Loading…
Loading…
3 livemost from Dte General Border Roads Organisation and National Highways and Infrastructure Development Corporation
3 results • Best match
Consultancy services for feasibility study, preparation of (DPR), and providing of pre-construction activity for construction of highway tunnel in EPC mode for a tentative tunnel length of 5.00 km road along NH-310A in the State of Sikkim
Widening and development of existing carriageway into 2Lane with paved shoulder configuration along with construction of tunnels, viaducts and treatment of vulnerable sliding/sinking zones along NH10 from Km 53.50 Rangpo to Km 79.371 Ranipool
Construction / Improvement of existing CL-9 road to NHDL specification with paved shoulder from design chainage km 0.00 (Zadong) to km 6.880 (net length 6.880 km) on road Zadong-Donkyala-Kerang (NH 310 A) in the State of Sikkim under Project Swastik