Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
676 results • Latest
Removal of spilled over coal, fine dust and wet coal at tail end, headend, along the BCN - 4A/B, 5A/B, BCN - 10, TP-3, TP-4, 6A/B tail end and ERH area by head end loads on to running conveyor in MM-III subdivision of MM/CHP/BTPS from 01.08.2026 or actual date of commencement work to 30.11.2026.
Removal of spilled over coal, fine dust and wet coal at tail end, head end, along the BCN-7A/B, 6A/B head end, 6A/B gallery, bunker floor and TP-5 area by head loads on to running conveyor required in MM-III sub division of MM/CHP/BTPS from 01.08.2026 or actual date of commencement of work to 30.11.2026.
Supply of DD valve spares
Supply of spares for vacunair make vacuum pumps
Procurement of Main Turbine Thermocouples pertaining to Bearing and Condenser wall Temperatures in Stage-I and II/BTPS
Supply of Air limit switches, limit switches for pneumatic actuators in Ash Handling Plant pertaining to I and C div/Stage-II/BTPS
Supply of Horizontal split case centrifugal pump
BTPS-CHP-Removal of spilled over coal, fine dust and wet coal of BCN-3A/B tunnel, FG-5 and 6 floor at TP-2, ground portal, gallery and head end areas and contigency-1 and 2 area of 3A/B including FG floors and reclaim belt conveyor and reclaim chain feeders by head loads on to running conveyor feeders as and when required in MM-I subdivision of MM/CHP/BTPS from 01.08.2026 or actual date of commencement of work to 30.11.2026.
Utilization of Service Engineer for servicing of various boiler and turbine actuators of Stage I KTPP during Unit Capital Overhaul Works 2026 27 and Regular Maintenance Works
BMD- Testing and metallurgical analysis to find out root cause of failure in Boiler tubes for the year 2026-27
BTPS - CHP - Removal/lifting of spilled coal from counter weight areas of BCN- 3AB and below the conveyor galleries of BCN 3A/3B, outside areas of TP-1, TP-2, Crusher house area, TP3, TP4, TP5, conveyor BCN-4A/4B, 5A/5B, BCN 6A/6B, 7A/7B and below all the conveyor galleries and transporting to stock piles yards for the FY-2026-27
TGGENCO-YTPS(5X800MW)-Supply of Castable Refractory for Unit-1 Bottom Ash hoppers in Ash Handling Plant, YTPS Stage-I
BTPS - CHP - Erection of reconditioned/fabricated dummy MS plates and SS/Sail Hard liner plates to the hitting areas of discharge chutes, patch welding for the conveyors BCN-1A/B, 2A/B, AFD-1 and 2 and connecting chutes at TP-1 and FG-1,2,3 and 4, BCN-3A/3B and connecting chutes at TP-2 and FG-5 and 6 and contingency-1 and 2 chutes in MM-I Sub division of MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027
BTPS - CHP - Replacement of new/reconditioned flap gates, diversion plates, actuators, guide pipes, counter weight structer, oil top up and greasing, belt sway, etc for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor BCN-1A/1B, BCN-2A/2B, BCN-3A/B and ILMS 1 and 2 and contingency reclaim belt conveyors -1 and 2 from 01.04.2026 or actual date of commencement of work to 31.03.2027 required in MM-I sub division of MM/CHP/BTPS.
BTPS - CHP - Replacement of New/Reconditioned rollers and frames, fabrication and erection of skirt rubber, scrappers etc. for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor BCN - 1A/1B, BCN - 2A/2B, BCN - 3A/3B and ILMS 1 and 2 and contingency reclaim belt conveyors -1 and 2 in MM- I sub division in MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027
BTPS - CHP - Maintenance of conveyor equipment viz pulleys, bearings/sleeves of pulleys, realignment and Geared coupling, periodical and breakdown works as and when required for the conveyors-BCN-1A/1B, 2A/2B, 3A/3B, reclaim belt conveyors-1 and 2, ILMS and flap gates required in MM-I subdivision of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Up-Keeping and cleaning of all field control panels, VGF panels, VFD panels, SM and ILMS Rectifier panels, Lighting LPs, Power and control JBs, LPBS, Sump Pumps along with their panels, all LT PMCCs, from BCN-1A/1B to BCN-3A in all TPs and up to Crusher House etc. in LT-I subdivision of Operation and Electrical/CHP/BTPS for the period from 01.04.2026 or from actual date of commencement of work to 31.03.2027
Supply of critical Type-A2 bearings (Make- SKF/Schaeffler/TIMKEN/NTN) for seal air fans in BM Division/Stage-I and II/BTPS
Supply of labyrinth seal, Bowl extension ring and upper journal bearing keeper shim set of XRP-943 Bowl mills
BTPS - CHP - Replacement of engine cylinder head/liner and track repair work, repairs and reconditioning of radiators, Silencers, Oil coolers, cabin glasses, windows, electrical and AC repair work, repair and reconditioning of self -motors, alternators, fuel injection pump(FIP) and turbo chargers, Replacement/Rearrangement of brake band shoe/liner, lift cylinder seals, tilt cylinder seals and track recoil cylinder seals of BD-355/BD-155 bull dozers as and when required in MM-IV sub division of MM/CHP/BTPS during the FY 2026-27
Supply of Variant-1 (Flat),Variant-2 (Right-up) and Variant-3 (Left-up) Coal nozzles (ASTM A536 Gr. 65-45-12) with Divider Plate, Support legs, Brackets, Reach Rod, Flange gasket,12 No of HT Studs with HT nuts and washers(Note: Hard facing of Divider Plate should be done) for 270 MW Boiler (Should be One to One Replacement at Unit-4/BTPS) in BM Division/Stg-II,BTPS
Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1A/B tunnel along the conveyor, TP-1 including FG-3 and 4 floor, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor, apron feeder floor and BCN-2AB tunnel including FG-1 and 2 floor by head loads on to running conveyor required in MM/CHP/BTPS from 01.08.2026 or actual date of commencement of work to 30.11.2026.
