Loading…
Loading…
592 results • Best match
Short Term Maintenance from 158.00 to Km 164.00 and km 210.00 to Km 218.00 including Protection work (Rwall) on NH-309(Old No. 121)
Construction (Upgradation) of road from NH-09 main road to Khaira Gram Sabha-Duphariya of village Anjaniya under assembly constituency Kichha of block Rudrapur in district U.S Nagar
STRENGTHENING OF EXISTING ROAD AND WIDENING TO INTERMEDIATE LANE CONFIGURATION FROM KM 468.300 (HELONG) TO KM 480.950 (JOSHIMATH) OF NH-58 (NEW NH-07) UNDER PROJECT SHIVALIK BORDER ROAD ORGANIZATION IN THE STATE OF UTTARAKHAND (Length 12.65 KM)
Painting of Electric Poles on Road Side of National Highway
RFP for providing Manpower Services to InvitConcessionaire for collection of User Fee at Bhadarabad FP of Muzaffarnagar to Haridwar section from Km.130.560 to Km. 209.120 of Old NH 58 (New NH334) in Uttar Pradesh and Uttarakhand
Treatment of 04 nos of landslide locations (Ch. 134.315 km to 134.400 km, ch.135.848 km to ch. 135.910 km, ch. 145.390 km to 145.605 km and ch. 168.755 to ch. 168.840 km (Tyuni Mussoorie section) on NH 707A under EPC mode in the State Of Uttarakhand
Shifting and Fixing of 24.00 M. Span Steel Girder Bailey Bridge in Km 220 Ch. 219.400 with Widening of Existing Road in Km. 219.200 To 219.600 and including Widening of Railway Crossing 1 - BRR at Shyampur Near Rishikesh on NH - 58 (New No.-34 ) in T
Improvement of Riding Quality of NH 707 A From Ch 0.00 to 52.180, Ch 61.750 to 70.750, Ch 72.900 to 79.350 and Km 83.000 to 127.000 in the State of Uttrakhand Under annual plan 2021-2022 N.H.(O) in the state of Uttarakhand ( Under EPC mode)
Treatment of 03 nos of landslide locations at Km. 136.000 to Km. 136.030 (Length 30m),ch 138.300 to ch 138.400 (length 100 m) and ch 155.200 to ch 155.230 (30m) on NH 707A under EPC mode in the State of Uttarakhand under Annual Plan 2024-25
Strengthening of damaged road surface from km 147.00 to 157.00 on NH-94(new no. 134) in the state of Uttarakhand on EPC mode under Annual Plan 2019-20
Construction of Damaged Retaining,Breast Wall and box Culvert at Various Location From Km 0.00 to Km 84.00 on NH 107A Under 2026-2027 in the State of Uttarakhand.
Engagement of user fee agency through e-quotation for 6lane access controlled GF highway of Delhi Saharanpur Dehradun Economic Corridor under Bharatmala Pariyojna for Phase-I (NH-709B) from Akshardham to Junction of EPE at Baghpatto Saharanpur Bypass
Development of six- lane access-controlled highway from design chainage 0.000 (Ganespur) to design chainage 8.130 (near Mohand) of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh under Bharatmala pariyojana (Package1) on EPC mode
Consultancy Services for Authority Engineer for Road Safety Improvement of Critical Junctions and Overlay on Muzaffarnagar Haridwar Section of NH-334 from Km 130.360 to Km 208.600 in the State of Uttar Pradesh and Uttarakhand on EPC Mode
Construction of Sub-Structure for Kasliya Bridge in Km. 90 of NH-109 (Old NH-87)
Periodic Renewal work in km. 218.500 to 219.200 and km. 220.00 to 226.200 on NH-58(34) in the State of Uttarakhand
Engagement of user fee collection agency for Labhera fee plaza at km 322.600 for the use of four and more lane section of Sitarganj-Bareilly Section of NH-74( New NH30) in the State of Uttar Pradesh and Uttarakhand
IE services for supervision of Upgradation and 4Laning of Poanta Saheb Ballupur Section of NH72 in Himachal Pradesh and Uttarakhand under NH(O) on HAM Pkg1 n Pkg2 Poanta Saheb Ballupur Chowk Dehradun from Ch 0.000 to Ch 44.800.
Patch repair work NH 707A
Road Safety Improvement of existing four lane section of Dehradun-Lal Tappar-Nepali Farm Section of NH7 (Design Chainage 501.930 to 531.330) and Nepali Farm Motichur Section of NH34 (DC 531.330 to 538.750) on EPC Mode in Uttarakhand under NH(O)
Consultancy Services for AE services for 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km113.535) including widening of the existing 4lane-6lane highway from Km112.880-Km115.320 of the Meerut-Haridwar NH-58 on EPC mode in UP
Development of Six lane access-controlled highway from Design Chainage 8.130 near Mohand to 16.380 Daat kali Tunnel of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh and Uttarakhand under BMP on EPC mode (Package-2).
