Loading…
Loading…
317 results • Latest
Supply of Cordless Grass Trimmer UR016G and DEMOLITION HAMMER BREAKER, GSH 16-30 required at BTPS
Supply of Refrigerant Lubricant Oil RL - 170 required for Unit CCR chiller of CAM/Stage-II/BTPS
TGGENCO YTPS 5X800MW CHP Carrying out the physical inspection of conveyors and chutes to give clearance for running and continuous monitoring of BCN 25, BCN26, BCN7,BCN8AB,BCN9AB,BCN10AB,BCN11AB,BCN12AB,BCN13AB,BCN14AB,BCN15AB in CHP and to carryout any other works as instructed by Engineer incharge for providing uninterrupted coal feeding to Unit Bunkers from 25 02 2026 or actual date of commencement to 31 03 2026.
TGGENCO YTPS CHP Carrying out the physical inspection of conveyors and chutes to give clearance for running and continuous monitoring of BCN 21AB, BCN22AB, BCN23AB, RBCN 2AB, TPC2AB, VGF 5,6,7,8, BF 5,6,7,8, Crusher 5,6,7,8, BCN24AB, BCN27AB in CHP and to carryout any other works as instructed by Engineer incharge for providing uninterrupted coal feeding to Unit Bunkers from 25 02 2026 or actual date of commencement to 31 03 2026
TGGENCO YTPS CHP Clearing of accumulated coal on the rails, poking of solid caked coal and hammering of boulders and clearing of shales on the Track Hopper 1 and 2 grid wagon tippler 1,2,3 and 4 grid TTR grids, clearing of sticky wet coal by Poking inside coal wagons, Opening of BOBRN wagon doors for unloading of coal, engaging cutter welder for opening closing of welded wagon doors whenever required and clearing of Apron feeder and dribble conveyor jams, along with tools and tackles for unloading and any other coal clearing works as instructed by engineer-incharge from 02 03 2025 or actual date of commencement to 31 03 2026
Supply of Seal air fan motor