65 live31 closing this weekmost from U.P. Power Transmission Corporation Ltd. and National Highways Authority of India
65 results • Best match
Construction of Police Infrastructure Works at Mankote-Poonch and at Fatehpur-Rajouri, Jammu (JK) on Engineering Procurement and Construction (EPC) Mode
Development of Access Controlled Greenfield 6 lane Chitrakoot Link Expressway from design chainage 0.000 KM to 015.172 KM in the state of Uttar Pradesh on Engineering, Procurement and Construction EPC Mode.
Lining up Licensing, Engineering, Procurement and Construction (LEPC) agency for setting up 200 Tons per day (TPD) Segregated Organic Municipal Solid Waste (SOMSW) based Compressed Biogas plant at Gorakhpur
DPR Consultancy Services for Construction and Redevelopment of Green Park International Cricket Stadium at district Kanpur UP on EPC mode
PMC work for Construction of Sports College in Orai Assembly Constituency of Jalaun District of Jhansi UP on EPC mode
PMC work for Construction of Sports College in Vidhansabha Sadar of District Shahjahanpur of Bareilly Division UP on EPC mode
PMC work for Construction of Sports College in Etmadpur Vidhan Sabha Constituency of Agra at district Agra UP on EPC mode
Construction of Flyover at Ch.93.060 in Jhansi-Lalitpur section of NH- 44 in the state of Uttar-Pradesh on EPC mode
One Time Improvement (OTI) of NH-29E from km. 81.420 to km. 98.935 (Length 17.515 Km.) under EPC mode in the State of Uttar Pradesh.
Engineering, Procurement and Construction (EPC) Agreement with Schedule G-1 For third line track between Manikpur (excluding) to Iradatganj (including) (Ch: 1257.180 to 1340.820) including Electrification & Signaling works along with construction of ROB on LC No. 404/C2, 406/2T, 407/2E & 418C/2E and RUB in LC no 426 in connection with Manikpur-Iradatganj 3rd line project of North Central Railway
Construction of LVUP on NH927 as long term rectification of MoRTH identified blackspot in Bahraich bypass to Rupaidha NH927 in the state of Uttar Pradesh on EPC Mode
Development of Internal Infrastructure for Integrated Manufacturing and Logistics Cluster at Barabanki with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five Years on EPC Mode
Balance work of Major Bridge on well foundation over River Gomti on NH 128A (Parallel to Shastri Bridge) in Jaunpur City in the state of Uttar Pradesh on EPC mode
Balance work for Const of Western Side Spur of Rampur Rudrapur sec connecting NH24 to NH 87 bypassing Rampur Town at Risk and Cost of Contractor on EPC Mode in Uttar Pradesh.
Consultancy Services for Supervision Consultant during Operation and Maintenance of Gorakhpur Bypass constructed through EPC contract under NHDP IV in the State of Uttar Pradesh
Supervision by Authority Engineer for Design Engineering Procurement for Construction of Non residential buildings for the establishment of 6th Battalion of SSF PAC and Other Institutions at district Ayodhya Uttar Pradesh on EPC mode
Improvement of existing bypassed section of NH 731A from Km. 35.110 to Km. 43.830 (Lal Gopalganj) in total 8.72 Km. length under One Time Improvement policy under EPC mode in the state of Uttar Pradesh.
Construction of 4 lane Bypass Road to the existing NH 31 and NH 922 through Bairiya Ara section from Km. 0.000 to Km. 27.062 in the State of Uttar Pradesh and Bihar on EPC Mode
Development of 4/6 Lane Green Field Bypass for Etmadpur and Tundla Town on Section of Agra Etawah NH 19 from design Km. 0.000 to Km. 16.200 in the State of Uttar Pradesh on EPC Mode.
RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.
Improvement of existing bypassed section of NH 731A from km 52.200 to 54.370,57.314 to 57.746, 60.670 to 61.460,65.06 to 68.58, 83.530 to 87.110 and 89.130 to 92.140 (Kaushambi to Chitrakoot Section) in total 13.502 km length under OTI on EPC mode
Engagement of user fee agency through e-quotation for Dularpur Fee Plaza for two lane with paved shoulder road under EPC mode on Bahraich-Shrawasti Section (km 248.400 to km 310.000) on NH-730 in the state of Uttar Pradesh
Construction of 6 lane Vehicular underpasses at Km 306.930 (Tilhar bypass) and Km 347.595 (Ucholiya) for permanent rectification of MoRTH identified Blackspot on Bareilly-Sitapur section of NH-30 (old NH-24 in the state of Uttar Pradesh on EPC mode.
Construction of 100 Bedded ESIC Hospital Building i/c 32 nos staff Quarters at Marschal Pitch Kanker Khera Meerut UP in EPC Mode-I SH: Hiring of inspection vehicle for the use of Executive Engineer, Meerut Division, CPWD Meerut UP. Subwork/Packages: Inspection of Vehicle
Consultancy Services for AE for supervision of Rehabilitation and Upgradation from Km. 0.000 to Km. 51.600 of NH321G (Agra (Junction on NH509 at Tedhi Baghia) to Nuhkhas) to 2 lane with PS configuration in the state of Uttar Pradesh on EPC mode.
