Loading…
Loading…
51 live44 closing this weekmost from CE-BM,LMB Basin,BBSR and East Coast Railway
51 results • Best match
S.R to Flood damage road portion from Ch. 5.700 km to 5.900 km of Khajuripada Nuagada Road in the District of Gajapati for the year 2026-27
Improvement to Mahanadi Right Embankment from Satakhanda to Kurumchain
Restoration to KV Right Embankment from RD 27.00Km. to 27.250Km.
Restoration to Kuakhai Left Embankment from RD 735Mtr. to 950Mtr.
Restoration Bhargavi Left Embankment at RD 33.20Km. to RD 33.50Km.
Improvement to Tikina Saline Embankment from RD 3.80Km. to 5.80Km.
Construction of Guard Wall on Dhanua Left Embankment near village Podapada.
Construction of Guard Wall on Dhanua Left Embankment near village Siaro.
Restoration to Bhargavi Left Embankment from RD 12.50Km. to RD 12.820Km.
Restoration to Bhargavi Left Embankment from RD 32.30Km. to RD 32.50Km.
Improvement to Scoured Portion of Tikina Saline Embankment near Village Tikina.
Improvement to Mahanadi Right Embankment from Baideswar to Satakhanda with launching and packing.
Improvement to Kushabhadra Right Embankment from RD 16.50Km. to 17.00Km. near Bhoisahi.
Improvement to Mahanadi Right Embankment and Rana Right from Karabar to Ramachandrapur in Banki Block
Restoration to Spur and Launching Portion of Tikina Saline Embankment from RD 0.40Km. to 1.00Km.
Protection to Scoured Bank on KSDR Embankment from RD.61.5 Km to 61.65 Km and from RD.62.00 Km to 62.40 Km
S/R to PWD road from Kathajodi Embankment to Dandamahavir temple at patches (such as pothole repair and restoration of depressions due to heavy rain) for the year 2026-27.
5)Restoration to scoured bank from RD 360 mtr. to RD 550 mtr. and from 560 mtr. to 675 mtr. at Mahanadi Right Embankment for the year 2026-27.(MBD52/2026-27)
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Viaducts, Tunnels, Protection works, BLT works, P.Way Track works with Contractor's own materials (except New/SH Rails), construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification, Provision of 1X25 kV Conventional Type OHE, Tunnel OHE with ROCS, Tunnel lighting, TSS, SP, General Power Supply Arrangements Modifications/Conversion to Underground for Overhead electrical HT/LT Power line Crossings etc on EPC Basis in Waltair Division of East Coast Railway.
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Road Over Bridge (ROB's), Protection Works, P.Way Track Works with Contractor's own materials(except New/SH Rails) construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor electrification, Provision of 1x25 KV Conventional type OHE, Provision of 2 Nos. TSS, 1 No SP, Construction of new Sub-stations, Electrification of station building, Circulating areas, FOBs, PFs, Quarters, Goomties, Modification/Conversion to Underground for overhaed electrical HT/LT power line crossings etc. on EPC Basis in Rayagada Division of East Coast Railway.
Jeypore - Nabarangpur New BG Railway Line project: Design & Construction of New BG Railway Line between Ambaguda(excluding) (13.60 Km) to Nabarangpur(including) (43.996Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(excluding bridge no. 85 at km. 37.080 i.e. Indravati Bridge), Road Over Bridges (ROBs), Road Under Bridges (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleepers, Special PSC Sleepers (for Turnouts, Improvised SEJs, Guard Rails etc), Points (Thick Web Switches) & WCMS Crossings, Glued Joints, H-Beam/Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, 2x25 KV AC OHE Works, 2x25 KV TSS with SP/SSP works along with SCADA, modification/Conversion to Underground for Overhead Electrical HT/LT Power Line Crossings, Electrical General Services, construction of Platforms, Station Buildings, Service Buildings, SP/SSP Buildings, TRD depot building with Tower Wagon shed, Residential Buildings, Water Supply, indoor and outdoor Electrification etc. on EPC Basis in RGDA Division of East Coast Railway"