Loading…
Loading…
20 live7 closing this weekmost from Ministry of Road Transport and Highways and PWD
20 results • Best match
Treatment of 11 No. of landslide location on (Kotdwar to Dugadda) of NH-534(old NH-119) in the State of Uttarakhand under Annual Plan 2025-26
Landslide treatment work from Ch. 269.900 km to Ch. 270.214 km (Crown portion at Totaghati) on NH-07 (old NH-58) in the State of Uttarakhand under Annual Plan 2025-26 - under EPC mode
Treatment of 30 nos of landslide locations from km 64.380 to km 186.085 on NH-09 (Old NH-125) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2026-27
Renewal work by microsurfacing of four-lane road ODR-35 from National Highway Number 58 (Old) to Industrial Area in B.H.E.L. Ranipur Constituency of district Haridwar under Kumbh Mela Infrastructure Development
Treatment of 16 no of landslide location on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2025-26
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (Badwala to Lakhwar Bend) (realignment from km 12.00 to 31.122) on NH-507
Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge (Approximate Span 400m) along with its approaches connecting NH-507 with NH-707A near Lakhwad Bend in the State of Uttarakhand
Renewal by B.C. from km 1 to 6.80 of other District road from Military Chowk located on National Highway 58 to Village Saliyar (Old N.H.-73) in Roorkee Constituency of Haridwar district under Kumbh Mela Infrastructure Development 2027.
Widening and Strengthening of Single and Intermediate lane to 2 Lane with paved shoulder from existing Chainage (Km 53.873 to Km 59.700) Design Chainage (Km 33.565 to Km 38.943) (Design length 5.378 km) on NH-507 in the State of Uttarakhand
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 235.00 Jyolikot to Karanprayag of NH-109 (Old NH 87Ext) in the State of Uttarakhand.(Length- 235 km).
Strengthening work of Old NH-125 to Lohiya Head Motor Road via Sukhapul in Khatima Assembly Constituency of Udham Singh Nagar District under the State Plan.
Reconstruction of Damaged road surface due to the laying of an underground sewer pipe line by the Uttrakhand Urban State Develepment Authority (UUSDA) on NH 87 New 109 from km 116.00 to 121.00
Consultancy Services for Preparation of Detailed Project Report DPR for Rehabilitation of Tambakhani Tunnel of Length 358.50 m at Km 97.327 on NH-34 (Rishikesh-Dharasu-Uttarkashi Road) in the State of Uttarakhand.
Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (Bataghat to Maletha) on NH-707A in the State of Uttarakhand. (Length 136 km).
widening of existing Single / Intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (Tyuni to Bataghat) of NH-707Ain the State of Uttarakhand. (Length-175 km).
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 80.00 Ghat to Udiyari Bend of NH-309A in the State of Uttarakhand. (Length 80 km).
Widening to 2 Lane paved shoulder from Existing Chainage 12.000 to Km 40.500 Badhwala to Lakhwar Bend Realignment from km. 12.00 to 31.122 on NH-507 Length-25.660 Km in the State of Uttarakhand on EPC Mode.
TREATMENT OF 04 NOS. OF LANDSLIDE LOCATION AT KM. 100.125 - 100.570 BARETHI OPEN TUNNEL KM. 102.960 KM. 103.100 POKHU DEVTA/MATLI, KM. 109.885 KM. 110.037 JASKOT VILLAGE and KM 127.560 KM 127.760 GOJMER VILLAGE ON NH-34 ON GANGOTRI RISHIKESH S
Dimensional Consignments (HT-03) of 12-axle configuration carrying approx 100 Tonne Wire Ropes on bridge approaches and curves for the Kedarnath and Hemkund Sahib Ropeway Projects on Rudraprayag-Sonprayag (NH-107) and Rishikesh-Govindghat (NH-07
Construction of drain and platform from the previously constructed drain below NH to Thap Naula in frontofDiksha Hardware in Ward No. 2 Talli Madli