Loading…
Loading…
625 results • Best match
Work of Road Safety from Km 65.000 to 111.350 on NH 123 (507) in the state of Uttarakhand under EPC mode under Road Safety Annual Plan 2021-22
Widening to 2L with PS from km 156.900 to Km 175.00 (Dugadda to Gumkhal) of NH-534 (Old NH-119) on EPC mode in the state of Uttarakhand.
IRQP work of Road from Km 0.00 to 45.00 on NH 87 Ext (New NH 109) on EPC mode under Annual plan 2022-23 in the state of Uttarakhand
STRENGTHENING WORK FROM KM 10.000 TO 25.000 AND KM 48.000 TO 77.100 OF NH-309 B UNDER ANNUAL PLAN 2020-2021 ON EPC MODE IN THE STATE OF UTTARAKHAND.
Strengthening of damaged road surface from km 147.00 to 157.00 on NH-94(new no. 134) in the state of Uttarakhand on EPC mode under Annual Plan 2019-20
Construction of 300 m. length pre stressed concrete girder bridge and approaches road on aamkheri ghat in district haridwar in the state of Uttrakhand on EPC Mode under CRF
Road Safety Improvement of existing four lane section of Muzaffarnagar-Haridwar Section of NH-334 on EPC Mode in the state of Uttar Pradesh and Uttarakhand under NH(O)
CONSTRUCTION OF 180 M. SPAN R.C.C BOX CULVERT OVER SHETLA RIVER OF KM.2 ON LAMBARPUR LANGHA ROAD IN DISTT. DEHRADUN IN THE STATE OF UTTARAKHAND on EPC mode
Treatment of 01 nos. of landslide location at Ch. 79.850 to 80.300 (Dabarkot) on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2024-25
Landslide Treatment work of 01 location at Km 116 on NH-109(Old NH-87Ext.)(Chhara Village) under EPC Mode in the State of Uttarakhand under Annual Plan 2024-25
Landslide treatment work (valley side) from 106.345 to 106.4609(Near Swala) on NH-09(old NH 125) under EPC mode in the state of Uttarakhand under Annual Plan 2024-25
Protection work of Yamuna Bridge of Span 437.50 M at km. 13-14 on NH 123(507) Under Annual Plan 2025-26 in the state of Uttarakhand under EPC mode
Supervision Consultancy (SC) Services for DLP/ OM stage of 2 projects (Item Rate basis projects) for construction supervision OM of 1 project (EPC mode project) in the State of Uttarakhand
Strengthening work from Km 37.00 to 40.450 including Junction Improvements of NH-72A ( New No. 307) in the State of Uttarakhand under NH (0) Annual Plan 2021-22 EPC mode
Construction of 65 Meter Span Steel Truss Girder Bridge at Km 1 of NH-707A under Annual plan 2021-22 N.H.(O) in the state of Uttarakhand (Under EPC mode)
Filling Clarifier gap with material and labour on turn key basis
Rehabilitation and upgradation of Askot Lipulekh on EPC basis for Phase-I existing Km 72.000 to Km 107.620 Design Chainage Km 21.330 to Km 56.935 under Project Hirak of BRO in the State of Uttarakhand
IRQP work from Km. 28.00 Ramnagar to 63.00 Marchula on NH-121(New 309) in the state of Uttarakhand under NH division haldwani for the year 2021-22 under EPC Mode
Construction upgradation of road Km 504 pt 871 to Km 509 pt 725 Lambagarh to Benakuli incl Benakuli land slide on road Joshimath mana under EPC mode NH 07 in Uttrakhand
O and M and other Road Safety Works on Muzaffarnagar Haridwar Sec of NH334 from Km 130.500 to Km 206.220 in the State of Uttar Pradesh and Uttarakhand on EPC Mode
Design Construction Testing Commissioning and Operation and Maintenance of Infrastructure Works at Integrated Manufacturing Cluster Khurpia Uttarakhand under Amritsar Kolkata Industrial Corridor on EPC Basis
Widening of 2-lane to 4 - lane in ch. 155.100 toch. 160.700 from i.s.b.t to railway crossing of nh -72 (new no-7) in distt - dehradun in state of uttrakhand epc mode
Treatment of 01 nos of landslide location at Km 41.165 to Km 41.300 of NH34 old chainage of NH-4 on Gangotri Rishikesh section under EPC mode in the State of Uttarakhand
Treatement of 04 no. of landslide zone from Dharasu to Yamnotri on NH-134(old NH-94) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2022-23
Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 (New NH-107) in the state of Uttarakhand Under EPC mode in the state of Uttarakhand
Design and Construction of slope protection work of 200 mtr between Km 2.600 and Km 2.800 on Tawaghat-Sobla Road under 67 RCC/765 BRTF/CE (P) Hirak on EPC Mode in Uttarakhand State
Const of 4laning of Kotdwar Bypass of NH119 (Design Ch. 0.000 to Design Ch. 5.950) connecting Najibabad Kotdwar to Kotdwar Pauri Road in the State of Uttar Pradesh and Uttarakhand on EPC mode
Strengthening work from km 10.000 to 25.000 and km 48.000 to 77.100 of NH 309B (Almora-Panar-Ghat) Under Annual Plan 2020-21 in the State of Uttarkhand under EPC Mode (Balance work)
LAYING OF ADDITIONAL LT AB CABLE ON TURN KEY BASIS UNDER EDD PITHORAGARH
Rehab and upgradation of existing road bet Km 29.725 to Km 60.550 Suraithota to Malari NHSL to Double lane specification of Joshimath Malari (NH-107B) road on epc mode in the state of Uttarakhand
Stablisation of land slide and slope protection at km 474.710 to Km 474.850 and Km 475.565 to km 474.625 on Rishikesh Joshimath Mana road NH-07 on EPC Mode in the State of Uttrakhand
Landslide treatment work on NH 58 from Kodiyala (Km. 266.130) to Devprayag (Km. 296.925) at 10 locations under EPC mode.(As per DPR submitted by THDC) under Annual Plan2022-23in the State of Uttarakhand
Layout, Design, Drawing and Const. of Adm Block, OTM Accn, Married accn, MI Room, Dental Clinic, and External Services etc for HQ CE (P) Shivalik at Majrigrant, Distt Dehradun in Uttarakhand State on EPC Mode.
Construction of Two laning with Paved Shoulder of Khatima bypass of Sitarganj-Tanakpur section on NH-125 from Km. 24.720 to Km. 32.975 in the State of Uttarakhand under NHDP Phase-IV on EPC mode
Construction work of a 150-meter span RCC bridge over the Baigul River to connect Nirmal Nagar and Rajnagar villages of Sitarganj Legislative Assembly constituency with Sisauna village under the State Scheme. under EPC mode
Development of Six lane access controlled highway of Daat kali Tunnel Dehradun of Ganeshpur Dehradun section of NH72A from km 16.380 to km 19.785 Design Chainage in Uttarakhand under Bharatmala Pariyojana on EPC mode Package3
DESIGN AND CONSTRUCTION OF 690 MTR. LONG BRIDGE OVER CHALTHI RIVER BETWEEN KM. 29.875 TO 30.565 OF TWO LANE TANAKPUR-JAULJIBI MOTOR ROAD ALONG INDO-NEPAL BORDER IN CHAMPAWAT DISTRICT OF UTTRAKHAND STATE ON EPC MODE
Strengthening work from km. 125.00 to km. 132.00 and reconstruction of damaged drain and Protection work from km. 104.00 to km. 139.00 on NH-72 (New NH-07) in the State of Uttarakhand under EPC mode
Design and constructiohn of 690m Long 2 lane motor bridge over Chalti river from Chainage 29.875 to 30.565 of Tanakpur Jauljibi motor road along Indo Nepal Border in Champawat District of Uttarakhand state in EPC mode
Development of Pantnagar Airport on EPC Mode.
Strengthening work from km. 28.00 to km. 34.00 and km 44.00 to km 58.00 and Protection work from km.23.00 to km. 78.00 on NH-119 (New NH-534) in the State of Uttarakhand under EPC mode
Development of of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under BP from Design Chainage 56.500 (Vill-Karaunda Mahajan) to Design Chainage 82.000 (Vill-Khyawari) in UP on EPC Mode (PKG-III).
Routine Maintenance and Incident Management work of from Km. 0.000 to Km. 52.200 on EPC Mode of Two Lane with paved shoulders of section of NH125 excluding Khatima Bypass of length 8.255km in the State of Uttarakhand
Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill-Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in UP on EPC Mode (PKG-II)
Strengthening work from km 25 to km 32 and Construction of Damaged Retaining wall, Breast Walls in km 25 to km 40 on NH-123(New NH-507) on EPC mode under Annual Plan 2022-23 in the State of Uttarakhand
Treatment of Land Slide and Sinking Zone from Chainage 55.400 to 55.580 km. near kwarab Bridge, NH-109 Jyolikot Khairna Almora Karnaprayag Road Under EPC Mode (as per DPR submitted by THDC Uttarakhand in Annual Plan 2024-25
DESIGN AND CONSTRUCTION OF 65 MTR SPAN MAJOR PMT BRIDGE WITH STEEL SUPERSTRUCTURE THROUGH TYPE OPEN FOUNDATION AT KM 2.10 ON TIDANG-BIDANG ROAD UNDER 67 RCC/765 BRTF/CE (P) HIRAK IN UTTARAKHAND STATE ON EPC MODE
Development of six- lane access-controlled highway from design chainage 0.000 (Ganespur) to design chainage 8.130 (near Mohand) of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh under Bharatmala pariyojana (Package1) on EPC mode
Consultancy Services for Authority Engineer for Road Safety Improvement of Critical Junctions and Overlay on Muzaffarnagar Haridwar Section of NH-334 from Km 130.360 to Km 208.600 in the State of Uttar Pradesh and Uttarakhand on EPC Mode
Development of 6 lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under BMP from Design Chainage 82.000 Vill-Khyawari to Design Chainage 119.068 (Vill-Latifpur at Saharanpur Bypass) in UP on EPC Mode (Package-IV)