Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
676 results • Latest
Supply of industrial Safety Helmets yellow color
Supply of Cylindrical Sponge Balls
TGGENCO-KTPP-Stage-II-General-Reconditioning, testing and certification of H2 Gas cylinders of KTPP Stage-II during 2026-27
Supply of ACI Flanged bends for APH and DUCT Hoppers in ash handling plant of CAM/Stage-II/BTPS
Supply of Lab Consumables for ECG Machine, Automatic Hematology Analyzer, Semi-Automatic Biochemistry Analyzer, Testing Kits and other miscellaneous consumables for Dispensary/YTPS.
TGGENCO-KTPP-Stage-II-CAM-Comprehensive Annual maintenance contract(AMC) for 2 units of Voltas make packaged chillers cooling system HVACs of TG and ESP buildings including AHUs, Chilled water pumps, Condenser pumps and cooling towers for a period of 12 months for the year 2026-27 from the actual date of work commencement
Supply of Refrigerant R-22 required for 1 No. 75 TR AC Chiller (Make: Blue Star; Model: LCW75A) and 6 Nos. Packaged Air Conditioners (Make: Blue Star; Model: DPA901), and Refrigerant R-134a required for Ventilation Chillers No. 2 and 3 and the new 100 TR AC Chiller installed at SLBHES,DG set Building for ensuring reliable operation and maintenance of the AC and Ventilation systems at SLBHES, Srisailam Dam West. NagarKurnool (Dist) - 509326, TELANGANA.
SUPPLY OF SPECIAL WELDING ELECTRODES
Supply of Gum Boots
Hire charges for Tractor for Transportation of material and T and P by engaging Tractor including carrier from section stores to ash pond 10KM internal transportation from one spot to another spot to arrest slurry leakes on SD pipe lines and replacement of damaged 300 NB slurry pipes Cast basalt Bends DG Set and coupling sets in the SD pipe lines during the year 2026 27.
Supply of High Pressure Boiler Hydraulic Test Pump with accessories and Spares for Unit-1 and 2 Boilers/Stage-I/ BTPS
Supply of Motor Operated Hand operated Globe valves and Gate valves for KTPS-V Stage
BTPS - CHP - Cleaning, Sweeping and Wet Cleaning of MCC-I,II,III and their cable vault rooms, Battery Rooms, DS Pump House, FOUPH and Removal of all kinds of Scrap, Removal of Spider-Webs, Debris, Cleaning of Glass Glazings as per the instructions of the officials on regular basis of the areas specified above during the FY 2026-27 in Operation and Electrical division/CHP/BTPS
Supply of R-134A refrigerant and Nitrogen gas for CCR Chiller of Make: Kirloskar, Model :KWK-265.24 of CAM Division/ Stage-I/BTPS
NSHES- O and M- CSDI- NSLCPH- Providing of external painting to the Rest House in NSLCPH
Supply of Sponge Cleaning Balls
KTPS-VII Stage - Civil - O and M-I - SD-II - Providing of wet Mix approach road beside MCC1 to C and I Storage shed in CHP area of KTPS Stage-VII, Paloncha
Supply of Insulation tapes, Rustolene and Contact cleaners
Supply of 10KV Insulation resistance tester- Megger for 150MW generator units at SLBHES, Srisailam Dam West, Srisailam Dam West NagarKurnool (Dist) - 509326, TELANGANA
Supply of Argon Gas
Supply of General Consumables
Supply of Telecom cable and handsets required for laying of cable at PAT, Crown audit tunnel and also for regular maintenance at SLBHES, Srisailam Dam West, Srisailam Dam West NagarKurnool (Dist) - 509326, TELANGANA
Supply of Spares for Alfa Laval centrifuge oil Separator (Type : MAB 103B-24) at SLBHES, Srisailam Dam West, Srisailam Dam West NagarKurnool (Dist) - 509326, TELANGANA
TGGENCO-YTPS(5X800 MW)-BE-IV-Rectification of tube leaks in Boiler-4,on call basis during emergency shutdown from the actual date of commencement of work to 31.03.2027 during the FY 2026-27
Supply of electrical consumables required for electrical services sub division at SLBHES, Srisailam Dam West, NagarKurnool (Dist) - 509326, TELANGANA
Supply of Intermediate Street light poles along with 120W LED Street Lights at SLBHES Colony, Srisailam Dam West, Srisailam Dam West NagarKurnool (Dist) - 509326, TELANGANA
Supply of TG PHE Plates
Supply of Gaskets
Supply of Regulators
SUPPLY OF SUBMERSIBLE DEWATERING PUMP SETS
Supply of House Keeping Materials
Supply of Metallic and Pure Graphite Gland Packing Rings
Supply of Oxygen Gas
Supply of CO2 Gas
Supply of Bearings for ADPs, PA Fan, MILLS, TAC Motors and BCW Pumps of KTPS-V Stage
Supply of Bearings for PA, FD Fans Rotors of KTPS-VI Stage
Refractory Cooling Header and Anchor Rods
TGGENCO-YTPS(5X800MW)-Supply of Single Compound to control Scaling and Corrosion (Antiscalant) for Cooling Water Treatment of Unit-1 and Unit-2 of YTPS
TGGENCO-YTPS(5x800MW)-Stage-1- Unit-1 Carrying out breakdown maintenance works of Air-preheaters and overhaul of Air-preheaters and its gearboxes in Unit-1 as and when required on an urgent on call basis from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement
Supply of Gas Distribution Screen for Upcoming Overhaul of Unit-IV/Stage-II, BTPS
TGGENCO-YTPS(5X800MW)-TE-II- Maintenance works carried out for CW, ACW, TGDMCW, SGDMCW in TM-II/Stage-I, YTPS in FY 2026-27 from actual date of commencement to 31.03.2027
TGGENCO - YTPS - Supply of Fin Bar Plates for Boiler/Unit -I and II of Stage-I/YTPS.
TGGENCO- YTPS (5x800MW)-Stage-1-Unit-1 -Carrying out breakdown maintenance of ESP fields in Unit-1 as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1-Carrying out breakdown maintenance of PA, FD and ID Fans in Unit-I as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1 - Carrying out preventive, routine maintenance and minor repair works of APH, PA Fans, FD Fans, ID Fans, ESPs, Ducts AND Gate areas of Boiler-I as and when required for the period from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 1 - Rectification of tube leaks in Boiler-1, on an urgent on-call basis during emergency shutdown from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement to 31.03.2027.
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1 - Cleaning and Inspection of Oil Filters, Strainers, Control Valves and Oil Skids of TDBFPs and MDBFPs in TM-I/Stage-I, YTPS in FY 2026-27 from 01.04.2026 to 31.03.2027
Supply of Regeneration Chemicals for FRF oil (Control Fluid) in Main Turbine Governing and LP Bypass systems of TM Division/Stage-I/BTPS
BTPS-CHP-Cold and hot vulcanization belt joints for the 1400mm BW conveyors BCN-8, BCN-9 and Stacker cum reclaimer-1 and 2 conveyors in MM-IV Sub Division of MM/CHP/BTPS for FY 2026-27 as and when required for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Overhaul and alignment of LT motors of various capacities in LT-I/Sec-I and II sub division of Operation and Electrical/CHP/BTPS as and when required for the period from 01.04.2026 or from actual date of commencement of work to 31.03.2027