Loading…
Loading…
625 results • Best match
Redevelopment of Sati Kund at Kankhal, Haridwar on Engineering, Procurement and Construction (EPC Mode) Basis along with Operation and Maintenance for 5 Years
Strengthening work from Km 68.570 to 75.00 on NH-107 in the State of Uttarakhand through an Engineering, Procurement and Construction (EPC) Contract.
DETAILED DESIGN, ENGINEERING, PROCUREMENT AND CONSTRUCTION OF 300 BEDDED HOSPITAL AT HARRAWALA, DEHRADUN, UTTARAKHAND FOR NATIONAL HEALTH MISSION (NHM), UTTARAKHAND ON EPC CONTRACT BASIS
Construction of 480 m and 120 m Span Bridge over Kiroda Nala in Gram Panchayat Nayakgoht in Tanakpur, Distt Champawat, Uttarakhand on Engineering, Procurement and Construction (EPC) Mode 2nd call
CONSTRUCTION OF VISHRAM SADAN (NIGHT SHELTER) AT AIIMS RISHIKESH ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC)
Construction of New Campus of Indian Institute of Information Technology, Kalyani West Bengal on Engineering, Procurement and Construction (EPC) basis. S.H.- Retrofitting work of Academic block roof(recall).
Construction of New Campus of Indian Institute of Information Technology, Kalyani, W.B. On Engineering, Procurement and Construction (EPC) basis. SH: Supplying and fixing of furniture in academic block.
Construction of New Campus of Indian Institute of Information Technology, Kalyani, WB on Engineering, Procurement and Construction (EPC) basis. SH: Supplying, Assembling and fixing in position customized furniture.
Construction of New Campus of Indian Institute of Information Technology, Kalyani West Bengal on Engineering, Procurement and Construction (EPC) basis. S.H. :- Providing and fixing window glasses in Academic block.
Construction of New Campus of Indian Institute of Information Technology, Kalyani West Bengal on Engineering, Procurement and Construction (EPC) basis. S.H.:- Rectification work of Hostel building and pending road work.
ENGINEERING PROCUREMENT AND CONSTRUCTION EPC OF PROVN OF STORAGE SHEDS INCLUDING ANCILLARY BUILDINGS AT MUNAKOT MIL STN PITHORAGARH
Construction of New campus of Indian Institute of Information Technology, Kalyani, WB on Engineering, Procurement and Construction (EPC) basis. SH: SITC work of organic waste converter (fully automatic) at IIIT Kalyani campus.
Strengthening work from Km 104.00 to Km 125.00 and km 132.00 to km139.00 on NH-72 (New NH-07) in the State of Uttarakhand through an Engineering, Procurement and Construction (EPC) Contract.
Construction of Auditorium including Civil adn E&M serivces on Engineering, Procurement and Construction (EPC) basis at Old Horse Line, LBSNAA, Mussoorie.(SH: Pdg.Services of Highly Skilled personal & Unskilled Personal for EE(E)-Mussoorie office.)
Construction of New campus of Indian Institute of Information Technology, Kalyani, W.B. on Engineering, Procurement and Construction (EPC) basis. SH: SITC of balance LAN and Network system, IP CCTV System, IPABX & Audio Video Conference System.
Construction of NEw Campus of Indian Institute of Information Technology, Kalyani, W.B. on Engineering, Procurement and Construction (EPC) basis. SH: Providing, Installation, Testing and commisioning of LAN Networking in computer and Electronics Lab and Wifi operation of the system for 1 year.
E-TENDER FOR CONSTRUCTION OF MILK POWDER PLANT, ICE CREAM PLANT AND BAKERY UNIT IN SITARGANJ, DISTRICT UDHAM SINGH NAGAR, UTTARAKHANDON ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC).
CONSTRUCTION OF AUDITORIUM INCLUDING CIVIL AND MEP SERVICES ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) BASIS AT OLD HORSE LINE, LBSNAA, MUSSOORIE. (SH:- SOIL STABILIZATION/SLOPE PROTECTION WORK, FROM GRID 35 TO 70 INCLUDING SHOTCRETING REINFORCED WITH IRC FABRIC AND DAMGED PATHWAY REPAIR WOR). (2ND CALL). Subwork/Packages: NAILING WORK
Landslide treatment work of 12 location on NH-58 from Km 235.420 (Shivpuri) to km 266.130 (Kodiyata) under EPC mode in the State of Uttarakhand on EPC Mode.
Construction of new campus of Indian Institute of Information Technology, Kalyani, W.B. on Engineering, Procurement and Construction (EPC) basis. SH: Providing, Installing, Testing and Commissioning of Iron Removal Filtration Plant of capacity 30 cum per hour with auto backwash facility, softening plant in for AC Plant Room including Running and Operation of Iron removal and softening plant for six months.
