Consultancy Services for Authority Engineer for supervision of Construction of Champawat Bypass 2 lane with paved shoulder km 121.700 to km 129.450 on NH-09 Old NH-125 in the state of Uttarakhand under Chardham works on EPC mode.
Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the State of Uttarakhand
Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the state of Uttarakhand
Rehabilitation and Upgradation of Single / Intermediate Lane to 2 Lane from Existing Chainage (Km 64.525 to Km 74.700) Design Chainage (Km 43.400 to Km 53.365) on NH -123 (New NH no. 507) under EPC mode in the state Uttarakhand
Landslide treatment work on NH-58 (New 07) at Bachelikhal Ch. 279.400 to 279.600 (200 m length) and Chamdhar Ch.337.940 to 338.165 (225 m length) under EPC mode in the state of Uttarakhand under Annual Plan 2024-25
TREATMENT OF 01 NOS LAND SLIDE ZONE KM 475.360 TOKM 475.625 FROM JOSHIMATH TO MANA ON NH 07 IN THE STATE OF UTTARAKHAND UNDER EPC MODE IN NH ANNUAL PLAN 2024 25 NOS OF LAND SLIDE LOCATIONS 01 NOS Retendering
Consultancy Services for Authority Engineer for Supervision of widening to 2-lane with Hard Shoulder configuration of Mana Ch. 0.00 to Mana Pass Ch. 50.987 road on NH-07 under Bharatmala Pariyojana in the state of Uttarakhand on EPC mode
Road Safety Improvement of existing four lane section of Dehradun-Lal Tappar-Nepali Farm Section of NH7 (Design Chainage 501.930 to 531.330) and Nepali Farm Motichur Section of NH34 (DC 531.330 to 538.750) on EPC Mode in Uttarakhand under NH(O)
Const of Realignment of NH87 New NH109 Sec of Rudrapur Kathgodam Ch.0.000 (Exist Km 54.050 of NH 87 to Ch.7.875 Exis Km61.550 Of NH 87 due to proposed Expansion of Pantnagar Airport L7.875 Km in Uttarakhand in EPC Mode
Strengthening work from Km. 121.700 to Km 129.450 (Champawat Aabadi portion), Km136.320 to km.142.00 (Lohaghat Aabadi Portion) and km.197.150 to km. 202.00 (Pithoragarh Aabadi Portion) on NH-125 (new NH-09) in the state of Uttarakhand under EPC mode
Rehabilitation and upgrading to two lanes with paved shoulders configuration and Strengthening o from Km 175.00 to km 196.00 (Gumakhal to Satpuli) on NH-119 (New 534) in the State of Uttarakhand Under Annual Plan 2021-22 on EPC mode.
CS for AE for Supervision of Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun under BP from Design Chainage 56.500 Vill-Karaunda Mahajan to 119.790 Vill-Latifpur at Saharanpur Bypass in UP on EPC Mode Package-II
Consultancy Services for AE services for 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km113.535) including widening of the existing 4lane-6lane highway from Km112.880-Km115.320 of the Meerut-Haridwar NH-58 on EPC mode in UP
Development of Six lane access-controlled highway from Design Chainage 8.130 near Mohand to 16.380 Daat kali Tunnel of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh and Uttarakhand under BMP on EPC mode (Package-2).
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under Bharatmala Pariyojana from Junction of EPE Design Ch 0.000 to Design Ch 27.000 (Vill.-Lohadda) in the state of UP on EPC Mode (Package-I) 2ND CALL
PR work from km 193 to 233 (41 km) and Provision of THRIE Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 2023-24 on EPC mode
Road Protection work in Hill side and Valley side at km. 171 (ch. 170.750 to 170.930) and at km 172 (Ch. 171.700 to 171.900) on NH-707 in the State of Uttarakhand under Road Safety Plan 2023-24 on EPC Mode
Rehabilitation and up-gradation to 2-lane configuration of Kangarchina to Almora road from km 161.600 to Km 196.670 Existing Chainage 169.00 to Km 206.00 of NH-309A in the State of Uttarakhand Package-V under NH(O) on EPC Mode.
Design and Construction of 150 Bedded (Ground & 6 Floors) Critical Care Hospital Block Building for AIIMS, Rishikesh including all internal & external, Civil, Electrical & Mechanical Services, all external Civil & E&M Development works & Horticulture ... in EPC Mode .
STABILIZATION OF LANDSLIDE AND SLOPE PROTECTION AT KM 474.710 TO KM 474.850 and KM 475.565 TO KM 475.625 ON RISHIKESH JOSHIMATH - MANA ROAD NH-07 ON EPC MODE IN THE STATE OF UTTARAKHAND. (NOS OF LAND SLIDE 02 NOS ON ENGINEERING,
Rehabilitation and up-gradation to 4-lane configuration of Kashipur to Ramnagar road from km 5.735 to km 24.00 of NH-121 (km 64.735 to km 83 New NH-309 18.265 km on EPC Mode in state of Uttarakhand.
Rehabilitation and up gradation of existing road between Km 95.287 to Km 100.300 design chainage Km 81.800 to Km 87.000 single lane to double lane with paved shoulder specification on Gangotri Uttarkashi Dharasu road NH34 on EPC mode in the State of
Rehabilitation and up gradation of existing rd bet Km 95.287 to Km 100.300 design chainage Km 81.800 to Km 87.000 single lane to double lane with paved shoulder specification on Gangotri Uttarkashi Dharasu rd NH 34 on EPC mode in the State
Rehabilitation and Up-gradation from single lane to two lane with paved shoulder from existing Km 195.175 to Km 220.00 (Design Chainage from Km 71.300 to Km 95.947 Paligad to Jankichatti) on NH 134 in the state of Uttarakhand under EPC mode
Routine Maintenance and Incident Management work of from Sitarganj Km 0 000 to Tanakpur Km 52 200 under NHDP IV on EPC Mode of Two Lane with paved shoulders of section of Old NH 125 New NH 09 in the State of Uttarakhand
CS for AE for Supervision of Development of 6 lane access controlled highway of Ganeshpur Dehradun section of NH-72A under BP from Design Chainage 0 (Ganeshpur) to Design Chainage Km 19.785 in up and Uttarakhand on EPC mode under BP (Phase-I)
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under BMP from Design Chainage 0.000 (Aksardham NH-9 (old NH-24)) to Design Chainage 14.750 (Delhi-UP Border) in the state of Delhi (Package-1) on EPC mode
Providing and fixing of THRIE metal beam crash barrier at accident prone areas from Km 16.000 to 55.000 and Improvement widening of junction in Km 52 and Km 54 on NH-334A under Road safety Annual Plan 2022-23 on EPC mode
Construction and Upgradation of road to NHSL specification from Sumna i.e ch km 0.0 to Km 22.050 (Design ch km 0.0 to km 22.050)(Lapthal) of road Sumna-Lapthal-Topidunga(SLT) under Project Shivalik in Uttarakhand State on EPC mode(Length 22.050 Km)
Improvement and Upgradation of NH734 sec of Moradabad Thakurdwara Kashipur including Moradabad and Kashipur bypasses on EPC basis in Uttar Pradesh and Uttarakhand PckgIII Kashipur BypassLength14.490 km. Starts from Ch.38.770 near UP UK Border a
CS for AE for Supervision of Development of 6 lane access control GF highway of Delhi-Saharanpur-Dehradun under BP from Junction of EPE Vill-Mavikalan Design Chainage 0 to 56.500 Vill-Karaunda Mahajan in UP on EPC Mode under BP Phase-I PKG-I
CS for AE for Road Safety Improvement of existing Four Lane Section of Dehradun Lal Tappar Nepali Farm Section of NH-7 (501.930 to 531.330) and Nepali Farm Motichur Section of NH-34 (531.330 to 538.750) on EPC Mode in Uttarakhand under NH (O).
