Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
8 Sept 2022, 3:00 pmClosed
CE-RO, MoRTH Dehradun
CE-RO, MoRTH, Dehradun 46/1 Canal Road Jakhan Dehradun
Project Management Consultancy Services for Construction of 2 Lane Highway Tunnel including Approaches to Bypass Pauri Town on Kotdwar _Satpuli _Pauri_Srinager Road of NH_534 old NH 119 in the State of Uttarakhand
2022_MoRTH_700935_1
RO/UK/PAURI TUNNEL/01
Open Tender
Civil Works - Roads
Item Rate
5475 days
Pauri-Srinagar NH-119
As per RFP
3 documents required · 3 mandatory
₹5,000
As per RFP
Exempted
CE-RO, MoRTH, Dehradun
9 Feb 2023
18 Jul 2022
9 Sept 2022
19 Jul 2022
8 Sept 2022
19 Jul 2022
16 Aug 2022
Amount
A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixing boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total cost net of Goods &service tax**
B. For Phase 3 (Construction Supervision and Maintenance)
Remuneration for Local Professional Staff
Supporting Staff
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment
Reports and Document Printing
Road Survey Equipment
Contingencies
Total Cost net of Goods &Service Tax**
Total for Phase 1,2 &3
Grand Total net of Goods and Service tax (for all 3 phases)
Goods & Service Tax
Grand Total including goods and service tax (for all 3 phases)
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Geophysical Investigation
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring) Rate (INR) Quantity Amount (INR) Amount (INR) in Words
a) Boring in all type of soils (including hard rock)
Sub Total
Note:* Quantities of borings shall be taken from Financial Proposal Form No.V. For financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, Payment shall be made on the actual quantity of boring at rates quoted above by the Consultant, which may be substantially more or less than the estimated quantities. Actual boring requirement would be strictly as per the codal provision.
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a repository for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC: 25, 1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/orconstruction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Description of Work / Item(s)
Amount
Remuneration of Expatriate staff including per diem allowances
Description of Work / Item(s)
Amount
International Airfares (Fixed costs)
Inland Travel in Home Country (Fixed Costs)
Description Lump Sum RATE Trips Amount
Inland Travel in Home Country (Fixed Costs)
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Trips Amount
Other Miscellaneous expenses (like DA, internal travel expenses other incidentals)
Sub Total for Mobilization and Demobilization
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum Senior Tunnel Expert
Resident Engineer cum Excavation Specialist
Senior Geotechnical Engineer
Tunnel Design Expert
Tunnel Safety Expert
Senior Geologist
Senior Contract Specialist
Sub Total
B: Sub Professional Staff Construction Period 36 months+DLP 120months (To be decided by the Authority as per requirement of the Project at the time of preparation of RFP)
Survey Engineer
CAD Expert
Environmental Engineer
Assistant Quality cum Material Engineer
E&M Engineer
Quantity Surveyor
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Accountant cum cashier
Steno cum Computer Operator
Office Boy (1 no)
Description of Work / Item(s)
Amount
Description of Vehicles
Description of Vehicles
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum SeniorTunnel Expert
Tunnel Design Expert
Senior Geophysicist
Senior Geotechnical Engineer
Senior E&M Expert
Senior Geologist
Environmental Specialist
Material Engineer
Highway cum Pavement Engineer
Quantity Surveyor cum Documentation Expert
Senior Survey Engineer
Land Acquisition Expert
Utility Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Staff 7
Sub Total
Description of Work / Item(s)
Amount
professional and sub professional staff trips * Rate quoted includes Hotel charges, travel cost etc.complete
Description of Work / Item(s)
Amount
Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete.
Description of Work / Item(s)
Amount
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment ( Rental ) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2external &10 internal lines), photocopier (15ppm, 12000copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Description of Work / Item(s)
Amount
Monthly reports (Design and Construction)
Half yearly Reports
Various others reports as provided in the EPC Agreement such as Completion Report
Description of Work / Item(s)
Amount
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Road signs inspection using Retro Reflectometer
Description of Work / Item(s)
Amount
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Authority
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The rent cost includes maintenance, Cleaning, repairs, etc.
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
Hexa Co.
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Segmental Consulting and Infrastructure Advisory Pvt Ltd
RITES LIMITED
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Hexa Co.
RITES LIMITED
Hexa Co.
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
RITES LIMITED
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Hexa Co.
RITES LIMITED
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Hexa Co.
RITES LIMITED
Segmental Consulting and Infrastructure Advisory Pvt Ltd
RITES LIMITED
Hexa Co.
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Hexa Co.
Hexa Co.
RITES LIMITED
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Hexa Co.
Segmental Consulting and Infrastructure Advisory Pvt Ltd
RITES LIMITED
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Segmental Consulting and Infrastructure Advisory Pvt Ltd
RITES LIMITED
Hexa Co.
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Hexa Co.
RITES LIMITED
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Hexa Co.
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Hexa Co.
RITES LIMITED
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Hexa Co.
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
RITES LIMITED
Hexa Co.
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
RITES LIMITED
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
RITES LIMITED
Hexa Co.
Segmental Consulting and Infrastructure Advisory Pvt Ltd
RITES LIMITED
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
RITES LIMITED
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
RITES LIMITED
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Hexa Co.
RITES LIMITED
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Hexa Co.
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Hexa Co.
RITES LIMITED
Segmental Consulting and Infrastructure Advisory Pvt Ltd
RITES LIMITED
Hexa Co.
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
RITES LIMITED
Segmental Consulting and Infrastructure Advisory Pvt Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .