Loading…
Loading…
841 results • Latest
TGGENCO-YTPS(5X800 MW)-BE-III- Carrying out Round-the-clock operations and minor repair works of Mill Rejects System of Unit-3 from the actual date of commencement to 31.03.2027 for the FY 2026-27
TGGENCO-YTPS(5X800 MW)-BE-III- Carrying Out breakdown maintenance in Unit-3 of Bowl Mill Grinding roll assemblies with roll sleeve, ring roll setting, roll journal yoke assemblies, tension rods, spring loading system components and removal of foreign materials as and when required from the actual date of commencement of work to 31.03.2027 for the FY 2026-27
TGGENCO-YTPS(5X800 MW)-BE-III- Carrying out preventive and routine maintenance and minor repair works of HP-1103 Bowl Mills, Gravimetric Feeders, Coal Pipes, Mill Lube Oil Systems, and their connected equipment in Unit-3 for the period from or actual date of commencement to 31.03.2027 for the FY 2026-27
TGGENCO-KTPS VII Stage/Paloncha - Supply of Wear seal rings for journal Assemblies of HP1103 Bowl mills
TGGENCO-KTPS VII Stage/Paloncha - Supply of Power cylinders seals for feed gate at bottom ash hopper
TGGENCO-KTPS VII Stage-Paloncha- Supply of Vibration meter and Portable Calibrator
Supply of certain Boiler Tubes required for 1x500MW Unit of KTPP Stage-I and for 1x600MW Unit of KTPP Stage-II
Supply of Consumables for Xerox make VersaLink B7125 DPCs at TGSHAKTHI Building, GTS Colony, Hyderabad and BTPS, Manuguru and Xerox make C325 MFPs at Vidyut Soudha, Hyderabad
TGGENCO-YTPS-Supply of various sizes of champion make gaskets used in Turbine Divisions of Unit-I and II for Stage-I/ YTPS.
CAM-Divn:Angular rotation of 300NB dia MSERW ash slurry disposal pipelines -1 2 and 3 to an angle 120degree from ash slurry pump house to power house boundary wall as and when required during the year 2026 27 in wet ash handling system