Construction of 03 nos. of 3 lane ROBs and 07 no of VUPs on 6L Delhi Agra Section old NH-2 (New NH 44 and 19) from Km. 20.500 to Km. 200.000 in the State of Haryana and Uttar Pradesh on EPC Mode.
Const.of 4L AC GF alignment of Southern bypass to Jhansi and CL for NH44 n NH39 from Km.16.920 of NH44 near Bangay khas vill.DC 0.030 and terminating forming T junc at Km6.650 of NH39 near Orchha Tigela DC15.542 L15.572km in MP and UP on EPC mode
Construction of 84 nos. T III, 28 nos. Type IV and 28 nos. Type V Quarter including Internal EI and Fans Fire Fighting Fire Alarm System and Development work at AIIMS Raebareli UP on EPC basis. SH-Hiring of inspection vehicle Work Contingencies
Construction of 2x63 MVA 132KV S/S Sujroo, Muzaffarnagar on turnkey basis
Construction of 220kV Substation Mohan Road (Anant Nagar Yojna), Lucknow On Turnkey Basis
EPC PACKAGE FOR BESS (400MWH) IMPLEMENTATION AT NTPC MOUDA-Bidding Doc No CS-9575- 171C-9
Establishment of Cyber Investigation and Digital Assistance Labs (CIDAL) on a Turnkey basis 2.0
RFP for Development of Way Side Amenities along Purvanchal Expressway PE-5 Azamgarh LHS, PE-6 Azamgarh RHS, PE-7 Mau LHS, PE-8 Ghazipur RHS with Concurrent Period of Five Years for DLP and Operation and Maintenance on EPC Mode.
Construction of a 2 cell grade Separated Structure with 20m span each at Amila Village on NH 29 as a long term road Safety measure on EPC Mode for the package of 4laning of Varanasi Gorakhpur Section of NH-29
Construction of Light Vehicular Underpass LVUP at Pidhwal Mod as a long term road Safety measure on EPC Mode for the package of 4 laning of Varanasi-Gorakhpur Section of NH-29 Package III in the State of Uttar Pradesh
RFP for Development of 04 Way Side Amenities along Purvanchal Expressway PE-1 Barabanki LHS PE-2 Amethi RHS, PE-3 Sultanpur LHS, PE-4 Sultanpur RHS with Concurrent Period of Five 05 Years for DLP and O and M on EPC Mode.
Construction of 220/33kV, 4x60MVA GIS S/s Saraswati Hi-Tech City (Prayagraj) on Turnkey Basis
CONSTRUCTION OF 33KV LINE FROM NEW PROPOSED 132/33KV GHAZIPUR Ist MARDAH TO PUMP CANAL MARDAH GHAZIPUR ON SEMI TURNKEY BASIS.Ist MARDAH TO PUMP CANAL MARDAH, GHAZIPUR ON SEMI TURNKEY BASIS.
Construction of 02 Nos. 220kV GIS Feeder Bay at Existing 220kV HGIS Jewar Extension, Noida on Turnkey Basis
EOI for empanelment of EPC contractors for awarding the work related to Solar Photovoltaic Systems as per details in EOI document.
INSTALLATION OF CAPACITOR BANK FOR 33/11 KV SUB-STATION AMADA (5MVA) DISTT. CHANDAULI ON SEMI TURNKEY BASIS.
Construction of 02 Nos. 132kV AIS Feeder Bay at 220kV Substation Partapur (Meerut) for IMLC Meerut on Turnkey Basis
Engineering, Supply, Erection and Commissioning for Increasing Capacity at 220kV Substation Hardoi from 02 Nos. 160 MVA to 03 Nos. 160 MVA on Turnkey Basis
Electrification work of Gramsabha Benti Uaparhar form MLA Nidhi under Electricity Distribution Division, Kunda, Pratapgarh on semi turnkey basis including loading and unloading of material.
Establishment of Advanced Semiconductor Processing Cleanroom Facility on Turnkey Basis including Design, Engineering, Supply, Installation, Integration and Commissioning in Dept. of Electronics Engineering, IIT(BHU), Varanasi.
Selection of Agencies for Supply, Installation, Maintenance, and Uninstallation of Tents on Turnkey basis with complete facilities, Hangars and Pagodas on rental basis for Magh Mela 2026-27
Supply of Materials and Erection for 33 KV line Meja Tahasil from 132 KV S/S Meja Road Distt.-Prayagraj in Business Plan 2024-25 on Semi Turnkey Basis Under Prayagraj-I
Shifting work of Poles and lines for the widening and strengthening of the FatanpurBirapur Road Other District Road under Full Deposit Scheme within the jurisdiction of Electricity Distribution Division, Raniganj, Pratapgarh on semi turnkey basis