Loading…
Loading…
592 results • Best match
One Time Improvement for the stretch from Km 104.00 and 114.00 to 140.00 (Dharmawala to Jhajhra) of National Highway No-72 (New NH-07) after transfer from NHAI.
One Time Improvement for the stretch from Km 140.00 to 148.90 (Jhajhra to Ballupur) of National Highway No -72 (New NH-07) after transfer from NHAI.
Road Safety Audit Work of National Highways Situated in the State of Uttarakhand
Construction of drain in the section from Ch. 143.100 to Ch. 144.100 in the stretch from km 140.00 to 148.900 (Jhajhra to Ballupur) of National Highway No-72 (New NH-07) subsequent to its transfer from NHAI. (One Time Improvement work).
Under the deposit Scheme (NHAI) the work of repair and strengthening on National Highway No. 87 from Nariman Tirahe to Gaulapul in the Haldwani assembly area of Nainital district.
BEAUTIFICATION WORK AT MASZID AT NATIONAL HIGHWAY, SISAIYA - SITARGANJ (U.S. Nagar)
Strengthening work of the road on National Highway 109(old NH-87 Ext.) Panduwakhal to Karanprayag, from km 171.000 to km 200.00, km 218.00 to km 235.00 and construction of damaged scuppers and protection work between km 171.00 to km 200.00 in the sta
Carrying out Geophysical investigation of Vulnerable stretches on National Highways/ State Highways of various States in India.
Request for Proposal for procurement of Consultancy Services for Surveying of selected National Highway stretches with Network Survey Vehicle (NSV) in the State of Uttarakhand.
Tender for avenue plantation work in Muzaffarnagar Haridwar Section of NH-58 ch 150.000 to 166.000) and Roorkee Chutmalpur section of NH-73 (ch 0.000 to 11.000) under NHAI PIU Roorkee under NHAI Regional Office Uttarakhand in the state of Uttarakhand
Supply of Decentralized material for Shifting the electric lines in the National Highway
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-05)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-06)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-04)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-02)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-03)
Construction of C.C. Road from National Highway to NMY, Rudrapur Mandi Gate (Job-01)
Geophysical investigations of Vulnerable stretches on National Highway/ State Highway of various states in India
Realignment of Pipeline by HDD method across NHAI, Dehradun for Road crossing (NH-73) at Ch.107.610 Km of KRNPL Pipeline
Request for Proposal for procurement of Consultancy Services for Surveying of selected National Highway stretches with Network Survey Vehicle (NSV) in the State of Uttarakhand (Under Garhwal Zone)
Construction of Damaged R/wall andB/wall of National Highway 707A (Bataghat-Tehri section) in District Tehri Garhwal in the State of Uttarakhand under Special Repair Program 2024-25 and Estimates for Construction of Damaged walls of National Highway
Strengthening and improvement of NH-58(New NH-07) in Chainage km. 349.800 to 355.495 and Strengthening and improvement of NH-109(New NH-107) in Chainage km. 0.100 to 1.400 under Annual Plan of NH(O) 2022-23 in the State of Uttarakhand.
Improvement and maintenance of abandoned portion of Muzaffarnagar-Haridwar division of National Highway No.-58 Under Deposit work.
Geotechnical Investigation for Protection/Treatments of vulnerable stretches on National Highway/State Highway of various states of India
Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the State of Uttarakhand
Construction of drains from Ghantakarn Chowk (the crossing point located on Premnagar Paonta Sahib road) to Jhajhra Bridge, on the Asharodi Bypass under construction near Jhajhra on National Highway No. 72 in Dehradun district.
Renewal work by BC of the road connecting NH-58, Iris Bridge to Jwalapur-Laksar-Purkazi National Highway via Bairagi Camp, Vishwa Kalyan Ashram and Matra Sadan Ashram in Haridwar city Under Kumbh Mela 2027. (Length-6.740 km)
Protection work from km 189.00 to km. 243.000 0n NH-309 (Old NH-121 ) in the State of Uttarakhand
Empanelment of Advertising Agency in NHAI RO Uttarakhand
Providing and Fixing of welded steel wire Fencing to Cover ROW under Ajabpur ROB in Km 161 on NH-07 (Old NH-72)
Short Term Maintenance from Km 154.000 to Km 173.600 on NH-72B(New NH-707)
Short Term Maintenance from Km 133.150 to Km 154.000 on NH-72B(New NH-707)
Strengthening work from km 33.00 to km 37.00 on NH-72A (New NH-307) in the State of Uttarakhand
Strengthening work from chainage 0.00 to chainage 36.000 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the State of Uttarakhand
Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the state of Uttarakhand
Landslide treatment work from Ch 350.767 to Ch 350.938 (at Sirobagad) on NH-07 (old NH-58) in the State of Uttarakhand under Annual Plan 2025-26.
RECONSTRUCTION OF APPROACH ROAD FROM NHAI TO ROORKEE LPG PLANT
Short Term Maintenance (STMC) work Km 160.700 to 161.600 (Ajabpur ROB) on NH-72 (New NH-07) in the state of Uttarakhand
Strengthening work from Chainage 0.000 to Chainage 36.000 on NH- 107(A) Under Annual Plan of NH(O) 2019-20 in the state of Uttarakhand on EPC mode
Widening to 2L with PS from km 156.900 to Km 175.00 (Dugadda to Gumkhal) of NH-534 (Old NH-119) on EPC mode in the state of Uttarakhand.
Treatement of 04 no. of landslide zone from Dharasu to Yamnotri on NH-134(old NH-94) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2022-23
Strengthening work from Km 37.00 to 40.450 including Junction Improvements of NH-72A ( New No. 307) in the State of Uttarakhand under NH (0) Annual Plan 2021-22 EPC mode
Road Safety Improvement of Critical Junction in Manglaur (km 165.300) on Muzaffarnagar Haridwar Section of NH-334 in the Uttarakhand on EPC Mode under NH(O)
Short Term Maintenance (STMC) work km. 32 to 41 on NH-123(507)
Resurfacing work with Bituminous Concrete in Km 165 (Mohkampur ROB) of Nh-72 (New NH-07) under STMC 2023-24 in the State of Uttarakhand.
Landslide treatment work from Ch 341.00 to Ch 341.300 (Design Ch. 336.400 to 336.700) (at Farasu) on NH-07 (Old NH-58) in the State of Uttarakhand under Annual Plan 2025-26.
Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 (New NH-107) in the state of Uttarakhand Under EPC mode in the state of Uttarakhand
Engagement of user fee collection agency for Bhaguwala Fee Plaza at Km 31.600 of NH-74 (New NH-34) near Village Bhaguwala District Bijnor for the project of 4-laning of Haridwar Nagina of NH-74 in the state of Uttarakhand and Uttar Pradesh
CS for AE for Road Safety Improvement of existing Four Lane Section of Dehradun Lal Tappar Nepali Farm Section of NH-7 (501.930 to 531.330) and Nepali Farm Motichur Section of NH-34 (531.330 to 538.750) on EPC Mode in Uttarakhand under NH (O).
Treatment of 01 no. of landslide Location at Ch. 23.546 Km to 23.677 Km (Near Bosan village) on NH-507 (Old NH-123) in the State of Uttarakhand under Annual Plan 2025-26