Loading…
Loading…
63 live21 closing this weekmost from National Highways Authority of India and Jodhpur VVNL - MD
63 results • Best match
PROVN OF SWIMMING POOL AT ABOHAR ON EPC MODE
Upgradation and construction work for Nasirabad Sarwar Kekri Road (SH 26 From 2 Lane to 4 Lane (Phase-II) in State of Rajasthan on Engineering Procurement and construction (EPC) (Total Design Length – 48.419 Km)
Upgradation and Construction work for Nasirabad Sarwar Kekri Road (SH 26 from 2 Lane to 4 Lane (Phase-II) in the State of Rajasthan on Engineering Procurement and Construction (EPC) (Total Design Length 48.419 Km)
Construction of Sub District Hospital at Niwai, District Tonk on EPC Basis
Construction of Sub District Hospital at Bhinmal, District Jalore on EPC Basis
Construction of Sub District Hospital at Ahore, District Jalore on EPC Basis
Construction of Sub District Hospital at Kelwara District Baran on EPC basis
Construction of Sub District Hospital at Bhawanimandi District Jhalawar on EPC basis
Construction of Sub District Hospital at Dag District Jhalawar on EPC basis
Construction of Sub District Hospital at Pawta, District Kotputli-Behror on EPC Basis
Construction of Sub District Hospital at Viratnagar, District Kotputli-Behror on EPC Basis
Construction of Sub District Hospital at Choti Sadri, District Pratapgarh on EPC Basis
Construction of 4 Lane Mukundra Bypass on Kota-Jhalawar Section of NH-52 in the State of Rajasthan on EPC Mode.
Upgradation to four lane carriageway with paved shoulders of the Nagaur City Left Out Stretch in the State of Rajasthan on EPC Mode
Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode.
Construction of 2 Lane ROB in Lieu of LC-09 at IR Km 340/9-341/0 Ratangarh-Degana Section on Ratangarh- Chhapar Road (SH-07C) in District Churu EPC Mode
Development or construction of entry exit arrangement AT 4 Lane Greenfield Expressway SPUR from Delhi Vadodara Greenfield Expressway near Bandikui to Jaipur section of NE 4C in the state of Rajasthan on EPC Mode.
Construction of 2256 Science Laboratories (Physics, Chemistry and Biology) in 922 Government Schools of Rajasthan at different locations on EPC Basis for Rajasthan Council of School Education, Jaipur
SC services during OnM stage of 2LPS of Karauli Dholpur section of NH 23, and 2LPS of Uncha Nagla Khanuan Roopvas Dholpur section of NH-123 in the on EPC mode. (Total Length 175.908 km.)
Construction of 4 L of Ujjain Jhalawar Sec of NH 552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli Kadiya (PKG 1) in the State of Madhya Pradesh on EPC Mode under NH(O).
Construction of 4L of Ujjain Jhalawar Sec of NH 552G from Ch.86.500 Aakli Kadiya to Ch.159.263 Jhalawar (Jn with NH52) PKG 2 in the State of Madhya Pradesh and Rajasthan on EPC Mode under NH(O)
CS for Supervision Consultant during OnM of 8L AC GF DVE NH148N starting at Sohna Gurugram Road NH248A near Alipur vill to Haryana Rajasthan Border Ch.0.000 to Ch.78.800 in Haryana on EPC mode under Bharatmala Pariyojana
Overlay at various stretches of 6-lane access-controlled Greenfield Highway from km 67.000 to km 99.000 of Rajasthan Gujarat Border to Santalpur section of NH-754A in Gujarat on EPC mode at Risk and Cost of existing Contractor
SC for OnM of 6L Access Controlled Greenfield Highway of Sangariya (Near Chautala) to Rasisar (near Bikaner) Section of NH 754A as part of Amritsar Jamnagar Economic Corridor in the state of Rajasthan on EPC mode under Bharatmala Pariyojna(CSP 2)
SC for OnM of 6L Access Controlled Greenfield Highway of Sangariya (Near Chautala) to Rasisar (near Bikaner) Section of NH 754A as part of Amritsar Jamnagar Economic Corridor in the state of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojn
SC for OnM of 6L Access Controlled Greenfield Highway of Sangariya (Near Chautala) to Rasisar (near Bikaner) Section of NH 754A as part of Amritsar Jamnagar Economic Corridor in the state of Rajasthan on EPC mode under Bharatmala Pariyojna(CSP 3)
