Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
676 results • Latest
TGGENCO-YTPS(5X800 MW)-BE-III-Carrying out breakdown maintenance of Mill Rejection System Of HP-1103 Bowl mills in Unit-3 as and when required on an urgent call basis from 01.07.2026 or from the actual date of commencement to 31.03.2027
BTPS - CHP - Cold and Hot vulcanization belt joints, pulley lagging for the conveyors BCN-1A/B, 2A/B, 3A/B Reclaim belt conveyors and Dribble Feeders as and when required in MM-I sub division of MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 30.09.2026.
TGGENCO-YTPS(5X800 MW)-TE-IV-Testing of Fyrquel EHC-N oil samples used oils in turbine division-4 during the year 2026-27
TGGENCO-YTPS(5X800 MW)-BE-III- Carrying out Round-the-clock operations and minor repair works of Mill Rejects System of Unit-3 from the actual date of commencement to 31.03.2027 for the FY 2026-27
TGGENCO-YTPS(5X800 MW)-BE-III- Carrying Out breakdown maintenance in Unit-3 of Bowl Mill Grinding roll assemblies with roll sleeve, ring roll setting, roll journal yoke assemblies, tension rods, spring loading system components and removal of foreign materials as and when required from the actual date of commencement of work to 31.03.2027 for the FY 2026-27
TGGENCO-YTPS(5X800 MW)-BE-III- Carrying out preventive and routine maintenance and minor repair works of HP-1103 Bowl Mills, Gravimetric Feeders, Coal Pipes, Mill Lube Oil Systems, and their connected equipment in Unit-3 for the period from or actual date of commencement to 31.03.2027 for the FY 2026-27
TGGENCO-KTPS VII Stage/Paloncha - Supply of Wear seal rings for journal Assemblies of HP1103 Bowl mills
TGGENCO-KTPS VII Stage/Paloncha - Supply of Power cylinders seals for feed gate at bottom ash hopper
TGGENCO-KTPS VII Stage-Paloncha- Supply of Vibration meter and Portable Calibrator
Supply of certain Boiler Tubes required for 1x500MW Unit of KTPP Stage-I and for 1x600MW Unit of KTPP Stage-II
Supply of Consumables for Xerox make VersaLink B7125 DPCs at TGSHAKTHI Building, GTS Colony, Hyderabad and BTPS, Manuguru and Xerox make C325 MFPs at Vidyut Soudha, Hyderabad
TGGENCO-YTPS-Supply of various sizes of champion make gaskets used in Turbine Divisions of Unit-I and II for Stage-I/ YTPS.
CAM-Divn:Angular rotation of 300NB dia MSERW ash slurry disposal pipelines -1 2 and 3 to an angle 120degree from ash slurry pump house to power house boundary wall as and when required during the year 2026 27 in wet ash handling system
CAM-Divn:Angular rotation of 200NB MS pipes of Slurry discharge lines from collection tank to slurry sump of ESP A B C and D passes in fly ash handling systemas and when requiredduring the FY 2026 27 in KTPS VII Stage
Conducting Mandatory Energy audit of 2 X 250 MW and 1x500MW Units of Kothagudem Thermal Power Station (KTPS), Stage-V and VI by Empanelled Accredited Energy Auditor Firm recognised by Bureau of Energy Efficiency (BEE), New Delhi in line with the Bureau of Energy Efficiency (Manner and Intervals of Time for Conduct of Energy Audit) Regulations, 2010 under Energy Conservation Act, 2001.
Consumables in Ash handling system, KTPS-VI Stage
BTPS - CHP - Clearing of chute jams from BCN-1A/1B conveyor to bunker floor required in Operation and Electrical division of CHP/BTPS for a period of 03Months from 01.07.2026 or from actual date of commencement of work.
TGGENCO - YTPS - Supply of Log books for CCR/MCR and other shift locations for official use at YTPS/Stage-I
TGGENCO-KTPP-STAGE-II-EMD-Utilization of services for inspection and repair of M/s Statcon make Float cum Boost Charger(220V,550A) and station Float Charger(220V,500A) as and when required during the year 2026-27 in EMD/Stage-II/KTPP
Supply of Protection Shields /Shrouds with 2 Nos suitable clamps for BM div of Stage-I/ BTPS.
