Loading…
Loading…
841 results • Latest
BTPS - CHP - Regular and preventive maintenance for vibrating grizzly feeders-1,2,3 and 4 as and when required in MM-II Sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Regular and preventive periodical maintenance for ring granulators-1,2,3 and 4 as and when required in MM-II Sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
TGGENCO BTPS Chemical Division II Mixing of Alum and Poly Electrolyte at Ash Plant Clarifier (Auxiliary Clarifier Stage-II) as when and wherever required for the period from 01.04.2026 to 31.03.2027
TGGENCO BTPS STAGE II EM Division Up keeping of Switchgear Rooms Cable galleries and HT and LT motors of EM Stage II BTPS for the year FY 2026-27
TGGENCO BTPS STAGE II BM-Division Preventive Periodical Breakdown Maintenance of chain conveyor type mill reject system of XRP 943 Bowl Mills Unit-3 and 4 of Stage-II BTPS for the financial year 2026-27 i.e. for the period 01-04-2026 to 31-03-2027
Supply of different types and different capacities of Fire Extinguishers
Supply of VG-46 hydraulic oil required for UGB reservoir of Unit-4 and top up of Lower guide bearing and Upper guide bearing reservoir of 150MW generator units at SLBHES, Srisailam Dam West, Srisailam Dam West NagarKurnool (Dist) - 509326, TELANGANA
Relative humidity chamber
TGGENCO-YTPS-BE-IV- Carrying out Routine maintenance of all Boiler floors from top EL+95 meters to ground floor near Condensate Transfer Pumps area, minor repairs of LDO and HFO oil guns and removing of clinker formation at S-panel for the period from actual date of commencement of work to 31.03.2027 for the FY 2026-27
Supply of Spares for Rotex make Soleniod valves,valve seal kits and coils in Boiler area of Unit-I and II/ Stg-I/BTPS