Rectification work on 8L access controlled expressway section of Delhi- Vadodara Green Field Alignment (NH 148N)on EPC Mode under Bharatmala Pariyojana in Rajasthan in the state of Rajasthan on Risk and Cost of Contractor on Item Rate basis (Pkg 13)
Rectification work on 8L access controlled expressway section of Delhi- Vadodara Green Field Alignment (NH 148N)on EPC Mode under Bharatmala Pariyojana in Rajasthan in the state of Rajasthan on Risk and Cost of Contractor on Item Rate basis (Pkg 14)
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli-Kadiya (Package-1) in Madhya Pradesh on EPC Mode under NH(O)
NIT for Establishment and Development of State of Art Trauma Center (Level-1) on Turn Key Basis along with Medical Equipment at RUHS Hospital of Medical Sciences, Jaipur
NIT for Establishment and Development of State of Art Trauma Center (Level-1) on Turn Key Basis along with Medical Equipment at RUHS Hospital of Medical Sciences, Jaipur
SUPPLY AND INSTALLATION OF GENERAL AND MEDICAL EQUIPMENT ALONG WITH PLUMBING WORK, ELECTRICAL AND CIVIL WORK FOR NEW I.P.D. AND NEW O.P.D. IN MBS HOSPITAL, KOTA ON TURN KEY BASIS
Construction of Lateral & Axial Road in the state of Punjab & Rajasthan along the Indo-Pakistan Border (SH: Lateral Road, Bikaner sector Package-II from BP no 438/M to 474/3 and Lateral Road North Jaisalmer Sector, Package-V(a) from BP no 474/3 to ... on EPC mode ).(SH: ...
Estabilishment of Modular OT on Turnkey Basis
Establishment of Modular OT on Turnkey Basis
Strengthening of Udaipur-Sabroom section from km 55.000 to km 127.372 of NH-08 and Raising and drainage provision in selected stretches of Agartala-Udaipur section of NH-08 in the State of Tripura on EPC mode
The work of Provision of Air Cooling in Jaipur Laundry on a Turnkey Basis.
Execution of Balance Works for Major Redevelopment of Jodhpur Railway Station of North Western Railways on Engineering Procurement & Construction (EPC)
Pre-bid Tie up of AIR HANDLING SYSTEM for 4X700 MW ASHVINI MAHI BANSWARA UNIT 1-4 Nuclear Island Mega EPC Package (NIMEP).
EPC Package with Land for Development of Grid Connected Solar PV Projects of Aggregate Capacity up to 1000 MW in the States of Punjab and Rajasthan including Comprehensive Operation and Maintenance for Five Years
Compressed Air System with Drop Points & Associated Works for Line no. 9 and 10 at Khatipura Coaching Depot, Jaipur on a Turnkey Basis.
Installation of 500 Sq. mm and 630 Sq. mm 132 kV XLPE underground copper cable work at 220 kV Switchyard Dahra on Turnkey basis under BN-9074002603
EPC Package with Land for Development of Grid-Connected Solar PV Projects of Aggregate Capacity up to 1000 MW in the States of Punjab and Rajasthan, including Comprehensive Operation & Maintenance for Five (5) Years.
Avenue Plantation and Cactus Plantation works at Risk and Cost of EPC contractor, along Amritsar to Jamnagar Section of 6L of (Rasisar) to (Deogarh) (near Dhadhaniya) section on NH 754K in the State of Rajasthan
The supply, installation, testing, and commissioning of the air compressor line connection network approximately 1200 meters (including the yard, ROH, and bogie section). At the Wagon care complex, Phulera on a Turnkey Basis.
New 33 by 11 KV Sub-stations Augmentation or Addition capacity including associated line and other works for the DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE in JdVVNL under RDSS scheme on Turnkey Mode Under Phalodi Circle.
New 33 by 11 KV Sub-stations Augmentation or Addition capacity including associated line and other works for the DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE in JdVVNL under RDSS scheme on Turnkey Mode Under Churu Circle.
New 33 by 11 KV Sub-stations Augmentation or Addition capacity including associated line and other works for the DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE in JdVVNL under RDSS scheme on Turnkey Mode Under Jaisalmer Circle.
New 33 by 11 KV Sub-stations Augmentation or Addition capacity including associated line and other works for the DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE in JdVVNL under RDSS scheme on Turnkey Mode Under Barmer Circle.