Engagement of user fee agency through eq for Bhaguwala FP at Km 31.600 of NH74 New NH34 near Village Bhaguwala District Bijnor for the project of 4l of Haridwar Nagina of NH-74 in the state of Uttarakhand n Uttar Pradesh
Widening/Reconstruction of 6.00M span Culverts in km 154 and 162 and Construction of protection work as retaining wall at km. 158 on NH-72B(New No. 707) in the State of Uttarakhand under Annual Plan 2019-20
CS for AE for Supervision of Development of 6 lane access controlled highway of Ganeshpur Dehradun section of NH-72A under BP from Design Chainage 0 (Ganeshpur) to Design Chainage Km 19.785 in up and Uttarakhand on EPC mode under BP (Phase-I)
Project Management Consultancy Services for Construction of 2 Lane Highway Tunnel including Approaches to Bypass Pauri Town on Kotdwar _Satpuli _Pauri_Srinager Road of NH_534 old NH 119 in the State of Uttarakhand
Maintenance and Watch and Ward of 7000 saplings NH-72A in Chutmalpur-Ganeshpur and NH-73 in Roorkee
Improvement of Riding Quality of NH-121(309) from km. 189.00 to 205.00 (Salondhar to Krisal), km. 218.00 to 238.00 (Paithani to Musagali) and km. 243.00 to 263.115 (Pabon to Buakhal) in the State of Uttarakhand under Annual Plan 2021-22
Consultancy Services of Preparation of Detailed Project Report for Widening of existing single - intermediate lane to 2-lane with paved shoulders from Km. 189.00 to 263.115 (Salondhar to Buakhal) on NH-309(Old No. 121) in the State of Uttarakhand
Construction of 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km 112.535) including widening of the existing 4lane highway to 6lane from Km 112.880 to Km 115.680 of the Meerut-Haridwar NH-58 in the state of Uttar Pradesh on EPC
CONSTRUCTION OF OF 4-LANE ROAD IN KM 226.200 TO KM 228.200 ( GEETA NAGAR CHOWK TO CHANDRABHAGA BRIDGE) AND CONSTRUCTION OF BOTH SIDE SHOULDERS BY INTERLOCKING TILES FROM KM 218.200 TO KM 228.200 ON NH 58 IN THE STATE OF UTTARAKHAND on EPC
RECONSTRUCTION /REHABILITATION OF DAMAGED ROAD SURFACE BY WMM/DBM/BC FROM KM 100.00 TO KM 128.00 ON NH-121 (NEW NH-309) IN the State of Uttarakhand.
Protection of Valley at Km 74(2-4) on NH-309B in the state of Uttarakahand Under NH(O)
Engagement of user fee agency on the basis of CB through e-tender at Nagla Plaza at Km 61.500 at 4Laning of Rampur Kathgodam section of NH-87 from km 43.446 to km 93.226 (Package-II) in the State of Uttarakhand under NHDP Phase-III on HAM
SITC of Street Light work at NH 87 (Rampur Kathgodam) Km 69.400 to Km 71.900 (Lalkuan to Halduchaur Haldwani)
3833 240323 Shifting of Garbage from NH
Short Term Maintenance of Selected Stretches on NH-309A Km 93 to Km 206 and NH-87E Km 55.550 to 171.00 Under NH Repair Year 2023-24 in the State of Uttarakhand
Strengthening work from km. 13.00 to km. 24.00 and construction of damaged retaining wall from km. 18.00 to 44.00 with drain improvement of sinking portion in km. 26.00 and Protection of sliding zone at km. 38.00 on NH-123(507) in the State of Uttar
Providing and Fixing of RCC fencing poles and Fixing of Barbed Wire Fencing on RHS/LHS of NH-125 in Sitaraganj to Tanakpur sector at different stretches
Providing of JCB machine for opening communication and removal of running slips and Trees from road surface of NH 309 A from Km 51 to Km 93
Rehabilitation and protection work of Ratmau Bridge at Km. 181 260 of NH 58 New NH 334 over Ratmau River
Short term Maintenance work from Ch. 142.000 to 145.100 on NH-09 (Old NH-125) in the state of Uttarakhand
IRQP work (2021-22) from km 120.00 to 149.000 on NH-87 Ext. (New NH-109) in the State of Uttarkhand
Short Term Maintenance of NH 309 A KM 185.000 to 206.600 Under NH Repair year 2024-25 in State of Uttarakhand
Strengthening work from km 41.00 to 60.00 on NH-123(new no. 507) in the state of Uttarakhand on EPC mode under Annual Plan 2019-20
Consultancy Services for preparation of detailed project report (DPR) for construction of Srinagar bypass from Panch-Peepal to Sweet bridge in 2-lane with paved shoulder on NH-58 in the State of Uttarakhand
Road Protection work in Hill side and Valley side at km. 171 (ch. 170.750 to 170.930) and at km 172 (Ch. 171.700 to 171.900) on NH-707 in the State of Uttarakhand under Road Safety Plan 2023-24 on EPC Mode
Strengthening work from km. 92.00 to km. 106.00 on NH-87 (New NH-109) in the state of Uttrakhand under EPC mode.
DPR services for widening to 2-lane from km 28.00 to km 70.00 Ramnagar to Shankarpur of NH-309 Old NH-121
Strengthening work from Km. 13.00 to km. 26.00 on NH-121 (New NH-309) in the state of Uttrakhand under EPC mode