Tender Value
₹1262.9 Cr
EMD Value
₹25.3 Cr
Closing Date
12 Oct 2026, 3:00 pm
Engineering, Procurement and Construction (EPC) Agreement with Schedule G-1 For third line track between Manikpur (excluding) to Iradatganj (including) (Ch: 1257.180 to 1340.820) including Electrification & Signaling works along with construction of ROB on LC No. 404/C2, 406/2T, 407/2E & 418C/2E and RUB in LC no 426 in connection with Manikpur-Iradatganj 3rd line project of North Central Railway
EPC-2026-27-02
EPC-2026-27-02
Open
Works - General
24 Months
Etah, Uttar Pradesh
₹0
₹25.3 Cr
8 Jul 2026
8 Jul 2026
28 Sept 2026
15 Sept 2026
G1A-For Bridge Foundation and Substructure Works Below/P
G1B-Electrical Utility Shifting 170230661.44 Below/P
Item Breakup - G1A-For Bridge Foundation and Substructure Works
With provision of one 50mm Metre wide retro-reflective tape in horizontal direction, duly secured/tight with vertical posts. Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out the execution of the work and shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be the property of the Contractor.
With 3 horizontal bamboo / balli RM members of minimum 50mm dia. spaced equally
Joining with strong nylon rope RM in one cross and one horizontal pattern of minimum 5mm dia.
Shoring with 'Z' section MS Sqm sheet piles side by side in all kinds of soil mechanically or manually as per approved drawing with contractor's own arrangement complete in all respects and removal of sheet piles after completion of the w o r k as directed by engineer in-charge Note: Payment will be made as per actual driven length of pile. DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY Exploratory drilling of boreholes down to required depth, drilling of 150mm dia. boreholes in all type of soils except hard rock & large boulders (boulder core more than 30cm) including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion/chiselling tool for advancing through occasional seams of hard strata to be employed, where necessary in Dry area.
Taking out 100mm dia. & Each 450mm long undisturbed samples of soil from bore holes, including provision of air tight containers for packing and, labeling incl. transporting the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS:2720.
Taking out 100mm dia. & Each 450mm long disturbed samples of soil from bore holes, including provision of air tight containers for packing, labeling and transporting the samples to laboratory. Samples shall be collected as per IS:2720.
Conducting penetration test as per IS:2131 at approximate1.5m intervals in bore holes, as directed by the Engineer in charge
Collection of water samples at Each required intervals Conducting laboratory Tests on collected soil samples as per relevant IS code
Moisture Content/Dry Density
Atterberg Limits
Specific Gravity
Grain size analysis including Each Hydrometer analysis
Direct Shear Test
Natural Density
Consolidation Test
Tri-axial Test DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils
Hard rock (blasting prohibited ) cum Providing and laying in position Plain cement concrete of specified Nominal Mix for miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of C e m e n t , centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse cum sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY
Providing and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Wing wall and Return wall
Abutment Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc.
Providing and laying Plain cum Cement Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer.
Providing and fixing Weep Metre Holes in Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY Boring, providing and installation of bored cast in-situ Reinforced Cement Concrete piles of specified diameter and length below pile cap of specified grade with Design Mix Cement Concrete, using 20mm graded crushed stone aggregate and coarse sand of approved quality, to carry a safe working load not less than specified, concreting by machine batching, machine mixing, scaffolding, using Admixture in approved proportion (as per IS:9103), placing with tremie pipe, chipping off of pile top to remove laitance concrete above cut off level etc., pumping and bailing out water, by percussion drilling using Direct Mud Circulation (DMC) or Bailor and Chisel technique by tripod and mechanical Winch machine, complete in all respect as per approved drawing, specification and direction of the Engineer in charge. Note: 1. Payment for only cement, reinforcement and permanent casing pipe (if any ) shall be made extra. 2. Length of the pile for payment shall be measured up to the bottom of RCC pile cap. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
1200mm diameter
Providing, installing permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part- IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer.
Initial load test above 100 ton Each and up to 250 T capacity pile
Extra for every increase of 50 Each ton in pile capacity or part thereof over 250 ton
Routine Load Test above 100 Each ton capacity up to 250 ton capacity pile Lateral load testing of single pile in accordance with "IS Code of practice IS:2911 (Part- IV) for determining safe allowable lateral load of pile" with all labour, material, tool & plants, equipment, machinery, etc complete as per drawing and specification as directed by the Engineer.
