Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
676 results • Latest
BM-Divn:Charges for erection of handling structure for LH side CAG cold air gate of primary air and HAG hot air gate of primary air in boiler maintenance division of KTPS VII Stage during the Financial year 2026 27
BTPS - CHP - Checking of all chutes and flap gates from BCN-1A/1B conveyor to bunker floor as and when required in Operation and Electrical division of CHP/BTPS for a period of 03 months i.e. from 01.10.2026 or from actual date of commencement of work.
Charges for rectification of expansion bellow and seal plate at Extended backpass area at rear arch area of Boiler in KTPS VII stage during short shutdown 2026 27
Charges for repair of diesel driven Tractor Reg No AP20U 9395 for the Financial year 2026-2027
KTPS VII Stage CAM Dismantling of 300NB MSERW Ash slurry disposal pipe line 2 of KTPS VII Stage at Northern Ash Pond I in the year 2026 27
CAM-Divn Replacement of 200NB Ms pipes in vacuum lines of ESP B and C passes in fly ash system as and when required during the FY 2026 27
TM Divn Erection of new 500NB integrally rubber lined butterfly valves in series with the existing isolation valves for PHE inlet and out let of DMCW lines during in any unit short shut down during the year 2026 27
TGGENCO - NSHES - Supply of Ceiling Fans, Cables, A-Type Ladder and Certain Consumables at NSHES, Nagarjunasagar.
EP Divn: perform Acheive Trade PAT Estimate for conducting PAT mandatory Energy audit for KTPS VII Stage (Unit 12 1X800MW by empanelled accredited energy auditor firm recognized by BEE
CAM Divn: Overhauling of cooling tower-II of main chiller (AC Plant) as and when required during the FY 2026-27
TM:Divn:Certain online steam leak arresting works to be carried out as preventive maintenance during the year 2026 27
CAM-Divn:Certain modification and strengthening works of vent filter tube sheet at filter bag chamber of SILO1 in fly ash system during as and when required during the FY 2026 27
BM-Divn:Charges for insulation and refractory works on main boiler,boiler auxiliaries and HP valves of boiler in KTPS VII Stage as and when required during the year 2026 27
BM-Divn:Charges for Stress relieving and radiographic testing of HP welded joints during the ESD works for the year 2026 27
BM-Divn:Annual Contract for oil sample analysis of lube oils used in Fans APH and Mills for the year 2026 27
CAm-Divn:Repairs Servicing and Overhauling of Ms Bitzer make model CSH6563 60Y 40P Compressor and installation erection and commissioning works of TAC air dryer in TAC discharge air line of fly ash system in KTPS VII Stage
BM-Divn:Charges for arresting the steam leak from various HP valves on Boiler 12 as and when required during the year 2026 27
IC -Divn:Service Charges towards Annual maintenance contract offer for 6Nos PLC system 3nos GE intelligent platform PLC system 2Nos Schneider PLC System and 1No Honeywell PLC system for FY 2026 27
CAM Divn Certain 200 or 250 NB MS or CI Coupling gaskets along with ash intake valve and poke dummy gaskets replacement work in ESP passes as and when required during the 2026 27
CAM-Divn:Service Charges for deputation of service engineer to attend servicing or Overhauling of 4Nos of Chlorination strams which are available in CW Chlorination plant of KTPS VII Stage Paloncha for the year 2026 27
CAM-Divn:Annual maintenance contract of 100T weighbridges 2Nos in fly ash handling system for a period of one year from the date of commencement of service PO for the FY 2026 27
TM:Divn Testing of Fyrquel EHC N oil samples of Main HPSU skid, LPBP HPSU skid and Servo prime 46 oil used in MOT TDBFP A and B and Servo conval 46 oil used in HPBP HPSU Skid as and when required During the year 2026 27
BM -Divn:Charges for Deputation of service personnel along with equipments to carry out heat treatment works for replacement of grinding rolls from Journal hub of HP1103 Bowl mills as and when required during the year 2026 2027
CAM-Divn-Servicing charges for overhauling of 4Nos dryers instrument air plant area 2 nos model SI 080DA and instrument air silo area 2 nos model SI 040DA in fly ash handling system of KTPS VII Stage as and when required during the FY 2026 27
Tm-Divn:Labour Charges towards HP welding works for replacement of high pressure damaged and erodedlines and valves in TM Division during the year 2026 27
CAM-Divn:Certain inspection and replacement of filter bags and cages of vent filter at silo area and buffer hoppers at ESP area as and when required in CAM division during the FY 2026 27
