Loading…
Loading…
592 results • Best match
Const of Realignment of NH87 New NH109 Sec of Rudrapur Kathgodam Ch.0.000 (Exist Km 54.050 of NH 87 to Ch.7.875 Exis Km61.550 Of NH 87 due to proposed Expansion of Pantnagar Airport L7.875 Km in Uttarakhand in EPC Mode
Independent Engineer services for supervision of Upgradation and Four Laning of Haridwar Bypass Package-1 From Ch. 0.000 (Km 188.100 of NH-58) to Ch. 15.100 (Km 5.100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode
Construction of Balance Work of Two laning with paved shoulders of Sitarganj Bareilly section of NH-74 New NH 30 from Km. 254.820 to Km. 329.280 in the State of UP Uttarakhand on PERCENTAGE RATE Mode under NHDP Phase-IV
Periodical Renewal work on NH-121 (309) from km. 78.00 to 100.00 (Sald Mahadev to Dhumakot) in the State of Uttarakhand
Strengthening work from Chainage Km 200.000 to Km. 232.000 on NH-119 (New 534) under NH(O) 2020-21 in the state of Uttarakhand on EPC mode
Rehabilitation and Upgradation of Single / Intermediate Lane to 2 Lane from Existing Chainage (Km 64.525 to Km 74.700) Design Chainage (Km 43.400 to Km 53.365) on NH -123 (New NH no. 507) under EPC mode in the state Uttarakhand
Consultancy work for the construction of a 4-lane Access Control Corridor from km 514 (Lachhiwala) of National Highway No. 72 (07) via Gular-Sports Stadium to Raipur (Maharana Pratap Chowk)
Short Term Maintenance (STMC) work km 195 to 217.425 on NH-134 in the State of Uttarakhand
Periodical Renewal (PR) between Km 239.00 to Km 242.00 and km. 244.00 to 250.00 on NH-707A in the State of Uttarakhand
Short Term Maintenance work from Km 239.00 to Km 242.00, Km 244.00 to 250.00 and Km 274.00 to 283.00 on NH-707A
Widening 2-lane to 4-lane from km. 155.100 to 160.700 (ISBT to Ajabpur Railway Crossing on NH-72 on EPC mode
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under BMP from Design Chainage 0.000 (Aksardham NH-9 (old NH-24)) to Design Chainage 14.750 (Delhi-UP Border) in the state of Delhi (Package-1) on EPC mode
Consultancy Services for preparation of DPR for Widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (Sitarganj) to km 52.200 (Tanakpur) of NH-125 (New NH-09) in the State of Uttarakhand (3rd Call)
Consultancy work for Rehabilitation and Reconstruction of Old Bridges on NH 07(Old 58) (From Rishikesh to Srinagar) Under Annual Plan 2025-26
Strengthening work from Km 68.570 to 75.00 on NH-107 in the State of Uttarakhand through an Engineering, Procurement and Construction (EPC) Contract.
Strengthening work from Km. 37 to 70 on NH107(A) under Annual Plan of NH(O) 2022-2023 in the State of Uttarakhand
Treatment of 01 Nos. of Landslide location (71.220 to 71.380)on NH-107 in the State of Uttarakhand under Annual Plan 2024-2025
Strenthening work of Mohkampur ROB both Side Service Lane with DBM and BC from 164.000 to 164.625 on NH-07 (Old No. 72)
Short Term Maintenance from Km 243 to Km 250 including Protection work (R/wall) on NH-534 (119)
Short Term Maintenance work from Km 197 to Km 200, Km 233 to 242 and Km 251 to 276 on NH-119 (New 534)
Strengthening work from km. 128.00 to 158.00 and km. 164.00 to 189.00 on NH-121(309) in the State of Uttarakhand on EPC mode
Performance Based Maintenance Contract from Ch.0.00 to 18.700 of NH 107 in the State of Uttarakhand (Length-18.70km) in the State of Uttarakhand
Periodical Renewal (PR) from Km 85.00 to 97.00 on NH-123 (New No. 507) in the state of Uttrakhand
Periodic Renewal of road from Km. 200.00 to 217.00 of NH-109(old 87Ext) in the state of Uttarakhand
Supervision consultancy for Construction and up-gradation of existing road from Km 491.600 to 504.371 And Km 509.725 to 528.000 of NH-58 (new NH-07)
