Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.0 LAccepted-AOC | ₹42.0 L | L1 | Accepted-AOC TENDER AWARDED TO SHRI JAY RAJ KHANKA AOC |
| 2 | L2₹51.6 L+₹9.6 L (22.8%)Rejected-Finance | ₹51.6 L+₹9.6 L (22.8%) | L2 | Rejected-Finance SECOND LOWEST |
| 3 | L3₹56.2 L+₹14.1 L (33.6%)Rejected-Finance VILLAGE KAIRWAN KARANPUR PO RAJPUR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹56.2 L+₹14.1 L (33.6%) | L3 | Rejected-Finance THIRD LOWEST |
Tender Value
₹68 L
EMD Value
₹1.4 L
Closing Date
9 Apr 2018, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer Construction Division Uttarakhand Peyjal Nigam Muni Ki Reti
Shifting and Relaying of water supply pipe line and reconstruction of damaged works on NH 94 between Agrakhal to Khadi Block Narendra Nagar in District Tehri Garhwal
2018_MDPEY_9345_1
LetterNo 700/250/05 Dated 24.03.2018
Open Tender
Civil Works
Item Rate
365 days
Narendra Nagar in District Tehri Garhwal
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
Executive Engineer CD UKPJN
₹1.4 L
15 Jul 2025
28 Mar 2018
11 Apr 2018
29 Mar 2018
9 Apr 2018
29 Mar 2018
Amount
Excavation of earth for Pipe Line trenches of Distribution Networks in following strata requiring the use of any special T&P or by Chiselling or by crow bars with a lift up to 1.5 m and lead upto 30 m including refilling, watering and ramming of excavated earth into the trenches in layers, removal and disposal of surplus earth upto a distance of 60 m from the trenches including supply of all materials, labour, T&P etc. complete.
Soil mixed with Bajri, Boulders and Shingle, etc
Medium Rock by chiselling
Dismantling of following dia pipes, Laying, Jointing, Fixing and Testing of following MS ERW Pipes with specials and Fitting in Trenches under ground including cutting Laying and Jointing by welding etc. Complete, along true to their alignment including lowering in trenches as per IS specification and acessories confirmating to latest IS codes, testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.(Note:-This item shall be paid with the condition that the recovered pipe from dismantling is resuable.)
MS ERW PIPE 250 mm Dia 8.7 mm Thickness.
Dismantling of following dia of pipes and specials upto site, laying & jointing of pipes true to their alignment including lowering in trenches as per IS specification.Providing following size of G.I. (Medium) pipe confirming to IS 1239 Part I : 2004 or its latest amendement including specials and acessories confirmating to latest IS codes and as per instruction of engineer in charge, testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.
G.I. (Med) 20 mm Ф
G.I. (Med) 25 mm Ф
G.I. (Med) 32 mm Ф
G.I. (Med) 40 mm Ф
G.I. (Med) 50 mm Ф
G.I. (Med) 65 mm Ф
G.I. (Med) 80 mm Ф
For Temporary alignment following dia pipes,Supply, Laying, Jointing, Fixing and Testing of following MS ERW Pipes with specials and Fitting in Trenches under ground including cutting Laying and Jointing by welding etc. Complete, along true to their alignment including lowering in trenches as per IS specification and acessories confirmating to latest IS codes, testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.(Note:-This item shall be paid with the condition that the recovered pipe from dismantling is resuable.)
MS ERW PIPE 250 mm Dia 8.7 mm Thickness.
For Temporary Alignment Supply of following dia of pipes and specials upto site, laying & jointing of pipes true to their alignment including lowering in trenches as per IS specification.Providing following size of G.I. (Medium) pipe confirming to IS 1239 Part I : 2004 or its latest amendement including specials and acessories confirmating to latest IS codes and as per instruction of engineer in charge, testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.
