Loading…
Loading…
841 results • Latest
Supply of Consumables required for HP make E78528 Colour DPCs and HP make M42625dn Mono DPCs available at YTPS
TGGENCO-CETD-Div-I-Supply of Sports Items for CETD/TGGENCO
BTPS - CHP - Periodical and breakdown maintenance of vibro feeders, counter weights, sump pumps and other miscellaneous equipments for the conveyors BCN-10, 4A/B, 5A/B, 6A/B, 7A/B, TP-3, trippers TP-5, TP-4 and ERH as and when required MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS-CHP-Regular maintenance and minor repair works of all mechanical equipment of stacker cum reclaimers-1 and 2 and preventive and breakdown maintenance of belt conveyors and conveyor equipment for BCN-8, BCN-9, Boom conveyors intermediate conveyors and tipper conveyors as and when required in MM-IV sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of utilization of work to 31.03.2027
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at tail end, head end, along the BCN-4A/B, 5A/B, BCN-10, TP-3, TP-4, 6A/B tail end and ERH area by head loads on to running conveyor in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of utilization to 31.07.2026
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at BCN-3AB tunnel, FG-5 and 6 floor at TP-2, ground portal, gallery and head end areas and contingency-1 and 2 area of 3AB including FG floors and reclaim belt conveyors and reclaim chain feeders by head loads on to running conveyor required in MM-I sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.07.2026.
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at tail end, head end, along the BCN-7A/B, 6A/B head end, 6A/B gallery, bunkers floor and TP-5 area by head loads on to running conveyor required in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.07.2026.
TGGENCO BTPS STAGE-II Chemical Division-II - Analysis charges of Coal, and Ash Samples for the year 2026-27 for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027
TGGENCO BTPS STAGE II CAM Division-Preventive periodical maintenance and servicing of Precision air conditioners present in ESP Control room, Packaged air conditioners present in Administration Building and 220V DC battery chargers of stage-II and split ACs for the year 2026-27
BTPS - CHP - Periodical and breakdown maintenance for apron feeders chain required in MM-I sub division of MM/CHP/BTPS from 01.04.2026 or the actual date of commencement of work to 31.03.2027