Balance work of Widening to 2 lane with geometric improvement from km 60.00 to km. 64.825 (Actual chainage as per site km. 59.700 to km. 64.525 on NH-507 in the State of Uttarakhand under EPC Mode in NH(O) the year 2023-24
Short Term Maintenance work from Km 70.00 to km 205.00 and Km. 210.00 to 238.00 and Km 243.00 to 263.115 On NH-121 (New-309)
Restoration work of NH-707A damage due to Pipeline under Mussoorie Reorganization Sector in km. 140 to 160 (Cumulative length of damaged stretch-8.00 km)
Construction of CC Shoulder, Interlocking tiles, Drain from Sitapur (km 69) to Gaurikund (km 75) of NH-107 (Old 109) in the State of Uttarakhand
Short Term Maintenance work from Km 63.00 to Km 70.00 and Km 238.00 to 243.00 on NH-121(New 309)
Short Term Maintenance from Km 73 to Km 80 including Protection work (R/wall) on NH-534(Old No. 119)
Providing and Fixing of Barbed Wire Fencing RCC Fencing Poles in NHAI-125 on Sitaraganj to Tanakpur
Renewal of road surface and repair of wearing coat over ROB in km 31 and km 33 of NH 334A Under Short Term Maintenance 2023-24
Laying of interlocking tiles work in km. 148, 150, 154 (Kempty market area) of NH-707A in the State of Uttarakhand under Annual Plan (2024-25)
Rehabilitation of Ojree Bridge and Road Safety work from km. 201.00 to Km 204.00 (Design Chainage 79 to 83) on NH-134 under Annual Plan 2025-26
Construction of 70.0 M Span Steel Truss Bridge over Mandakini River at Km. 35 (Kund) on NH-107 in the State of Uttarakhand under Annual Plan 2025-26
Repair of damaged road surface due to laying of sewer line in Chainage 57.430 to 60.975 of NH 334A under Deposit in the District Haridwar State of Uttarakhand
Construction of 70.0 M Span Steel Truss Bridge over ALAKNANDA River at Km. 1 (CHAMOLI) on NH-107A in the State of Uttarakhand under Annual Plan 2025-26
Treatment of 01 nos. of landslide location at ch. 25.630 to 25.745 on NH-507 under EPC mode in the State of Uttarakhand under Annual Plan 2025-26.
Maintenance work in Km 276(CH.275.500 to 275.700) and Km 294.00(Ch 293.700 to 293.900) of NH-58 (New-07) under Short Term Maintenance work 2023-24
Improvement from Ch. 228.200 (Rishikesh Geetanagar Chowk) to Ch. 235.250 (Shivpuri, Brahmpuri) of NH-07 on EPC mode in the state of Uttarakhand under Annual Plan 2025-26
Landslide treatment work of 12 location on NH-58 from Km 235.420 (Shivpuri) to km 266.130 (Kodiyata) under EPC mode in the State of Uttarakhand on EPC Mode.
Construction of 85.68 M span Steel Girder 2-Lane bridge in Belni at km 1.00 of NH-107 in the State of Uttarakhand under Annual Plan 2025-26
Treatment of 02 Nos. of Landslide location (48.640 to 48.760 and 53.410 to 53.610)on NH-107(old-109)in the State of Uttarakhand under Annual Plan 2024-2025
Treatment of 01 nos. of landslide location at Ch. 79.850 to 80.300 (Dabarkot) on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2024-25
Short Term Maintenance from 78.00 to Km 100.00 including Protection work (R/wall) on NH-309(Old No. 121)
Protection work of Yamuna Bridge of Span 437.50 M at km. 13-14 on NH 123(507) Under Annual Plan 2025-26 in the state of Uttarakhand under EPC mode
Work of Installation of Crash Barriers from Km 134.00 to Km 143.00 of NH 72B (New N0. 707) in the State of Uttarakhand under Road Safety Annual Plan 2021-22.
Invitation of Bid For Engagement of Placement Agency for providing IT Resources Staff on purely Temporary Basis for NH Divisions of State PWD, Uttarakhand
Construction of Road from NH 507 to Katapather under Cm Announcement (Barwala To Katapaher Canal Service Road)