Loading…
Loading…
592 results • Best match
CONSTRUCTION OF ROAD MEDIAN FROM Koyal Ghati (Bairraj Road) to Kohali Hospital ( NH 58) AT RISHKESH.ARBORICULTURE /BEAUTIFICATION WORK FOR ROAD MEDIAN FROM Koyal Ghati Bairraj Road to Kohali Hospital NH 58 AT RISHKESH.
Construction of Km 92 of NH-87 to Maluti (Baluti) Motor Road Stege-II
Shotcreting and Fencing work for Protection of NH 9 at Tharkot Lake district Pithoragarh
UT-13-516 MRL 14-NH 108 to Tihar Via Kujjan Motor Road Upgradation
Pit Making and transplanting of 3100 saplings on NH-125 in Sitaraganj to Tanakpur.
Consultancy Services for Detailed Project Report Preparation for rehabilitation and up-gradation to 4- Lane from Km. 0.00 to 28.00( Kashipur to Ramnagar) of NH-121 (New NH-309) in the State of Uttarakhand.
Performance based Maintenance work Contract from Ch 92.880 to Ch 121.550, Ch 128.310 to Ch 135.075 and Ch 143.750 to km 194.800 of NH 09 (Old NH 125) in the State of Uttarakhand.
Emergent Maintenance on Existing Road and Diversion NH87 Pkg II from km. 43.446 to km. 93.226 in the State of Uttarakhand
I.R.Q.P. work from Km. 0.000 to 7.000 and Km 52.000 to Km 68.700 of NH-309A in the state of Uttarakhand under Annual Plan 2021-22 under NH division Lohaghat. for the year 2021-22
Construction of 1.5 lane wide road and box culvert from Km. 6 of NH-74 vill. Kangri via Shyampur-Sajanpur peeli to Km. 12 of NH-74 in Distt. Haridwar under State Sector 2020-21
Construction of Service and Slip road at 07 seven locations under Nagina Kashipur section of NH-74 NEW (NH-734 and 309) in the state of Uttar Pradesh and Uttarakhand on item rate (percentage) basis
Providing and Fixing of RCC fencing poles on NH-74 in Haridwar to Nagina section.
Providing and Fixing of RCC fencing poles on NH-125 in Sitaraganj to Tanakpur sector.
UT0746 Construction of Km 92 of NH-87 to Maluti (Baluti) Motor Road Stege-II
Pit Making and transplanting of 19417 saplings on NH-74 in Haridwar to Nagina section.
Short term maintenance from Km 77 to 93 NH-309A including Protection work(R/W)
UT-01-07 Km 121 of NH-87E (Dyalikhet) to Mangchaura Motor Road Stage-II
Estimate for Reconstruction of damaged Retaining walls and Brest Wall from km. 93.00 to 206.00 on NH-309A and km. 0.00 to 77.00 of NH-309B in the State of Uttarakhand under Emergency Repair 2024-25.
Consultancy Services for Authority Engineer for Supervision of widening to 2-lane with Hard Shoulder configuration of Mana Ch. 0.00 to Mana Pass Ch. 50.987 road on NH-07 under Bharatmala Pariyojana in the state of Uttarakhand on EPC mode
DEVELOPMENT OF A SITE RETAIL OUTLET AT LOCATION BETWEEN KM STONE 140 TO 150 ON NH-125 (NEW NH-09), VILLAGE RAIKOT MAHAR, TALUKA LOHAGHAT, KHASRA NO. 2756, 2757, 2758 DISTRICT CHAMPAWAT UNDER DEHRADUN DO, UPSO-II.
Consultancy services for Detailed Project Report preparation for Rehabilitation and Upgradation to 2-lane from km 28.00 o Km 70.00 (Ramnagar to Shankarpur) of NH-121 (New NH-309) with paved shoulder in the State of Uttarakhand.
Nagar Palika Parishad Bharahat Uttarkashi Me Ward No 03 Me Uttarkashi-Gahanshali-Tilwadha National Highway No 15 Per Kudha Nistarna Kendar Ka Nirman Kariya
Add. Work for Const. of Landslide Protection Gallery, SlopeProtection works including Cattle Fence,Restoration of IrrigationChannel and RiverProtection Work at Bareti,Uttarkashi from Km100.300 to km101.060 of NH-34 on EPC basis in Uttarakhand
Road Safety work from Km 133.00 to 166.00 on NH 309A in the State of Uttarakhand
Construction of car parking at Chhatoli tok near Tilwada along NH-107 block Augustmuni District Rudraprayag
Road Safety work from Km 133.00 to 166.00 on NH 309A in the State of Uttarakhand
Short term maintenance for One time Improvement of Road Quality Work From Km- 25.400 to 51.00 (Near Silkyara Bend to Barkot Tunnel Portal) On NH-134 in the State of Uttarakhand.
Construction of Intermediate Lane, Class-A Loading Steel Girder RCC deck composite Bridge of 24m Span at Km. 90 over Kalsiya river on NH-87 (New NH-109) in the State of Uttarakhand (Under Annual Plan 2020-21).