TGGENCO-KTPS VII Stage/Paloncha - Supply of Mellcon make Air Drier spares
TGGENCO- KTPS-VII Stage-BM- Procurement of taper roller bearings
Supply and Configuration of Digital Boards (75-inch Interactive Flat Panel Display Units with Accessories) for various DAV Schools of TGGENCO
Supply of Consumables required for HP make E78528 Colour DPCs and HP make M42625dn Mono DPCs available at YTPS
TGGENCO-CETD-Div-I- Supply of Sports Items for CETD/TGGENCO
BTPS - CHP - Periodical and breakdown maintenance of vibro feeders, counter weights, sump pumps and other miscellaneous equipments for the conveyors BCN-10, 4A/B, 5A/B, 6A/B, 7A/B, TP-3, trippers TP-5, TP-4 and ERH as and when required MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS-CHP-Regular maintenance and minor repair works of all mechanical equipment of stacker cum reclaimers-1 and 2 and preventive and breakdown maintenance of belt conveyors and conveyor equipment for BCN-8, BCN-9, Boom conveyors intermediate conveyors and tipper conveyors as and when required in MM-IV sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of utilization of work to 31.03.2027
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at tail end, head end, along the BCN-4A/B, 5A/B, BCN-10, TP-3, TP-4, 6A/B tail end and ERH area by head loads on to running conveyor in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of utilization to 31.07.2026
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at BCN-3AB tunnel, FG-5 and 6 floor at TP-2, ground portal, gallery and head end areas and contingency-1 and 2 area of 3AB including FG floors and reclaim belt conveyors and reclaim chain feeders by head loads on to running conveyor required in MM-I sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.07.2026.
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at tail end, head end, along the BCN-7A/B, 6A/B head end, 6A/B gallery, bunkers floor and TP-5 area by head loads on to running conveyor required in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.07.2026.
TGGENCO BTPS STAGE-II Chemical Division-II - Analysis charges of Coal, and Ash Samples for the year 2026-27 for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027
TGGENCO BTPS STAGE II CAM Division-Preventive periodical maintenance and servicing of Precision air conditioners present in ESP Control room, Packaged air conditioners present in Administration Building and 220V DC battery chargers of stage-II and split ACs for the year 2026-27
BTPS - CHP - Periodical and breakdown maintenance for apron feeders chain required in MM-I sub division of MM/CHP/BTPS from 01.04.2026 or the actual date of commencement of work to 31.03.2027
BTPS - CHP - Regular and preventive maintenance for vibrating grizzly feeders-1,2,3 and 4 as and when required in MM-II Sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Regular and preventive periodical maintenance for ring granulators-1,2,3 and 4 as and when required in MM-II Sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
TGGENCO BTPS Chemical Division II Mixing of Alum and Poly Electrolyte at Ash Plant Clarifier (Auxiliary Clarifier Stage-II) as when and wherever required for the period from 01.04.2026 to 31.03.2027
TGGENCO BTPS STAGE II EM Division Up keeping of Switchgear Rooms Cable galleries and HT and LT motors of EM Stage II BTPS for the year FY 2026-27
TGGENCO BTPS STAGE II BM-Division Preventive Periodical Breakdown Maintenance of chain conveyor type mill reject system of XRP 943 Bowl Mills Unit-3 and 4 of Stage-II BTPS for the financial year 2026-27 i.e. for the period 01-04-2026 to 31-03-2027
Supply of different types and different capacities of Fire Extinguishers
Supply of VG-46 hydraulic oil required for UGB reservoir of Unit-4 and top up of Lower guide bearing and Upper guide bearing reservoir of 150MW generator units at SLBHES, Srisailam Dam West, Srisailam Dam West NagarKurnool (Dist) - 509326, TELANGANA
Relative humidity chamber
TGGENCO-YTPS-BE-IV- Carrying out Routine maintenance of all Boiler floors from top EL+95 meters to ground floor near Condensate Transfer Pumps area, minor repairs of LDO and HFO oil guns and removing of clinker formation at S-panel for the period from actual date of commencement of work to 31.03.2027 for the FY 2026-27
Supply of Spares for Rotex make Soleniod valves,valve seal kits and coils in Boiler area of Unit-I and II/ Stg-I/BTPS
Supply of L and T make ball valves and spares
Kirloskar make IAC spares
Supply of chlorination system spares for PTP
Body of Basket Strainers for PHEs
Nozzle adaptors for DM vessels
Carrying out preventive and break down maintenance of soot blowers and wall blowers; repairing, servicing and overhauling of valves, as and when required for the period from the actual date of commencement of work to 31.03.2027
TGGENCO-YTPS(5X800 MW)-BE-IV-Certain preventive and general maintenance works at APH area, PA fans, FD fans, ID fans, ESP location, Ducts and gate area in Unit-IV for the financial year 2026-27