Loading…
Loading…
214 results • Latest
TGGENCO-YTPS(5X800 MW)-TM-III-Testing of Fyrquel EHC-N oil samples used oils in turbine division-3 during the year 2026-27
Unit-3-Preventive and Breakdown Maintenance works of Unit-3 LT Switchgear of Electrical Maintenance division of Stage - II of YTPS as and when required for the FY 2026-27
Spares suitable for siemens make 420 KV,2000Amps,TP 415V Motor operated centre Break Isolator with single earth Switch type 400 KV HCB installed at 400 KV switchyard
TGGENCO-YTPS-Supply of A4 Size Copier papers required for official use at Yadadri Thermal Power Station.
TGGENCO-KTPS-VII Stage-TM- Procurement of Evaporator and Compressor for Atlas Copco Air Dryer Model- FX20 W of Instrument Air System.
TGGENCO-YTPS (5X800 MW)-Stage-I-AHP-Unit-2- Carrying out mechanical maintenance of complete ash handling system including preventive, periodical, Emergency and Break down Maintenance and House keeping of Ash Handling system, Unit-2, Stage-I, YTPS for the period of 1 month from 01.09.2026 or actual date of commencement of work to 30.09.2026 or till finalization of AHP AMC , whichever is earlier during FY 2026-27.
TGGENCO-YTPS (5X800 MW)-Stage-I-AHP-Unit-1- Carrying out mechanical maintenance of complete ash handling system including preventive, periodical, Emergency and Break down Maintenance and House keeping of Ash Handling system, Unit-1, Stage-I, YTPS for the period of 1 month from 01.09.2026 or actual date of commencement of work to 30.09.2026 or till finalization of AHP AMC , whichever is earlier during FY 2026-27.
TGGENCO BTPS STAGE II BM Division- Reconditioning of existing old coal nozzle tips by duly removing worn-out splitter plates with enriched design tip splitter plates for Unit 4 boiler during forthcoming overhaul in 2026-27
Supply of Specific Consumables for upcoming Capital Overhaul of Main Turbine and its auxiliaries