Piles with lateral load capacity Each of up to 50 ton
Piles with lateral load capacity Each of above 50 ton and up to 100 ton
Pulse Echo Test (PET) for Each integrity testing of piles with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports in triplicate as per satisfaction of the Engineer in Charge.
Providing and applying two Sqm coats of coal tar or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub- Sqm structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY
Extra for additional height over Sqm item no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof. Supply and using Cement at Worksite
Ordinary Portland Cement 43 MT grade approved brands/makes Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Thermo-Mechanically Treated Kg bars of grade Fe-500D or more of approved brands/makes. Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. 44 022011(022020) Extra over item nos. 022011 to cum 56534.00 39.33 2223482.22 022014 for executing the work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] 45 022012(022020) Extra over item nos. 022011 to cum 56550.00 81.07 4584508.50 022014 for executing the work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY 46 022014(022020) Extra over item nos. 022011 to cum 56534.00 222.88 12600297.92 022014 for executing the work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] Total 2029444271.96
Item Breakup - G1C-unforeseen items
Girth over 30 cm and up to 60 Each cm
Girth over 60 cm and up to Each 1.5m
Girth over 1.5m up to 3 m
Supplying, driving and erecting Metre in all types of soils, hard wood pile 5m to 7m long without joint, 125mm average dia. for protection of bank slope including two coats of coal tar paint complete, as directed. Note: Payment will be made as per actual driven length of pile. DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY
Driving rails 90R/52 Kg section Metre below average ground level within the slope/toe of embankment including making of nose with contractor's own arrangement complete in all respect Note: Payment will be made as per actual driven length of rail which will be supplied free by Railways at the site of work.
Shoring with 'Z' section MS Sqm sheet piles side by side in all kinds of soil mechanically or manually as per approved drawing with contractor's own arrangement complete in all respects and removal of sheet piles after completion of the w o r k as directed by engineer in-charge Note: Payment will be made as per actual driven length of pile. Unloading of released track panels consisting of all types of rails & sleepers from Railway wagon at PQRS Depot, using portal cranes including dismantling of released panels to rails, sleepers & fastenings and stacking them material- wise and classification-wise at nominated locations within the yard limits with all leads, lift and crossing of tracks.
With Railway's portal crane for TRM PSC sleeper track
With Railway's portal crane for TRM other than PSC sleeper track
Providing group of 2 men for Day doing various miscellaneous works for Railway's PQRS cranes (one set of 2 portals) for proper upkeep of crew rest van / rest room, as directed by the machine in-charge by : (1) Fuelling the machine, duly bringing diesel / hydraulic oil from the stacked drums; (2) Bringing water to the staff rest van or staff rest room, cleaning rest van / rest room, cooking food for Track Machine staff or bringing food from outside (cost of food shall be borne by the staff concerned).
Guarding and watching the Shift Track machine / group of machines, spare parts, oils, grease etc. of PQRS cranes (one set of 2 portals) during day and night time in a shift of 12 hours each, at all locations wherever necessary, as instructed by the machine in- charge. Note: One shift comprises of 12 hours. DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY
Through Rail renewal with free TRM service rails of all types by removing existing running rails, already cut into free rails / rail panels for making auxiliary track, including attending alignment, cross level, gauging, packing; wherever required including crossing of track, as directed.
Carrying out preparatory works TRM before operation of Track Relaying Train (TRT), such as - (1) Broken corroded sleepers to be removed and fastenings to be loosened; (2) Excess ballast to be removed up to bottom of sleepers; (3) Check rails of level crossings falling in the range of work to be removed; (4) In case of CTR, rail panels placed at 1.5m away from existing track centre; (5) All existing longer wooden sleepers if available or interlaced sleepers of different height to be removed; (6) Cutting of existing rails to 6m piece closure at work site from where Track Relaying Train (TRT) will start working on that day; (7) Removal of Reverse jaw type CST-9 sleeper if available joggled fish plates, OHE bonds & other obstructions etc. 8. Removal of Guard Rails at bridge locations other than Girder Bridges. 9. Rail cutting and drilling shall be paid separately under relevant item. Dismantling of existing Turnout by removing switches, rails, crossings, check rails, sleepers and all fixtures and stacking all released materials, removing ballast and muck by excavating up to required depth, preparation of formation bed, laying of pre assembled Turnout by Railway's T-28 machine, linking of track with all fittings, filling up of ballast duly screened, packing, adjusting, opening & housing of switch, testing operation of switch assembly and attending track parameters, so as to make track fit for 20 kmph speed including disposing off muck to indicated places up to free lead after the block working etc. complete. Note: Rate includes making necessary preparation for T-28 machine movement like preparation of approaches, transportation and laying of wooden sleepers/blocks, etc.
