Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAccepted-Finance | ₹4.9 Cr | L1 | Accepted-Finance Responsive |
| 2 | L2₹7.9 Cr+₹3.0 Cr (61.6%)Accepted-Finance | ₹7.9 Cr+₹3.0 Cr (61.6%) | L2 | Accepted-Finance Responsive |
| 3 | L3₹8.5 Cr+₹3.6 Cr (73.4%)Accepted-Finance | ₹8.5 Cr+₹3.6 Cr (73.4%) | L3 | Accepted-Finance Responsive |
| 4 | L4₹9.8 Cr+₹4.9 Cr (99.7%)Accepted-Finance | ₹9.8 Cr+₹4.9 Cr (99.7%) | L4 | Accepted-Finance Responsive |
| 5 | L5₹9.8 Cr+₹4.9 Cr (100.4%)Accepted-Finance | ₹9.8 Cr+₹4.9 Cr (100.4%) | L5 | Accepted-Finance Responsive |
Tender Value
Refer Docs
Closing Date
14 Nov 2023, 5:00 pmClosed
CE-RO, MoRTH, Dehradun
Chief Engineer-Regional Officer, MoRTH 1st Floor, The Institution of Engineers (India) Buidling, Near ISBT, Sharanpur, Road, Dehradun 248001
Consultancy Services for Authority Engineer for Supervision of widening to 2-lane with Hard Shoulder configuration of Mana Ch. 0.00 to Mana Pass Ch. 50.987 road on NH-07 under Bharatmala Pariyojana in the state of Uttarakhand on EPC mode
2023_MoRTH_770401_1
NH-07/AP/UK/2022-23/626/AE
Open Tender
Civil Works - Roads
EPC Contract
3240 days
Mana-Manapass NH-07 in the State of Uttarakhand
As per RFP
3 documents required · 3 mandatory
₹5,000
As per RFP
Exempted
O/o CE-RO, MoRTH, Dehradun
29 Jun 2024
6 Sept 2023
15 Nov 2023
8 Sept 2023
14 Nov 2023
8 Sept 2023
3 Oct 2023
Amount
Key Personnel
Team Leader Cum Senior Highway Engineer (1No)
Resident cum Highway Engineer (1 No)
Bridge/Structural Engineer (1 No)
Senior Pavement Specialist (1No)
Senior Quality cum Material Expert (1 No)
Road Safety Expert (1 No)
Sub Professional Staff
Survey Engineer (1 No)
Assistant Highway Engineer (02 nos)
CAD Expert (1 No)
Environmental Engineer(1 No)
Assistant Bridge Engineer (01 nos)
Assistant Quality cum Material Engineer (02 nos)
Quantity Surveyor(1 No)
Support Staff
Office Manager (1 No)
Accountant cum cashier (1 No)
Steno cum Computer Operator (1 No)
Office Boy (1 Nos)
Duty Travel to Site (Fixed Costs)
Site to CE-RO, MoRTH, Office for Key Professionals
Site to BRO Shivalik for Key Professionals
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc. Office Rent (Fixed Costs) Minimum 200 sqm area of office shall be rented during construction period and 100 sqm area during maintenance period. The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.
During Construction Period
During Maintenance Period
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment)
The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required) etc.
Reports and Document Printing
Monthly Reports (Design and Construction)
Quarterly Reports
Various other reports as provided in the EPC Agreement such as Completion Report
Survey and Investigation A. Topographical Survey (Fixed Rate)
Surface defects detection and roughness measurement using Network Survey Vehicle (50.987 Kms)
Pavement strength measurement using FWD (50.987 Kms)
Bridge inspection using Mobile Bridge Inspection Unit (50.987 Kms)
Road signs inspection using Retro Reflectometer (50.987 Kms)
Contingency (A fixed amount of Indian Rupees ONE MILLION shall be include dinthe Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority inMinistry of Road Transport & Highways(MoRT&H))
AICONS Engineering Pvt. Ltd.
Marc Technocrats Private Limited
G-Eng Advisory Services Pvt. Ltd.
PIONEER INRA CONSULTANTS PVT. LTD.
MSV INTERNATIONAL INC
Technocrats Advisory Services Pvt. Ltd.
Theme Engineering Services Pvt Ltd
Lion Engineering Consultants Private Limited
SA Infrastructure Consutants Pvt. Ltd.
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .