Loading…
Loading…
592 results • Best match
Construction of 40.00m span steel plate girder Bridge over Amlawa river at km 18, 40.00m spansteel plate girder Bridge over sadana Khad at km 30, 30.00m Span steel plate girder Bridge over Byasi Gaad at km 28 and 30.00m span steel plate gider Bridge
Providing and fixing of Thrie metal beam crash barrier in km.16.00 to km.44.00 on N.H.123(507) in the state of Uttarakhand
Improvement of accident prone locations in Vikas Nagar Market in km. 3.20 to km. 5.20 and maintenance of shoulder for safety of vechicles between km. 2.20 to km. 9.10 and improvement of junctions at Lehman Hospital road in km. 2.00, km. 9.00 and km
Landslide treatment work of 08 locations (ch. 238.750 km to 238.920 km, ch. 246.790 km to 246.850 km, ch. 247.340 km to 247.440 km, ch. 254.340 km to 254.410 km, ch. 261.550 km to 261.680 km, ch. 281.600 to ch. 281.925 km, ch. 283.250 km to 283.500 k
DEVELOPMENT OF A SITE RETAIL OUTLET AT LOCATION BETWEEN KM STONE NO 12 AND 40 ON NH-309 B DISTRICT ALMORA UNDER DEHRADUN DO, UPSO-II
Under Deposit work in Distt. Udhamsingh Nagar Construction of Service Road and Remaining work of NH-74 (Kashipur Sitarganj section) from Railway Station to Gaba Chowk.
Construction of 150 M. Span PSC Box Bridge over Dhangadi Nala Ramnagar to Buwakhal Motor Road Near Km stone No. 46 NH-309 Ramnagar, Distt Nainital
Road Widening work on Left and Right side from DD Chauk to Indira Chauk in NH-87 Under the Internal Raod ofRudrapur City (Under Deposit work)
Strengthening of Motor Road Satpuli Kandakhal Sisildi (Service Road to NH 534 and SH 51 (Length 32 KM) under Chaubatakhal/Lansdowne Constituency Assembly Area Pauri Garhwal
Maintenance work of existing project highway of Haridwar-Nagina, Section of NH-74, Km.0.000 to Km.73.000 in the State of Uttar Pradesh and Uttarakhand
Widening and surface improvement through asphalt on the motor road extending from NH 09 to DPS in Kichha Constituency Distt. Udham Singh Nagar under District Sector.
Shifting and Relaying of water supply pipe line and reconstruction of damaged works on NH 94 between Agrakhal to Khadi Block Narendra Nagar in District Tehri Garhwal
Construction of bridge on Solani river at km 9 chainage 8.10 from Roorkee to Reliance Petrol Pump Mangalore to Core College Road (Old NH-58) Under C.R.I.F.
Treatment of landslide zone from location no. 29 to 37 (km 157.890 to km 167.503) on NH-125(09) in the state of Uttarakhand under EPC mode
PERIODIC RENEWAL OF ROAD FROM KM 8.00 TO 52.00 OF NH309A UNDER NH DIVISION LOHAGHAT IN THE STATE OF UTTARAKHAND UNDER ARP 2022-23 under EPC Mode
Short Term Maintenance Contract (STMC) work for selected Stretch of NH 309A from Km 77.00 to 93.00 , in the State of Uttarakhand for the year 2025-26
Repair and Maintenance work at Pullbhatta Existing road portion of NH-74 in 1.277 Km length from ch 229.400 to Pulbhatta police Chauki to Ch 230-400
Construction of four laning of 2.25 km Missing link between NH-74 km 229.30 to SH-37 km 57.50 from Pulbhatta bridge to UP border under CRF.
Treatment of landslide zone from location no. 01 to 28 (km 62.860 to km 152.750) on NH-125(09) in the state of Uttarakhand under EPC mode
Stabilisation of land slide and slope protection work at Govindghat
Periodic renewal work of NH-121 (New-309) from Km.3.000 to Km. 13.000 and Km 27, 28 under Annual Plan 2022-23 in the state of Uttarakhand
Maintenance work of NH 731K (Majhola to Khatima) km 1.00 to 13.20 in Short Term Maintenance Contract under annual Plan Year 2024-25 in the State of Uttarakhand
Widening and Improvement and work from Km 73 of NH 109 to New Collectorate Almora and Medical College Almora Motar Road via Vikash Bhawan of Constituency District Almora
Improvement work by PC NH 309 Chilkiya Link Road to Village Nandpur via Bedajhal Main Road to Naya Jhirna Motor Road at Ramnagar Block Constituency Ramnagar District Nainital
Re alignment and height extension of 132 KV Chilla Nazibabad line at location no 33 and 34 for 4 laining strengthening work of NH 74 Haridwar Nagina section
Construction work of CC road from Lakhuudiar Road Painting to Lakhuudiar adjacent to NH 309 B in village Digoli of village Bhausiyachana of development block under Almora district.