1 in 8½ Turnout DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY
1 in 12 Turnout Dismantling of existing switch by removing switches, sleepers, fixtures and stacking all released materials, removing ballast and muck by excavating up to required depth, preparation of formation bed, laying of pre-assembled switch by Railway's T-28 machine, linking of track with all fittings, filling ballast duly screened, aligning, packing, adjusting, opening & housing of switch, testing operation of switch assembly and attending track parameters so as to make track fit for 20 kmph speed including disposing off muck to indicated places after the block working etc. complete. Note: Rate includes making necessary preparation for T-28 machine working/movement such as providing and removing rail closures, preparation of approaches, transportation and laying of wooden sleepers/blocks, etc.
Pre, during, and post BCM TRM works for deep screening of ballast in Points and crossings with all contractor's labour, tools and plants as required to carry out the work to the standards in specific time including crossing of tracks etc. complete and as directed by the Engineer - in - charge. I. Pre-BCM Operation : a) making trenches for insertion of cutter bars at various locations as per the directions of engineer in charge. i.e.., one trench ahead of one rail length from SRJ and second trench near sleeper No 62 ( 1in 12) etc., b) Filling up ballast up to sleeper level. c) Tightening of fittings/ plate screws, ERCs, Stud bolts, check rail bolts. II. During BCM Operation : a) Assistance to S&T Department : Opening of cables at approach of Points & Crossings, TLD Boxes/ removing of Point motor and refixing the same and covering cables after passing of BCM in block period with S&T Staff. b) Engineering : c) Removing of two long sleepers i.e.., sleeper No 3 & 4 and refixing the same in position during block after passage of BCM. d) Removing obstruction i.e.., S&T CC block duly digging with crow bars and breaking with chisel/ hammer, cutting of rail pegs with gas. e) To remove, excess DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY ballast on rail table for free movement of BCM and for packing purpose. f) Extension of cutter bar wherever required in assisting machine staff. g) Removing of cutter bar/ Chain links from the trenches after screening work by BCM. III . Post BCM Operation : a) Packing switch portion including Motor long sleeper i.e.., SRJ to heel joint to reset Point for train movement & initial packing of lead portion to allow train at 20KMPH and lifting the track in two stages (50mm to 75mm in each lift) wherever required for correcting the longitudinal surfacing b) Dumping of ballast in the deficient portion in crib, on main line turnout side for initial packing purpose. c) Boxing / Levelling of muck duly ensuring levelling of muck on cess side and lowering of cess to the deep screened depth and removing of muck in between the lines and leading up to 250mts. Note: 1. For technical reasons, some of the points and crossings cannot be deep screened either fully or partially by BCM, in which case, the left over length will be deep screening manually. 2. The length of points and crossings assembly for payment of this item should be taken from SRJ to longest concrete sleeper available just beyond heel of crossing along main line. DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY Carrying out pre-tamping, during tamping and post- tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re-adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile.
For day time block working
For night time block working DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY
Carrying miscellaneous works, for proper upkeep of crew rest van / rest room as directed by machine in-charge of Track Machines by providing a team of 2 labours for 12 hours shift, broadly mentioned hereunder: (1) Bringing water from nearby source and cleaning machine with water jet or any suitable means; (2) Fuelling machine duly bringing diesel / hydraulic oil from the stacked drums; (3) Bringing water to staff rest van or staff rest room, cleaning rest van / rest room, cooking food for Track Machine staff or bringing food from outside (cost of food shall be borne by the staff concerned).; (4) Guarding & watching machines, spare parts, oils, grease etc. during day and night time at all locations, wherever necessary, as instructed by the machine in-charge; (5) In case, contractor provides less no. of Labour/Mate, payment will be deducted for each such person @ 75% of the accepted item rate.