Balance work of Widening to 2 lane with geometric improvement from km 60.00 to km. 64.825 (Actual chainage as per site km. 59.700 to km. 64.525 on NH-507 in the State of Uttarakhand under EPC Mode in NH(O) the year 2023-24
Treatment of landslide zone 02 Location (Ch 100.572 to 100.792 KM on NH-09 and Ch. 170.075 km to 170.150 km and Ch. 170.350km to 170.325) on NH-125 (New NH-09) in the state of Uttarakhand under Annual Plan 2024-25. (under EPC mode
Installation and Implementation of webcasting solution on turn-key basis in Polling Stations During forth coming Assembly General Election, 2022.
Installation and Implementation of webcasting solution on turn-key basis in Polling Stations During forth coming Assembly General Election, 2022.
Installation and Implementation of webcasting solution on turn-key basis in Polling Stations During forth coming Assembly General Election, 2022.
Installation and Implementation of webcasting solution on turn-key basis in Polling Stations During forth coming Assembly General Election, 2022
Installation and Implementation of webcasting solution on turn-key basis in Polling Stations During forth coming Assembly General Election, 2022.
Installation and Implementation of webcasting solution on turn-key basis in Polling Stations During forth coming Assembly General Election, 2022.
Installation and Implementation of webcasting solution on turn-key basis in Polling Stations During forth coming Assembly General Election, 2022.
Installation and Implementation of webcasting solution on turn-key basis in Polling Stations During forth coming Assembly General Election, 2022.
Installation and Implementation of webcasting solution on turn-key basis in Polling Stations During forth coming Assembly General Election, 2022.
Rehabilitation and up-gradation to 4-lane configuration of Kashipur to Ramnagar road from chainage km 5.735 to km 24.00 of NH-121 (km 64.735 to km 83 New NH-309) (18.265 km) on EPC Mode in state of Uttarakhand under NH(O) Annual Plan 2023-24
STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 482.070 TO KM 482.170 KM 493.970 TO KM 494.115 KM 494.450 TO KM 494.600 KM 495.320 TO KM 495.540 KM 486.100 TO KM 486.170 ON RISHIKESH JOSHIMATH MANA ROAD NH07 ON EPC MODE IN THE STATE OF UTTA
Treatment of 04 nos of landslide locations (Ch. 134.315 km to 134.400 km, ch.135.848 km to ch. 135.910 km, ch. 145.390 km to 145.605 km and ch. 168.755 to ch. 168.840 km (Tyuni Mussoorie section) on NH 707A under EPC mode in the State Of Uttarakhand
STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 473.750 TO KM 473.800 KM 476.270 TO KM 476.350 KM 491.400 TO KM 491.750 AND KM 498.120 TO KM 498.700 ON RISHIKESH JOSHIMATH MANA NH58 ON EPC MODE IN THE STATE OF UTTARAKHAND NOS OF LAND SLIDE 04
CS for AE for Cons. of Realignment of NH-87 (New NH109) Sec. of Rudrapur Kathgodam from Design Ch. 0.000 (54.050 of NH 87) to Design Ch. 7.875 (61.550 Of NH 87) Due to Proposed Expansion of Pantnagar Airport (DL 7.875 Km) in Uttarakhand on EPC Mode
Improvement of Riding Quality of NH 707 A From Ch 0.00 to 52.180, Ch 61.750 to 70.750, Ch 72.900 to 79.350 and Km 83.000 to 127.000 in the State of Uttrakhand Under annual plan 2021-2022 N.H.(O) in the state of Uttarakhand ( Under EPC mode)
Landslide Treatment work of 05 Locations CH.298.360-CH.298.750, CH.304.120-CH.304.350, CH.304.870-CH.305.050, CH.312.190-CH.312.230 and CH.333.000-CH.333.100 ON NH-07 (OLD NH-58) under EPC mode in the State of Uttarakhand under Annual Plan 2024-25