Rehabilitation and up-gradation to 2-lane configuration of Kanda to Bageshwar Road from km 103.25 to Km 122.72 (Existing Chainage 110 to Km 130) of NH-309A in the State of Uttarakhand (Package-II) under NH(O)
Providing and Fixing of RCC fencing poles and Providing, stretching and fixing of Barbed Wire Fencing in each hook on RHS/LHS of NH-72A in Chutmalpur-Ganeshpur and NH-73 in Roorkee-Chutmalpur-Gagalheri sections at different stretches.
Consultancy Services for Detailed Project Report Preparation for rehabilitation and up-gradation to 2 lane 2 lane with paved shoulder from Km. 89.00 to 123.00 (Kathgodam to Nainital) of NH-87 (New NH-109) in the State of Uttarakhand.
Consultancy Services for Authority Engineer for supervision of Construction of Champawat Bypass 2 lane with paved shoulder km 121.700 to km 129.450 on NH-09 Old NH-125 in the state of Uttarakhand under Chardham works on EPC mode.
Consultancy Services for Detailed Project Report Preparation for rehabilitation and up-gradation to 2 lane 2 lane with paved shoulder from Km. 89.00 to 123.00 (Kathgodam to Nainital) of NH-87 New NH-109 in the State of Uttarakhand.
Rehabilitation and up-gradation to 2-lane configuration of Udiyari Bend to Kanda road from km 73.66 to Km 103.25 (Existing Chainage 80 to Km 110) of NH-309A in the State of Uttarakhand (Package-I) under NH(O)
Construction of Road and drain from NH-74 to Electronic weigh bridge at New Mandi Yard, Gadarpur
Consultancy Services for four Lanning of NH 123(507) from Herbertpur to Kalsi (Ch. 0.00 to 16.00).
Road Safety work from Km 47.00 to Km 77.00 on NH 309B in the State of Uttarakhand
Arboriculture/Beautification work of Kirsi mandi to Syampur fatak road median,Haridwar road(NH-58) at Rishikesh
Widening of existing Culvert and Construction of new culvert on NH-09(Old NH-125) from Km- 121.700 to 129.450 (Champawat Aabadi Portion), Km 136.320 to km 142.00 (Lohaghat Aabadi Portion), Km 197.150 to km 202.00 (Pithoragarh Aabadi Portion), in the
TREATMENT OF 01 NOS LAND SLIDE ZONE KM 475.360 TOKM 475.625 FROM JOSHIMATH TO MANA ON NH 07 IN THE STATE OF UTTARAKHAND UNDER EPC MODE IN NH ANNUAL PLAN 2024 25 NOS OF LAND SLIDE LOCATIONS 01 NOS Retendering
DEVELOPMENT OF NEW A SITE RO AT ON DEHRADUN HERBATPUR ROAD NH 72 NEW NH 07 IN KM STONE NO 121 AT KHASRA NO 95 96 KA 97 KA VILLAGE LAKHANWALA NEVAT TEHSIL VIKAS NAGAR DIST DEHRADUN UTTARAKHAND UPSO II
Strengthening work from Km. 121.700 to Km 129.450 (Champawat Aabadi portion), Km136.320 to km.142.00 (Lohaghat Aabadi Portion) and km.197.150 to km. 202.00 (Pithoragarh Aabadi Portion) on NH-125 (new NH-09) in the state of Uttarakhand under EPC mode
Limited RFP for providing Manpower Services to Invit-Concessionaire for collection of User Fee at Bhadarabad Fee Plaza of Muzaffarnagar to Haridwar section from Km.130.560 to Km.209.120 of Old NH 58 (New NH-334) in Uttar Pradesh and Uttarakhand
Rehabilitation and up-gradation to 2-lane configuration of Kangarchina to Almora road from km 161.600 to Km 196.670 Existing Chainage 169.00 to Km 206.00 of NH-309A in the State of Uttarakhand Package-V under NH(O) on EPC Mode.
Custom Bid for Services - HIRING OF CONSTRUCTION SUPERVISION ENGINEER FOR LAYING OF STEEL PIPE FROM CGS ROORKEE TO IIT ROORKEE IN HARIDWAR GA Similar Category Hiring of Third-Party Inspection Agency Manpower Outsourcing Services - Man-days based ... for NHAI
Consultancy services of Authority Engineer for four laning of Haridwar Nagina section of NH 74 including EUP mitigation measures
Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones from Ch. 433.00 to Ch. 450.00 (17 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-II)
UT-13-505 MRL 08-NH 108 To Saura Sari Motor Road Upgradation(Bituminous Concrete with waste Plastic)
Rehabilitation and up-gradation to 4-lane configuration of Kashipur to Ramnagar road from km 5.735 to km 24.00 of NH-121 (km 64.735 to km 83 New NH-309 18.265 km on EPC Mode in state of Uttarakhand.
Consultancy Services for preparation of Detailed Project Report for Construction of 2-lane Tunnel between Sonprayag NH-107 and Kalimath (SH-96) including approach road up to Chunni Bend on NH-107A Total length23 km including 7 km of Tunnel in the St