Carrying out ancillary works Shift required for UTV working under line block i.e., turning of rails/ Sleepers and keeping in position for fixing of UTV clamps to rail, keeping rails/PSC Sleepers in position while loading into BFR, removal of clamps on BFR for releasing loaded rail/Sleepers, adjusting of rails/Sleepers on BFR etc. by providing minimum of three men in a shift of 8 hours, with all contractor's tools, all lead, lift, crossing of tracks etc., complete and as directed by the engineer - in - charge. Note: In case, contractor provides less no. of Labour, payment will be deducted for each such p e r s o n @ 2/3 rd of the accepted item rate. DYCE-C-ALD-ENGINEERING/NORTH CENTRAL RLY Providing lighting arrangements with halogen lamps on and around machine during machine working in night time blocks, with contractor's generator, consumables, all necessary electrical fittings, operators etc. Note: 1. Lighting arrangement is to be provided as per advance planning of Night Blocks and written communication. 2. In case lighting arrangement is made available but not used due to non-availability of block, payment @ 60% of the item rate shall be made. 3. In place of Halogen, LED lamps of equal lumen capacity may be used with the approval of Engineer - in-Charge. 4. If lighting arrangement fails during block, recovery shall be made twice the rate per day.
BCM/FRM/UNIMAT generator and 12x500 W)
CSM / DUO / 3X with or without Night DGS (7.5 KVA generator and 8x500 W) Total 46214738.20
Item Breakup - G1C-Unforseen items civil
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SchematicarrangementforPlatformutilityductsregarding1.pdf
ATTACHMENT
1.0m.pdf
ATTACHMENT
2.0m.pdf
ATTACHMENT
2.5m.pdf
ATTACHMENT
GM-ZRReductionofATWeldinginIR1.pdf
ATTACHMENT
SHANKARGARH.pdf
ATTACHMENT
BEVARA.pdf
ATTACHMENT
MADARAHA.pdf
ATTACHMENT
JASRA.pdf
ATTACHMENT
IRADATGANJ.pdf
ATTACHMENT
PCEsSafelyCircularNo.103Revised.pdf
ATTACHMENT
ESPsforMKPIDGJ3rdline_merged.pdf
ATTACHMENT
231020TIIN0042OHEguidelines.pdf
ATTACHMENT
PFsheltermerged.pdf
ATTACHMENT
PFsheltermerged_1.pdf
ATTACHMENT
type-IIqtr.pdf
ATTACHMENT
type-IIIqtr.pdf
ATTACHMENT
type-IVqtr.pdf
ATTACHMENT
type-Vqtr.pdf
ATTACHMENT
10271-1R-Detailsofreinforcement.pdf
ATTACHMENT
BA-10257.pdf
ATTACHMENT
StandardLayoutofStationBuilding12_compressed.pdf
ATTACHMENT
TPBR-95-2022-RB-METALFENCING_V7_APPROVE_P172.pdf
ATTACHMENT
RDSO-B-10402.pdf
ATTACHMENT
RDSO-B-10405-1_merged.pdf
ATTACHMENT
PFsurfacespecification.pdf
ATTACHMENT
ROBATLC-418IDGJ-MKP3RDLINE_V8.pdf
ATTACHMENT
TypicalCrossSectionDrainBetweenDNMain3rdLine.pdf
ATTACHMENT
GADOFBR-1338-11X1.2MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1338-11X1.2MRCCBOXModel_1.pdf
ATTACHMENT
GADOFBR-1337-21X1.2MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1337-11X1.2MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1336-11X3.05MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1335-11X2.0MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1258-1_2X12.2PSCSLAB_1.pdf
ATTACHMENT
GADOFBR-1261-1_1X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBRIDGENO.1260-1NYN-MKP.pdf
ATTACHMENT
GADOFBR-1262-12x9.15PSCSLAB.pdf
ATTACHMENT
GADOFBR-1264-1_2X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBR-1265-1_1X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBR-1266-2_1X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBR-1267-1_1X30.51X18.3COMPOSITEGIRDER.pdf
ATTACHMENT
GADOFBR-1268-1_1X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBR-1271-13x9.15PSCSLAB.pdf
ATTACHMENT
GADOFBR-1272-1_1X12PSCSLAB.pdf
ATTACHMENT
