Loading…
Loading…
28 live15 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
28 results • Best match
IE Services for 4Laning of Jagtial-Karimnagar Section of NH-563 from Jagtial Bypass Start at Design Ch.0.000 (Ex.chainage 90-500 on NH-63) to Design Ch.58.866 km (Ch.170.400 km) at Karimnagar Bypass End (58.866 km) to be executed on BOT mode NH O
Services for Supply, Operation and Maintenance of Mobile Quality Control Van (MQCV) for Non-Destructive Testing of National Highway Works in the State of Telangana (2nd Call)
Independent Engineer Services for 4-lane Highway of Armoor-Jagtial-Mancherial Section of NH-63 from Armoor (design km.29.100) to Jagtial (design km.92.700) (total length 63.600 km) under NH(O) on Hybrid Annuity Mode in the state of Telangana
Independent Engineer Services for 4-lane Highway of Armoor-Jagtial-Mancherial Section of NH-63 from Jagtial (design km.92.700) to Mancherial (design km.160.995) (total length 68.295 km) under NH(O)on Hybrid Annuity Mode in the state of Telangana
CS for Preparation of DPR for Six Laning of Hyderabad Yadgiri Section Length 35.65 km of NH-163 in the State of Telangana
Consultancy Services for Preparation of Detailed Project Report for 4 lane Access Controlled Development of existing 4-Lane from Solapur to Sangareddy Section of NH-65 (Length 246Km).
Six-laning of Hyderabad-Vijayawada Section of NH-65 Section Ch.39.85 to Ch.221.15 (181.30 Km) (Pkg-1) in the States of Telangana and Andhra Pradesh under BOT Mode
Const. of 4L from Kadur Km 256.530 to Hasnapur Potulamadugu Km 267.360 Mahabubnagar Bypass of Hyderabad Panaji sec of NH167 L 10.830km under NH O in the state of Telangana on EPC Mode.
AE services for Development of Access Controlled Highway of 4 lane from Kadur (Km 256.160) to Hasnapur/Potulamadugu (Km 267.360) (Mahabubnagar Bypass) of Hyderabad Panaji section of NH167 (length 11.200km) under NH(O) in Telangana on EPC mode.
Devel. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Girmapur Vill Ch1.518 to Pragnapur Ch.82.000 for a Design Length of 83.518 Km in Telangana under NH O on Hybrid Annuity Mode PKG I
Develop. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Pragnapur Vill Design Ch82.000 to Tangad Palle Vill Design Ch160.000 for a Design L of 78.000 Km in the State of Telangana under NH(O) on HAM PKGII
4L of Jagtial Karimnagar Section of NH 563 from Jagtial Bypass Start at Design Ch.0.000 Existing chainage 90.500 on NH63 to Design Ch.58.866 km near SH-1 Ch. 170.400 km at Karimnagar Bypass End DL 58.866 km in the state of Telangana on DBFOT mode
Engagement of User Fee agency through ETender at Konetipuram Fee Plaza in the State of Telangana and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Rehabilitation and Upgradation of Nehru Nagar to Kothagudem Section to Two Lane Four Lane with Paved Shoulders from Km 178.500 to Km 230.580 of NH 930P in the State of Telangana on EPC Basis
Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH -167K (Design Chainage km 87.360 to km 88.437) in the States of Telangana and Andhra Pradesh on Engineering, Procurement and Construction (EPC) Basis
Rehabilitation and Upgradation to 2 4 lane with paved shoulders from Km 79.300 to Km 87.360 and Km 88.437 to Km 93.819 of NH 167K Bridge Approaches of Iconic Bridge across river Krishna in the State of Telangana and Andhra Pradesh on EPC Basis.
CC Road and Drain from Asam Subbaiah house to NH-63 in Dharmapuri Municipality.
CC R/F NH-63 to Vadlonikunta in Dharmapuri Municipality(Reserved for ST individuals/societies).
Construction of 6-lane VUP (1X20mX4.5m) at Km.202.860 (Panchalingala) under long-term rectification of MoRTH identified Blackspot (AP-02-085 / AP-04-183) along with Slip Road for Sunikesula Underpass (RHS) with MNB across KC canal on HYD-BLR section.
Rehabilitation Works for ROB cum Flyover at Km. 113.920, Major Bridge at Km.118.390, and associated missing Structural Items on T-J Sec from Km. 72.6 to Km. 121 and M-M Sec from Km. 154 to 187 of NH365 in the state of Telangana 2nd Call.
CC Road and Drain from Gunishetti Ravi (H) to NH-63 via Pothu Venkatesh House in Dharmapuri Municipality.
Laying of BT Roads from NH-65 darga to Allipur village Ward No.33 of Zaheerabad Municipality Sangareddy District.Under( Nagarabhivrudhi Fund)4th call
Improvements to Nirmal - Kankapur road from Km 6/800 to 7/400 (NH-44 to Medipally Village) by providing Central Lighting in Nirmal District
Godavari Pushkaralu-2027-R/F NH 63 petrol Pump to Durga Colony via Ayyappa temple and Kamalapur road including Drain in Dharmapuri Muncipality of Jagitial District Est.Cost.Rs.400.00 Lakhs
Construction of Radial Road 2 from Hyderabad Outer Ring Road at Kothwalguda (Budwel) to NH 167N near Nacharam Package 1 Budwel to Shabad (Km 0+00 to 29+50 Km)
Single Lip Oil Seals for Jumbo Size: 51.5mm x 76.5mm x 16mm as per Annexure A, Single Lip Oil Seals for NH 26 Lathe Machine Size: 26mm x 38mm x 6mm as per Annexure A
Design, Engineering and Construction of Entrance Arch Structure on NH 65 Link Road to Zaheerabad Industrial Smart City consisting of All Structural, Architectural, Electrical Finishing Works, ICT Systems along with Integration, Testing, Commissioning, Safety Compliance And Handover At Nimz, Zaheerabad.
Design, Engineering and Construction of Entrance Arch Structure on NH 65 Link Road To Zaheerabad Industrial Smart City consisting of All Structural, Architectural, Electrical Finishing Works, ICT Systems along with Integration, Testing, Commissioning, Safety Compliance And Handover At Nimz, Zaheerabad.