Loading…
Loading…
96 live47 closing this weekmost from South Central Railway and TELANGANA POWER GENERATION CORPORATION LIMITED
96 results • Best match
W90313126348: BUTTERFLY VALVE AS PER DOC. NO. 413137V4500 SPEC. NO: ST47031, ST47025 & ITS ADDENDUM, W90313126356: BUTTERFLY VALVE AS PER DOC. NO. 413137V3500. SPEC. NO: ST47031, ST47025 & ITS ADDENDUM., W90313126259: BUTTERFLY VALVE AS PER DOC. NO. 413137U7500, ST47031 AND ST47025 & ITS ADDENDUM
W90418113033 MOTORIZED TEMPERATURE CONTROL VALVE FOR COLD GAS, W90418113041 MOTORIZED TEMPERATURE CONTROL VALVE FOR PRIMARY WATER, W90418113025 ACTUATOR FOR COLD GAS TEMP CONTROL VALVE, W90415208017 ACTUATOR FOR PRIMARY WATER TEMP CONTROL VALVE
Proportional Directional Control Valve: DPZO-AEB-NP-173- L5/D10, Proportional Directional Control Valve: Model: DKZOR-AEB-NP-173-L5 10
Proportional Direction Control Valve Model: KBDG4V-3-2C24S- M1-PE7-H7-11, Proportional Directional Control Valve: Model: KBDG5V-5-33C80N- H-M1-PE7-H1-10, Proportional Directional Control Valve: Model: KBDG5V-7-33C170N-X-H- M1-PE7-H1-11
TGGENCO-KTPS VII Stage/Paloncha - Supply of Smart Positioner for HWL and MEFCV Hydraulic Control Valves
Gear box for operating gate valve as per enclosed Technical specification
Procurement of M/S KSB MIL make Control valve actuators for NTPCTelangana
Procurement of STAINLESS STEEL BALL VALVE 20 MM and 25MM ID VINYLCORRG FLEX HOSE for use at CHP, RGOC3.
Procurement of BRASS BALL VALVES and STAINLESS STEEL BALL VALVES for Bhupalpalli Area - Reg.
Compressor check valve 1-1/4 " for E70 brake system as per FTRTIPL Part No.002007600.
Supply of Pneumatic Knife Gate Valve Pistons for XRP 1043 Bowl Mill Reject System
REPAIR/ RENEWAL OF WATER SUPPLY DISTRIBUTION SYSTEM, REPLACEMENT OF CONTROL VALVE, VALVE CHAMBERS AND OTHER MISCELLANEOUS WORKS AT DGQA COMPLEX UNDER GE(U) SECUNDERABAD
Procurement of BRASS BALL VALVE 20MM, 50MM, MS GI NIPPLE-PIPE 20MM, and MS GI SOCKET-PIPE 20MM for use at Pump section, OCP-3, RG2
300NB pneumatic operated knife gate valves in Ash Handling system, KTPS-VI stage
Material Fabrication and Supply of Inconel X 750 shafts for 2 inches Fisher V 100 control valve as per Drawing no HWPM IP 66, Material Fabrication and Supply of Inconel X 750 shafts for 3 inches Fisher V 100 control valve as per Drawing no HWPM IP ... 100 control valve as ... Butterfly control valve as ... 100 control valve as ... Butterfly control valve as ... Butterfly control valve as ... Sereg Valve shaft ... Sereg Valve shaft ... Sereg Valve shafts ...
Custom Bid for Services - Repair and Calibration of servo control valve Hydrawedge MCU of Gleeble test system Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Three piece design 1/2" Ball Valve, Screwed end, double female with lateral dismantling make /model required. 1) M/s L&T Cat.No.L3RBTC 2) M/s LEGRIS Part No.48321521
B7J1Z70708 Solenoid Valves
PNEUMATICALLY ACTUATED BALL VALVES
PROCUREMENT OF HYDRAULIC VALVES AND HYDRAULIC
PROCUREMENT OF WATER HOSES SOLENOID VALVES QR
W90311928897: HPT STEAM EVACUATION VALVE, W99318102089: SOLENOID VALVE OF HP RELIEF VALVE
Combustion/reduction tube quartz, WO3 Granulate for filling combustion tube, Ball for ball valve 10mm blind hole, EAS WETSORBER
R6C1Z30863 SOLENOID VALVE
R6C2Z31870 REGULATING VALVE
B9AZS00172 IP VALVE CASINGS
B9AZS00171 HP VALVE CASINGS
Spray nozzles,nipples and ball air valves for DS system
MFT_SUR_(PH NO.:101561) Non rebreather Mask Adult; should be Latex free odourless transparent mask and tubing Adjustable elastic band Mask designed to fit the face contours Mask adult and paediatric sizes Provision of low resistance check valve on ... A valve and ...
SUPPLY OF VARIOUS VALVES FOR TM DIVISION IN 500 MW UNIT
REPAIR, MAINTENANCE AND RECTIFICATION OF VALVES, VALVE PIT CHAMBERS, COVERS AND HEADER SYSTEMS WITH CONNECTED PIPELINES, FITTINGS, JOINTS, SUPPORTS AND ALL ALLIED PLUMBING AND CIVIL WORKS COMPLETE AT ZONE II B AND C UNDER AGE EM II OF GE(U) SECBAD
REPAIR, MAINTENANCE AND RECTIFICATION OF VALVES, VALVE PIT CHAMBERS, COVERS AND HEADER SYSTEMS WITH CONNECTED PIPELINES, FITTINGS, JOINTS, SUPPORTS AND ALL ALLIED PLUMBING AND CIVIL WORKS COMPLETE AT ZONE II A, D UNDER AGE EM II OF GE(U) SECUNDERABA