GADOFBR-1272-2_1X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBR-1274-2_3X6.1PSCSLAB.pdf
ATTACHMENT
GADOFBR-1276-1_1X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBR-1277-13X9.15_PSCSLAB.pdf
ATTACHMENT
GADOFBR-1280-1_5X6.1MPSCSLAB.pdf
ATTACHMENT
GADOFBR-1281-1_1X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBRIDGENO.1283-1NYN-MKP.pdf
ATTACHMENT
GADOFBRIDGENO.1284-1NYN-MKP.pdf
ATTACHMENT
GADOFBRIDGENO.1286-1NYN-MKP.pdf
ATTACHMENT
GADOFBRIDGENO.1288-1NYN-MKPSH1SH2.pdf
ATTACHMENT
GADOFBR-1292-13x9.15PSCSLAB.pdf
ATTACHMENT
GADOFBR-1293-2_1X18.3COMPOSITEGIRDER.pdf
ATTACHMENT
GADOFBR-1294-11X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBR-1257-11x9.15PSCSLAB.pdf
ATTACHMENT
GADOFBR-1257-21.2MX1.8MRCCBOX.pdf
ATTACHMENT
GADOFBR-1259-11X6.1PSCSLAB.pdf
ATTACHMENT
GADOFBR-1263-11x9.15PSCSLAB.pdf
ATTACHMENT
GADOFBR-1263-21x9.15PSCSLAB.pdf
ATTACHMENT
GADOFBR-1266-11x9.15PSCSLAB.pdf
ATTACHMENT
GADOFBR-1274-11x9.15PSCSLABRUB.pdf
ATTACHMENT
GADOFBR-1276-21X6.1PSCSLAB.pdf
ATTACHMENT
GADOFBR-1275-11X6.1PSCSLAB.pdf
ATTACHMENT
GADOFBR-1278-11x9.15PSCSLAB.pdf
ATTACHMENT
GADOFBRIDGENO.1289-1NYN-MKP.pdf
ATTACHMENT
GADOFBRIDGENO.1289-2NYN-MKP.pdf
ATTACHMENT
GADOFBRIDGENO.1289-31295-11296-1NYN-MKP.pdf
ATTACHMENT
Tenderdocument.pdf
ATTACHMENT
RFP_1.pdf
ATTACHMENT
ROBATLC-404IDGJ-MKP3RDLINE.pdf
ATTACHMENT
ROBATLC-406IDGJ-MKP3RDLINE.pdf
ATTACHMENT
ROBATLC-407IDGJ-MKP3RDLINE.pdf
ATTACHMENT
GADOFBR-1334-21X1.2MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1334-11X2.0MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1332-21X1.2MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1331-11X1.2MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1327-31X2.0MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1327-11X1.2MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1323-1H1X6.1MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1323-1A2.0MX4.0MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1323-11X6.1MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1322-21X2.0MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1322-11X6.1MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1321-31X9.15MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1321-12X3.05MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1318-11X4.57MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1298-11X3.05MPSCSLAB.pdf
ATTACHMENT
GADOFBR-1299-11X2.0MRCCBOX.pdf
ATTACHMENT
GADOFBR-1301-1_10X6.1MPSCSLAB.pdf
ATTACHMENT
GADOFBR-1305-1_1X1.2MRCCBOX.pdf
ATTACHMENT
GADOFBR-1306-12X3.0MRCCBOX.pdf
ATTACHMENT
GADOFBR-1309-11X3.05MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1309-21X3.05M_PSCSLABModel.pdf
ATTACHMENT
GADOFBR-1310-2_1X12.2PSCSLABModel.pdf
ATTACHMENT
GADOFBR-1317-11X3.05MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1316-11x6.1MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1314-21X6.1MPSCSLABModel.pdf
ATTACHMENT
GADOFBR-1311-11x9.15PSCSLABModel.pdf
ATTACHMENT
GADOFBR-1297-2_1X12.2PSCSLAB.pdf
ATTACHMENT
GADOFBR-1304-1_1X30.51X18.3COMPOSITEGIRDER.pdf
ATTACHMENT
GADOFBR-1301-1_10X6.1MPSCSLAB_1.pdf
ATTACHMENT
GADOFBR-1310-2_1X12.2PSCSLABModel_1.pdf
ATTACHMENT
GADOFBR-1314-13X6.0MRCCBOXModel.pdf
ATTACHMENT
GADOFBR-1323-1B1X30.5MCompositeGirderModel.pdf
ATTACHMENT
L-sectionMKP-IDGJ3rdlinemerged_compressed.pdf
ATTACHMENT
L-SECTIONMKP-IDGJ3RDLINESHEET01KM.1256.720-KM1261.73206-25_V6.pdf
ATTACHMENT
L-SECTIONMKP-IDGJ3RDLINESHEET02KM.1261.732TOKM1266.732BR1262.1TO1266.1.pdf
ATTACHMENT
GADOFROR.pdf
ATTACHMENT
DETAILSOFDRAIN_08.07.2026.pdf
ATTACHMENT
TenderDocumentVetted.pdf
ATTACHMENT
ApprovedRFP_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].