Loading…
Loading…
14 live6 closing this weekmost from South East Central Railway and Bharat Heavy Electricals Limited
14 results • Best match
Construction of Service Road from Ch 312.750 to 314.800 LHS and from Ch 313.000 to 314.800 RHS near Urla Village on existing Durg Bypass NH-53 (Old NH-06) in the State of Chhattisgarh on Engineering Procurement and Construction (EPC) Mode.
Engineering Procurement and construction (EPC) contract For construction of New Railway line from Rowghat - Jagdalpur(140Kms) Package- I from Ch 12+700 to 42+600 from Kurkanar to Bhanpuri Excluding Kurkanar station and including Bhanpuri Station In connection of Dallirajhara - Rowghat - Jagdalpur New railway line in the state of Chhattisgarh.
Strengthening work in KM 14.20 to 25.53 and 31.54 to 55.70 JAGDALPUR - SUKMA - KONTA ROAD on NH-30 in the State of Chhattisgarh on EPC mode.
"Development of Maintenance Facilities for Amrit Bharat Trains at Coaching Depot/Bilaspur including Construction of Heavy Repair Bay and Service-cum-store Building for Amrit / Vande Bharat Train Maintenance at Bilaspur in Engineering, Procurement, ... ( EPC ) ... (EPC) mode ".
Widening of Service Road from Km. 265.500 to Km. 279.750 on Four lane Raipur-Aurang section from Km.239.000 to Km. 282.000 of NH-6 (New NH-53) as BOT (Toll) on DBFOT pattern under NHDP IV on EPC mode
NEW BROAD GAUGE SINGLE LINE OF RAILWAY PROJECT COMPRISING THE SECTION COMMENCING FROM PARADOL TAKEOFF POINT (KM 947.257) TO NAGPUR ROAD STATION ( CONNECTING POINT-KM:964.820) AND SLEWING OF EXISTING BORIDAND-CHIRMIRI LINE FROM KM:946.640 TO KM: ... in EPC Mode .
FUEL OIL HANDLING AND STORAGE SYSTEM for 2 X 660 MW CSPGCL KORBA WEST- EPC as per tender documents.
EPC PACKAGE FOR COAL HANDLING PLANT, BIOMASS HANDLING SYSTEM and MILL REJECT HANDLING SYSTEM AT 2X660 MW CSPGCL KORBA WEST TPP (CHHATISGARH, INDIA).
Rate Contract for Supply, Installation and Commissioning (on Turnkey Basis) and CAMC of CEMS (Continuous Emission Monitoring System) at NTPC stations.
Construction of Permanent Campus of Indian Institute of Technology Bhilai at Kutelabhata, Durg, Chhattisgarh. Phase-B-Part-1. SH- Engineering Department (3 blocks) (G Plus 5), Administrative block (01 block) (G Plus 3), Lecture Hall Complex (01 ... on EPC Mode -III ...
Construction of Residential Towers at Bacheli Complex under Capacity expansion of Bailadila Iron Ore Deposit-10/11A, NMDC Bacheli, Chhattisgarh comprising 5 Nos. Type-III ResidenTIAL TOWERS (S+10), 1 No. Type-IV ResidenTIAL TOWER (S+10), 2 Nos. Staff ... on EPC mode
DESIGN, SUPPLY, ERECTION, TESTING, AND COMMISSIONING INCLUDING WARRANTY, COMPREHENSIVE OPERATION & MAINTENANCE OF GRID-CONNECTED ROOFTOP SOLAR PLANTS OF VARIOUS CAPACITIES IN THE RESIDENTIAL SECTOR UNDER THE “UTILITY-LED AGGREGATION (ULA) MODELS” OF ... UNDER EPC (CAPEX) ...
Facility Management Services - LumpSum Based - Laundry System Fabrication, Electrical and Plumbing Works on Turnkey Basis; Laundry System Fabrication, Electrical and Plumbing Works on Turnkey Basis; Consumables to be provided by service provider (i..
e –SHORT TENDER FOR THE ESTABLISHMENT OF PHYSIOTHERAPY UNIT (TURNKEY PROJECT) OF DISTRICT HOSPITAL CHIRMIRI (CHC CHIRMIRI) TO CHHATTISGARH STATE FOR CHHATTISGARH MEDICAL SERVICES CORPORATION LIMITED. (4th Call)