| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Rejected-Technical | - | - | Rejected-Technical DisQualified in Technical evaluation |
| 4 | Not Admitted-Fee/PreQual/Technical ROOMPUR | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | m/s kumar infratech L1 |
|---|---|---|---|---|
| 1.00 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means Bituminous course | 232 | Cum | - |
| 2.00 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 1,032 | Cum | - |
| 3.00 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on a well prepared sub-base and compacting with vibrating roller to achieve the desired density.(406 of MoRT&H specification). | 2,057 | Cum | - |
| 4.00 | Prime coat
(Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.) | 8,226 | Sqm | - |
| 5.00 | Tack coat
Tack coat using VG-10 grade bitumen Over dry and hungry bituminous surfaces @ 0.40 kg/sqm | 29,011 | Sqm | - |
| 6.00 | Bituminous Macadam
(Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction) for GradingII(19 mm nominal size) | 135 | Cum | - |
| 7.00 | Dense Graded Bituminous Macadam
(Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) for GradingII(19 mm nominal size) | 1,987 | Cum | - |
| 8.00 | Bituminous Concrete
(Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) for Grading-II (bituminous binder @ 5.4 % of mix) | 526 | Cum | - |
| 9.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
(Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.) | 477 | Sqm | - |
Tender Value
₹2.5 Cr
EMD Value
₹5.1 L
Closing Date
23 Sept 2020, 3:00 pmClosed
Superintending Engineer
office of Superintending Engineer 4th Circle P.W.D. Rudrapur (U.S. Nagar)
Repair and Maintenance work at Pullbhatta Existing road portion of NH-74 in 1.277 Km length from ch 229.400 to Pulbhatta police Chauki to Ch 230-400
2020_pwd_26057_1
2071/23M-04/2020 Date 02.09.2020
Open Tender
Civil Works - Roads
Item Rate
270 days
kichha
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer P. D. P.W.D. Rudrapur
₹5.1 L
Rudrapur
7 Nov 2020
9 Sept 2020
23 Sept 2020
9 Sept 2020
23 Sept 2020
14 Sept 2020
14 Sept 2020
Amount
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means Bituminous course
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on a well prepared sub-base and compacting with vibrating roller to achieve the desired density.(406 of MoRT&H specification).
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
Tack coat Tack coat using VG-10 grade bitumen Over dry and hungry bituminous surfaces @ 0.40 kg/sqm
Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction) for GradingII(19 mm nominal size)
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) for GradingII(19 mm nominal size)
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) for Grading-II (bituminous binder @ 5.4 % of mix)
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 3.10 MB
BOQ_30823.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .