Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹40.4 L
EMD Value
₹81,000
Closing Date
4 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer (Civil-I), Lakhwar MPP
Lakhwar Multipurpose Project,Dakpathar (Distt-Dehradun) Ph-9456590095
Fencing along the NH road above Right Bank Shaft-1 at Lakhwar Project
2026_UJVN_102346_1
06/EE(Civil-I)/LMP/2026-27
Open Tender
Civil Works - Others
Item Rate
90 days
Juddo
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
GM (Civil), Lakhwar Project, UJVN Ltd.
₹81,000
12 Nov 2026
12 Nov 2026
8 Dec 2026
12 Nov 2026
4 Dec 2026
14 Nov 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for retaining,breast walls etc, in all types of soil sand rocks including all lead, lift and disposal of surplus material as per direction of engineer-in-charge,as per drawing and technical specifications Clause 305.1 of MORD Specifiction. PWD SOR Misc. 1.2 | 28.81 | Cu.M | 423.5 | ₹12,201.04 |
| 2 | Excavation in ordinary Rock by manual means Excavation in ordinary rock using manual means including loading in a truck
and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3.5 PWD SOR Mord 3.8.1 | 10 | Cu.M | 308.8 | ₹3,088 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (including equivalent design mix). DSR 15.2.1 | 4.5 | Cu.M | 2,007.2 | ₹9,032.4 |
| 4 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) PWD SOR Morth 12.04 | 8.96 | Cu.M | 6,127 | ₹54,897.92 |
| 5 | Providing concrete for plain/ reinforced concrete in open foundations completeas per drawings and technical specifications Clause 802, 803, 1202 & 1203. P.C.C grade M 15
Nominal mix (1:2.5:5). PWD SOR Mord 11-4-2-1 | 1 | Cu.M | 6,491.5 | ₹6,491.5 |
| 6 | Providing concrete for plain/ reinforced concrete in open foundations completeas per drawings and technical specifications Clause 802, 803, 1202 & 1203. P.C.C. grade M 20
Nominal mix (1:2:4) PWD SOR Mord 11-4-3-1 | 57.45 | Cu.M | 7,243.4 | ₹4,16,133.33 |
| 7 | Providing structural steel for super-structure complete as per drawing and technical specifications. PWD SOR Morth 14.26 | 16,829.25 | kg | 182.04 | ₹30,63,596.67 |
| 8 | Providing and fixing G.I. chainlink fabric fencing of required width in mesh size 50x50mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm. | 300 | Sqm | 839.3 | ₹2,51,790 |
| 9 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one endpost and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earthwork and concrete work to be paid for separately).Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire DSR 16.18.1 | 360 | RM | 18.2 | ₹6,552 |
| 10 | Engaging and operation of one no. Hydraulic (0.9/1.0 cum)mwith one operator/driver and one helper including cost of the fuel, lubricants and repair maintenance etc. forremoval of slip / landslide / excavation earth etc. in dry and wet condition complete in all respect as per direction of Engineer-in-charge. Payment for engaging excavator cum loader shall be madeonly for actual working hours at site, no idle charges shall be paid. Ifmachine is trapped in slip/earth etc., contractor shall make its own
arrangement to haul the machine, for which no extra payment shall be
made to contractor, and machine shall be considered in idle condition.
Cost of mobilization & demobilization from site shall be borne by
contractor. (NSI) | 8 | Hour | 1,541.44 | ₹12,331.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_120515.xls
BOQ • 0.29 MB
tenderdocument.pdf
Tender Documents • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .