Loading…
Loading…
1,857 results • Recent activity
Engaging of 1 No. Shovel 75 HP for clearing of grid jams at track hopper-2 for facilitating further unloading of coal rakes on round the clock basis for arranging uninterrupted coal feeding to the Units of YTPS for a period of 1 month from actual date of utilization
TGGENCO-YTPS(5X800MW)-BOP-Stage-I-Unit-2- Clearing of choked up ash hoppers through poking by opening the poke dummy, diffuser dummy, clearing hopper mouth and removal of any foreign material found and emptying the hoppers completely in CAM-2/Unit-2/Stage- I/YTPS for the period of three months from 01.06.2026 or actual date of commencement of work for FY-2026-27 or finalization of AMC at head quarters which ever is earlier
TGGENCO-YTPS(5X800MW)-BOP-I-Unit-I- Clearing of choked up ash hoppers through poking by opening the poke dummy, diffuser dummy, clearing hopper mouth and removal of any foreign material found and emptying the hoppers completely in CAM-I/Unit-I/Stage-I/YTPS for the period of three months from 01.06.2026 or actual date of commencement of work for FY-2026-27 or finalization of AMC at head quarters which ever is earlier
TGGENCO-KTPP-Civil-RWPL TCCM- Removal of silt, slush and sand accumulated in the underwater pump chambers, sluice gate chambers, Forebay portion Inlet channel of intake pump house at Metpally near Kaleshwaram during pre monsoon for the year of 2026-27.
Up-Keeping at various locations such as Boiler and Turbine areas such as all LIEs, JBs, transmitters, RTDs, Thermocouples, positioners, switches, pneumatic control AND block valves, MOVs, burner tilts and Feeder floor area local control panels and LIEs, Cold air dampers and Hot air dampers, all HEEI Igniters system HFO AND LFO nozzle valves, SH and RH spray station, Mill rejects area and Zero Meters, LP Heaters Floor, HP Heaters Floor, Turbine Floor, CW Pump House area, Battery room, Deaerator Floor instruments and any other area in the scope of Boiler and Turbine Sub division as directed by Engineer-in-charge during the year 2026-27
Regular, preventive periodical maintenance for VGFs 5, 6, 7 and 8 Coal handling plant, YTPS from 10.05.2026 or actual date of commencement of work up to 31.08.2026 as and when required