Servicing charges for overhauling of 3 Nos of Package AC units in Hitachi AHP PLCC Control room and 3 Nos of Stulz make Package AC units in MCR Control room of KTPS VII Stage Paloncha ( Total 6 Nos of Package AC systems as and when required during the FY 2026-27
CAM-Divn:Servicing Charges for Overhauling of 3Nos.TAC air Dryers make mellcon model CSt 91 in fly ash handling System of KTPS VII Stage as and when required during the FY 2026 27
Providing of 1 No Jeep or Bolero including driver salary,fuel charges, fixed charges and maintenance charges, road taxes, Insurance, all statutory payments etc on hire basis at 12 hours per day for a mileage up to 1500KM per Month for the official utilization of Divisional Engineer BM OandM KTPS-VII-stage for the period w.e.f 01-04-2026 from the actual date of commencement to 31.03.2027
TGGENCO-Chemicals-Procurement of 35MT Caustic Soda in the form of Solid Flakes as per IS:252-2013(Reaffirmed 2018) required for KTPS-V Stage of TGGENCO
CAm-Divn-Annual maintenance contract AMC for Ingersoll rand I Ltd make 2nos instrument air compressors model SM55 AC at silo area in fly ash handling system of KTPS VII Stage for the FY 2026 27
IC-Divn:Service Charges for deputation of service engineer towards repair and rectification of M/s.HACH Make sodium and silica analyzers located at CPU service area and DM plant area for FY 2026 27
KTPS-VII Stage-TM Division- Complete overhaul of Planetary gear box of debris filter system in condenser inlet pipe line during any unit emergencies for the year 2026-27
Labour charges for Servicing overhauling of 3 Nos dryers Instrument Air compressors model FX 20 W in the compressor house of KTPS VII stage as and when required during the FY 2026 27
BM-Divn:Reconditionin g or Refurbishment of used coal compartment assemblies of KTPS VII Satge 1X800MW Boiler
CAM-Divn:Service charges for deputation of Service engineer to attend servicing of Ms Greaves cotton make diesel engine pertaining to Hydrant booster pump of fire fighting system in KTPS VII Stage paloncha for four visits in FY 2026 27
CAm-Divn:Annual maintenance contract of CUMMINS make 2Nos DIESEL ENGINE Model 4BTAA 62.5KVA pertaining to wet ash system of KTPS VII Stage paloncha in FY 2026 27
CAM:Divn: Repairing and Reconditioning of 300NB knife gate valves of of silo unloading system in Fly Ash handling system as and when required during the year 2026 27
TM :Divn:Certain machining works to be carried out during the year 2026 27
TM-Divn:Thermal insulation and spray insulation works to be carried out during emergency or running maintenance as and when required during the year 2026 27
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1A/B tunnel along the conveyor, TP-1 including FG-3 and 4 floor, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor, apron feeder floor and BCN-2AB tunnel including FG-1 and 2 floor by head loads on to running conveyor required in MM-I sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.07.2026.
Supply of Refrigerant Lubricant Oil RL - 170 required for Unit CCR chiller of CAM/Stage-II/BTPS
Supply of HYDAC Make Control Fluid pumps and Recirculation pumps for LPBP system and Recirculation pumps for Main Governing systems of TM Division/Stage- II/BTPS
TGGENCO-YTPS-Up Keeping and Maintenance of BOP Switch Gear-I, Compressor Building- I, DG Building-I, ETP, Ammonia Storage Plant, Booster Pump House at Yadadri Thermal Power Station at Veerlapalem(V), Dameracherla(M) in Nalgonda district for the period from actual date of commencement of work to 31.03.2027
TGGENCO-YTPS (5x800 MW) - Up keeping and maintenance of Stage II Ash Handling Structures including Ash Recovery System in Dyke area of Yadadri Thermal Power Station at Veerlapalem (v), Dameracherla(m) in Nalgonda District from the actual date of commencement of work to 31.03.2027 for FY 2026-27
TGGENCO-YTPS(5X800MW)-Providing ornamental plants and its structure for CCR-II (Stage-II) at EL 17.70 mts floor of TG building at (5x800MW) Yadadri Thermal Power Station, Veerlapalem(V), Dameracherla(M), Nalgonda Dist.
Supply of Gate Valves for 150MW Hydro Generating Units at SLBHES, Srisailam Dam West, Srisailam Dam West NagarKurnool (Dist) - 509326, TELANGANA
Supply of Bearings for LT Motor and PF Shut off gates
Supply of Spares for Main Control Valve, Auxiliary Control Valve and Stop Valve of BHEL make Drive Turbine Model K1402-1
Supply of Vibration Meters and its Spares