CONSTRUCTION OF UNION BANK OF INDIA BUILDING AT IT PARK, DEHRADUN, UTTRAKHAND ON EPC MODE
STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 18.450 TO KM 18.500 ON RISHIKESH DHARASU ROAD NH94 ON EPC MODE IN THE STATE OF UTTARAKHAND NOS OF LAND SLIDE 01 NOS ON ENGINEERING PROCUREMENT CONSTRUCTION EPC MODE
Strengthening work from Km. 68.70 to Km. 77.00 on NH-309A in the state of Uttrakhand under EPC mode
Construction of 24M at Km-2 of Ujjawalpur to Gwad Dungri Jaspur and 48 M over Meeng Gadera in Km-1 of Gadhani Motor Road and 48 M Km-2 of Gairsain to village Devalkot Motor Road motor bridge and its approach in district Chamoli in EPC mode
Development of Jhajra - Asharori Link Road (Design Ch 0.050 to Ch 12.220) in the State of Uttarakhand on EPC Mode
Construction of Hard shoulders from km. 161.00 to 164.00 on NH-72(07) on EPC mode in the State of Uttarakhand
CS for AE for Development of Jhajra - Asharori Link Road (Design Ch 0.050 to Ch 12.220) in Uttarakhand on EPC Mode.
CS for AE for Constof 4lane Kotdwar Bypass of NH119 in the State of Uttar Pradesh and Uttarakhand on EPC Mode.
Strengthening work from km. 92.00 to km. 106.00 on NH-87 (New NH-109) in the state of Uttrakhand under EPC mode.
Strengthening work from Km. 13.00 to km. 26.00 on NH-121 (New NH-309) in the state of Uttrakhand under EPC mode
Landslide treatment work of 08 location on NH-07 under EPC mode in the State of Uttarakhand under Annual Plan 2024-25
Widening 2-lane to 4-lane from km. 155.100 to 160.700 (ISBT to Ajabpur Railway Crossing on NH-72 on EPC mode
STRENGTHEING WORK FROM KM 99.00 TO 101.00 and KM 166.00 to KM185.00 ON NH 309A IN THE STATE OF UTTRAKHAND UNDER EPC MODE
Strengthening work from km. 128.00 to 158.00 and km. 164.00 to 189.00 on NH-121(309) in the State of Uttarakhand on EPC mode
CONSTRUCTION OF ICCC BUILDING AT JANKI BRIDGE ALONG WITH FACILITY CENTER AT SHIVPURI UNDER ICONIC CITY WORK AT RISHIKESH UTTARAKHAND, INDIA ON EPC MODE
Strengthening work from Km 149.000 to Km171.000 on NH-87 Extn.(New NH-109) in the state of Uttarakhand under NH(O) on EPC mode
SLOPE PROTECTION AT SUBHAIGADHERA NALLA SITE AT EXISTING CHAINAGE KM 20.05 ON JOSHIMATH MALARI ROAD NH 107B THROUGH EPC MODE IN THE STATE OF UTTARAKHAND
STRENGTHEING WORK FROM KM 55.550 TO KM 89.000 (length 33.450 km) ON NH 87 EXT (NEW 109) IN THE STATE OF UTTRAKHAND UNDER EPC MODE
Strengthening from km 0.00 to 13.200 ( Majhola to Khatima) on NH-731k on EPC mode under Annual Plan 2024-25 in The State of Uttarkhand
Strengthening work from km 41.00 to 60.00 on NH-123(new no. 507) in the state of Uttarakhand on EPC mode under Annual Plan 2019-20
Landslide treatment works at km 19.3 and km 19.8 on Joshimath Malari Road in 21 BRTF area under project Shivalik in Uttarakhand state on EPC mode
Construction/ Extension of Dudhadhari Elevated Flyover including approaches on Muzaffarnagar -Haridwar Section from Km.206.220 to Km. 208.870 of NH-58 in Uttarakhand on EPC Mode.
Road Safety Improvement of Critical Junction in Manglaur (km 165.300) on Muzaffarnagar Haridwar Section of NH-334 in the Uttarakhand on EPC Mode under NH(O)
Treatment of landslide zone from location no. 29 to 37 (km 157.890 to km 167.503) on NH-125(09) in the state of Uttarakhand under EPC mode
PERIODIC RENEWAL OF ROAD FROM KM 8.00 TO 52.00 OF NH309A UNDER NH DIVISION LOHAGHAT IN THE STATE OF UTTARAKHAND UNDER ARP 2022-23 under EPC Mode
Treatment of 07 no. of landslide location on NH-134 from Dharasu to Yamnotri in the State of Uttarakhand under Annual Plan 2023-24 on EPC Mode.
Treatment of landslide zone from location no. 01 to 28 (km 62.860 to km 152.750) on NH-125(09) in the state of Uttarakhand under EPC mode
Strengthening work from Chainage 0.000 to Chainage 36.000 on NH- 107(A) Under Annual Plan of NH(O) 2019-20 in the state of Uttarakhand on EPC mode
Treatment of 01 nos. of landslide location at ch. 25.630 to 25.745 on NH-507 under EPC mode in the State of Uttarakhand under Annual Plan 2025-26.
Improvement from Ch. 228.200 (Rishikesh Geetanagar Chowk) to Ch. 235.250 (Shivpuri, Brahmpuri) of NH-07 on EPC mode in the state of Uttarakhand under Annual Plan 2025-26