BTPS - CHP - Preventive and breakdown maintenance of coal sampling system, ventilation system at MCC-3 and ERH, DE system-1,2,3,4 at bunker floor required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
KTPS-V VI Stages- Civil- O M-I- Providing CC pedestals to the steel columns of ETP area and GCI sheet roofing to the boiler, I C stores shed, cladding to the silos and brick walls to the storage shed of CAM sub division of KTPS-VI Stage
Supply of Separator body liners set for XRP-943 Bowl Mills of Stage- II BTPS
BTPS - CHP - Erection of rubber bellows for ring granulators, Fabrication and Replacement of chute liner plates, Chute patch welding at coal hitting areas for all chutes and greasing to all bearings, scoop couplings, geared couplings, gear boxes, Carden shafts belongs to crusher, VGF, BF and Flap gates in MM-II sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Cold vulcanization belt joints, pulley lagging for the 1400mm BW conveyors, BCN-4A/B, BCN-5A/B,BCN-6A/B, 7A/B and BCN-10 of conveyors as and when required in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Overhaul and Replacement of bearings for 3-phase LT motors of various ratings in Unit-4 of Stage-II of YTPS as and when required for the year 2026-27
Supply of bearings (MAKE-SKF/SCHAFFLER/TIMKEN) for Type-III reducer gear box of APH in BM Division/Stage-I/BTPS
Supply of Fire hoses and Fire hose Branch pipes with nozzle required for the BTPS plant for the year 2026-27.
TGGENCO-YTPS(5x800 MW)-Supply and fixing of Cubical partiotions in the offices of all floors of Service Building-I at Yadadri Thermal Power Station,Veerlapalem(V), Dameracharla(M), Nalgonda Dist.
Supply of Humidity Oven for coal lab in chemical division at BTPS
Supply of Portable Oil Filtration machine along with Centrifuge and inbuilt heater suitable for XRP -943 Bowl Mills Lube Oil System of Stage-II/ BTPS
Supply of DM Plant Pressure sand filter media and Activated carbon filter Media
Certain online arresting of Steam or feed water leakages from various High Pressure Lines and Valves glands while unit is in service as and when required from the date of commencement of work to 31.03.2027 in Unit 4 Boiler
TGGENCO-YTPS(5X800 MW)-Stage-II-BE-III - Loading, transportation , unloading and cleaning of mill rejects coal, debris and coal from feeders floor area, mill pits, mill surrounding area at zero meter and dumping at the designated area earmarked in the coal plant on as and when required basis from 01.07.2026 or from the actual date of commencement to 31.03.2027
Supply of Fabric Reinforced Nitrile Rubber Sheets for BM Division of Stage I and II, BTPS
Carrying out Routine maintenance of all Boiler floors from top EL 95 meters to ground floor near Condensate Transfer Pumps area, minor repairs of LDO and HFO oil guns and removing of clinker formation at S-panel as and when required in Unit-3 for the period from actual date of commencement to 31.03.2027 for the FY 2026-27
TGGENCO-YTPS(5X800 MW)-BE-IV- Carrying out breakdown maintenance of PA, FD and ID Fans in Unit-IV as and when required from the actual date of commencement of work to 31.03.2027 for the FY 2026-27
Supply of ball valve and butterfly for Fire fighting system, AC system and Air system of CAM division/Stage-I/BTPS
Supply of first aid fire hose reel, high pressure rubber braided hose, SS shut off nozzle and Water monitor for Fire fighting system of CAM Division /Stage-I/BTPS
TGGENCO-YTPS(5X800 MW)-TE-IV-Carrying out of works for the condensate path system, comprising Condensate Extraction pumps(CEP) and condensate Polishing Unit(CPU) in Turbine Maintenance Division of Unit-4 from actual date of utilization to 31.03.2027 for the FY 2026-27
TGGENCO - NSHES - Supply of Sulphur Hexafluoride-SF6 Gas with cylinder non-returnable at NSHES, Nagarjuna Sagar.
TGGENCO - NSHES - Supply of Precision Transformer Winding Resistance meter with 01 Channel OLTC along with its accessories at NSHES, Nagarjuna Sagar.
Supply of spares required for CCR Chiller of Make: Kirloskar, Model :KWK-265.24 in CAM Division of Stage-I/BTPS
Manufacture, Testing and Supply of 3,000mtrs of FR Grade NYLON/NYLON Conveyor Belt required for coal handling plant of YTPS of TGGENCO.
TGGENCO - NSHES - Supply of certain consumables, LED lights and Switches at NSHES, Nagarjuna Sagar.
Supply of Ultra coolant, air filter and oil filter for SILO Air Compressors of MODEL,SM55AC,Make Ingersoll Rand(India)Ltd. of CAM Division/Stage-I/BTPS
Supply of 120 meters, 2200 mm width, breaking strength: 400 KN/M, Number of plies: 4, top 5 mm/bottom 3 mm thickness, FR Grade, Nylon/Nylon, moulded edges, Heavy duty Conveyor Belt for Belt Feeder Conveyors (BF-8 and BF-6) and spare belt in Crusher House of MM-II/Coal handling plant/YTPS.
Supply of 200 meters, 1800 mm width, 2000 KN/M breaking strength, 5 plies, top 8 mm and bottom 3 mm thickness, FR Grade, Nylon Nylon, moulded edges, heavy duty conveyor belt for CHP.