Construction of 75 m span Steel truss bridge Kathgodam to Ranibagh NH 87 (109) Under Honble Chief Minister Announcement No-550/2019 in Bhimtal Assembly Constituency Distt Nainital
Shifting or Repair of Pipeline in Various Street of Munikereti Tapowan NH 58 under Munikireti and Tapowan Water Supply Scheme and related works complete under Water Works Rishikesh
STRENGTHENING WORK FROM KM 10.000 TO 25.000 AND KM 48.000 TO 77.100 OF NH-309 B UNDER ANNUAL PLAN 2020-2021 ON EPC MODE IN THE STATE OF UTTARAKHAND.
Construction of alteranate connectivity for Quarab land slide location at Km.55 on NH- 87 E 18mt Bailey bridge at Chainage 1.575 and 60mt Bailey bridge at Chainage 2.750
Under State Sector Construction and Improvement work of Motor Road from NH 09 Chutki to Panchakki road by Hot-Mix in Kichha Assembly Constituency of Udham Singh Nagar District.
Construction work of Helipad near Ramtal garden resort above Birmau Kandi at km 90 of NH 707 A (Tiuni Chakrata Mussoorie Chamba Kritinagar) under Chakrata constituency of district Dehradun.
Replacement of Damaged 11 KV Under Ground Cable an Construction of overhead 11 kv line at National Highway crossings at various sites under EDD, Jaspur Section 33/11 KV Garhinegi EDSD (Second) Jaspur (U.S.Nagar) under the Head of OM for the year of
Construction of 4-Lane ROB and its approaches in lieu of existing Level Crossing No. 43-B at Km. 2.400 on NH-121 (New 309) in the State of Uttarakhand
Construction of 4 Lane ROB and its approaches in lieu of existing Level Crossing No. 43-B at Km. 2.400 on NH-121 (New 309) in the State of Uttarakhand
Routine Maintenance Incident Management work of Muzaffarnagar to Haridwar Section of NH 58 from Km 166.000 Roorkee Bypass Start to Km 208.620 Haridwar in the State of Uttar Pradesh Uttarakhand
Reconstruction of Tile road from Sitarganj market Main Chauraha to Nahar Puliya to Shamshan Ghat and Fron KM 1 of NH 125 to Old Mandi in Sitarganj Under State Sector
Construction of Damaged Retaining , Breast wall and cross drainage work from ch 349.800 to 355.495 , Kaliyasaur to Khankra of NH-07 under FDR 2026-27 in the state of Uttarakhand .
Reconstruction of damage road surface due to laying of sewer pipe line by the Uttrakhand Urban State Develepment Authority (uusda) on NH 87 New 109) from km 116.00 to 121.00
Stabilization of land slide and slope protection between Km 28.60 to Km 142.00 on Rishikesh-Dharasu road on NH-34 state Uttarakhand on EPC Mode No of Slide locations 12 Nos
Widening to 2-lane from existing chainage km. 74.700 to km. 100.660 Design chainage km 53.365 to km 78.785 on NH-507 in the State of Uttarakhand.
Improvement and Upgradation of NH734 section of Moradabad Thakurdwara Kashipur including Moradabad and Kashipur bypasses on EPCbasis in UP and Uttarakhand PackageII Moradabad Thakurdwara(Length39.750 km) Start from Ch0.00(Existing Km389.00 at Bijna)
Engagement of user fee agency through ETender at Lacchiwala FP for 4 Laning of Haridwar-Dehradun Section in Uttarakhand
Engagement of user fee agency through e-quotation for Six lane access controlled Greenfield highway of Delhi-Saharanpur-Dehradun Economic Corridor under Bharatmala Pariyojna for Phase-I from Akshardham to Junction of EPE at Baghpat
CS for AE for Supervision of Development of 6 lane access control GF highway of Delhi-Saharanpur-Dehradun under BP from Junction of EPE Vill-Mavikalan Design Chainage 0 to 56.500 Vill-Karaunda Mahajan in UP on EPC Mode under BP Phase-I PKG-I
Independent Engineer services for supervision of Rudrapur Bypass from Design Km 00.000 to Design Km 20.640 in the State of Uttarakhand on Hybrid Annuity mode
Development of of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under BP from Design Chainage 56.500 (Vill-Karaunda Mahajan) to Design Chainage 82.000 (Vill-Khyawari) in UP on EPC Mode (PKG-III).
Engagement of user fee collection agency on the basis of CB for Labhera fee plaza in the State of Uttar Pradesh and Uttarakhand and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Consultants for Carrying out Feasibility Study and Preparation of Detailed Project Report for development of Ropeway Projects in Uttarakhand.
CS for AE for Supervision of Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun under BP from Design Chainage 56.500 Vill-Karaunda Mahajan to 119.790 Vill-Latifpur at Saharanpur Bypass in UP on EPC Mode Package-II