G.I. (Med) 20 mm Ф
G.I. (Med) 25 mm Ф
G.I. (Med) 32 mm Ф
G.I. (Med) 40 mm Ф
G.I. (Med) 50 mm Ф(with welding)
G.I. (Med) 65 mm Ф(with welding)
G.I. (Med) 80 mm Ф(with welding)
For Additional length due to change in alignment ,Supply, Laying, Jointing, Fixing and Testing of following MS ERW Pipes with specials and Fitting in Trenches under ground including cutting Laying and Jointing by welding etc. Complete, along true to their alignment including lowering in trenches as per IS specification and acessories confirmating to latest IS codes, testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.(Note:-This item shall be paid with the condition that the recovered pipe from dismantling is resuable.)
MS ERW PIPE 250 mm Dia 8.7 mm Thickness.
For Additional length due to change in Alignment Supply of following dia of pipes and specials upto site, laying & jointing of pipes true to their alignment including lowering in trenches as per IS specification.Providing following size of G.I. (Medium) pipe confirming to IS 1239 Part I : 2004 or its latest amendement including specials and acessories confirmating to latest IS codes and as per instruction of engineer in charge, testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.
G.I. (Med) 20 mm Ф
G.I. (Med) 25 mm Ф
G.I. (Med) 32 mm Ф
G.I. (Med) 40 mm Ф
G.I. (Med) 50 mm Ф(with welding)
G.I. (Med) 65 mm Ф(with welding)
G.I. (Med) 80 mm Ф(with welding)
Dismantling for Shifting to Final Alignment of following dia and specials,fittings taking out of dismantled pipes and specials from trenches and staking them properlywithin 50m but excluding the cost of earthwork including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.(Note:-This item shall be paid with the condition that the recovered pipe from dismantling is resuable.)
MS ERW PIPE 250 mm Dia 8.7 mm Thickness.
Dismantling for Shifting to Final Alignment of following dia and specials,fittings taking out of dismantled pipes and specials from trenches and staking them properlywithin 50m but excluding the cost of earthwork including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.(Note:-This item shall be paid with the condition that the recovered pipe from dismantling is resuable.)
G.I. (Med) 20 mm Ф
G.I. (Med) 25 mm Ф
G.I. (Med) 32 mm Ф
G.I. (Med) 40 mm Ф
G.I. (Med) 50 mm Ф
G.I. (Med) 65 mm Ф
G.I. (Med) 80 mm Ф
For Final Alignment after complete strengtening & widening of NH-94 following dia pipes,Supply, Laying, Jointing, Fixing and Testing of following MS ERW Pipes with specials and Fitting in Trenches under ground including cutting Laying and Jointing by welding etc. Complete, along true to their alignment including lowering in trenches as per IS specification and acessories confirmating to latest IS codes, testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.
MS ERW PIPE 250 mm Dia 8.7 mm Thickness.
For Temporary Alignment Supply of following dia of pipes and specials upto site, laying & jointing of pipes true to their alignment including lowering in trenches as per IS specification.Providing following size of G.I. (Medium) pipe confirming to IS 1239 Part I : 2004 or its latest amendement including specials and acessories confirmating to latest IS codes and as per instruction of engineer in charge, testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete as per instruction of engineer in charge.
G.I. (Med) 20 mm Ф
G.I. (Med) 25 mm Ф
G.I. (Med) 32 mm Ф
G.I. (Med) 40 mm Ф
G.I. (Med) 50 mm Ф(with welding)
G.I. (Med) 65 mm Ф(with welding)
G.I. (Med) 80 mm Ф(with welding)
Providing and carting of materials and laying RCC of 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing as per IS specification including the cost of centering and shuttering
Providing and carting of materials and laying R.R. Stone Masonry laid in 1:6 Cement and local sand mortor and curing in protection works including supply of all labour, material T&P etc complete.
Providing and carting of materials and laying R.R.Dry Stone Masonry in protection works including supply of all labour, material T&P etc complete.as per IS specification
M/s M.C Gupta
SAKLA NAND LAKHERA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .