591.310 of NH-10 (Old NH-31) in the District of Darjeeling West Bengal on EPC Mode under NH(O)
Construction of New 33 KV Indoor Switchgear Room with 33 KV Integrated Panel at New Town-IIC 220 KV Gas Insulated Substation Under Saltlake Area Office And Allied Works On Turn Key Basis.
Construction of Single Circuit Transmission Line from Durgapur AB Zone 220 KV Substation to B Zone 132 KV Substation using 132 KV XLPE cable (RL-2.1 Km) and allied work on Turn Key Basis.
Construction of Basement plus Ground Floor plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata including Civil, Electrical & Mechanical and Horticulture works/services on EPC basis....
Procurement of 132 KV, 50 MVAR Capacitor Bank with Reactor, NCT and structures required for Subhashgram 220 KV Sub-Station, Gangarampur 132 KV Sub-Station, Serakol 132 KV Sub-Station under (OandM)-I wing, WBSETCL On Turn Key Basis.
Slope Protection and Landslide mitigation and Reconstruction of Road including culvert from km 38.030 to km 38.130 100 mtr. approx. near Dungekoti Upper Pagla Jhora on NH 110 on EPC mode in the State of West Bengal during FY 26-27
Turnkey Works for Setting Up of AMRIT Pharmacy Outlet at Sampunath Pandit Hospital at Kolkata in West Bengal
Supply, Installation, Commissioning & Proving out of airless Centrifugal Shot Blasting and Peening Plant for coil Springs (Turnkey basis).
INVITATION FOR BIDS (IFB) FOR BALANCE OF PLANT (BOP) EPC PACKAGE FOR DURGAPUR THERMAL POWER STATION (1X800MW) LOCATED AT BARDHAMAN DISTRICT OF WEST BENGAL
Procurement for Supply, installation and commissioning of Diesel Generator Set 400 KVA with AMF Control Panel , as per attached Technical Specification on turnkey basis
Planning, Design and Construction of Nursing College in the premises of Malda Medical College and Hospital in the State of West Bengal on Turnkey Basis
Planning, Design and Construction of Nursing College in the premises of Jhargram Medical College and Hospital in the State of West Bengal on Turnkey Basis
Replacement of Carrier Protection Panel for Channel-I at both Kharagpur (WBSETCL) and Baripada (PGCIL) end i.r.o. Kharagpur- Baripada 400 KV Single Circuit Transmission line and allied work on Turnkey Basis
Design, manufacture and supply of Machine Room / Machine Room Less (MRL) Passenger Lift ( G + 4 ), 5 Stops, 5 Openings, 8 Passenger capacity ( 544 Kgs ) in connection with the work for "Electrical General work in connection with Construction of Zonal ... cum EPC Building ...
Installation and Commissioning of Grid Connected Solar PV Power Plants of cumulative array capacity 643 KWp at different locations under Irrigation Waterways Department, West Bengal including 5 years comprehensive maintenance on turnkey basis