Loading…
Loading…
592 results • Best match
Supply, Installation, Testing and Commissioning of 33 kV Breaker control and relay panels for Dhauliganga Power Station.
Consultancy Services for Detailed Project Report Preparation for rehabilitation and up-gradation to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 80.00 Ghat to Berinag of NH-309A in the State of Uttarakhand
Work of giving uninterrupted supply to various industries located at Deoband and Jhabrera Road by jointing it with Martin Feeder at NH Delhi Road under 33/11 KV Sub Station Manglore under EDD Rural under EDC Roorkee
Consultancy Services for preparation of DPR for upgradation of single lane to 2-lane and tunneling of existing alignment- realignment from Chainage 68.600 to 75.00 of NH-107 Sitapur- Sonprayag Gaurikund Section in the State of Uttarakhand.
Treatment of Land Slide and Sinking Zone from Chainage 55.400 to 55.580 km. near kwarab Bridge, NH-109 Jyolikot Khairna Almora Karnaprayag Road Under EPC Mode (as per DPR submitted by THDC Uttarakhand in Annual Plan 2024-25
Emergency Maintenance Work Including Slip Clearance for road NH 94 km 188 karadi to Nagardgaon, Chakra Gaon Barkot to kanseru, Semalsari to Gair AND Nagardgaon to khursil during Monsoon Period of Year 2022-23 PIU-Barkot -3rd CALL
Development of A Site Retail Outlet at Location New Bus Station and Workshop Khatima Old NH-09,UTC, Khasra No. 40, 41-2, 53-2 MI, Village Kumraha, Tehsil Khatima, Dist Udhamsingh Nagar under Dehradun DO, UPSO-II
Undertaking the work for maintenance, strengthening and improvement of existing 2 lane project highway Haridwar Nagina section of NH74 from Km 0.000 to Km 73.000 in the State of Uttar Pradeshand Uttarakhand.
Strengthening and improvement of road from km 165.00 to 168.00, Km 170.00 to km 171.00, Protection work from km 161.50 to km 165.00 and reconstruction of culverts from km 165.00 to km 173.00 on NH-707A (Tyuni-Chakrata-Mussoorie-Dhanolty-New Tehri) in
Development of A Site Retail Outlet at Location within 3 KM from NH-334 and Manglaur Jhabrera Road Intersection at Manglaur Towards Jhabrera, Khasra No 400, 401 Village Gadar Judda, Tehsil Roorkee District Haridwar under Dehradun DO, UPSO-II.
E-Tender for Laying/Pulling PLB pipe/ Duct by Open Trench Method/Trenchless Technology and PLB duct pulling/blowing in 300mm dia NHAI and Associated works for Chiniyalisaur- Uttarkashi AWRP OFC route
Consultancy Services for Authority Engineer for Supervision of REHABITATION AND UP-GRADATION TO 2-LANE CONFIGURATION OF BAGESHWAR TO KANGARCHINA ROAD FROM KM 129.600 TO KM 161.600 EXISTING CHAINAGE 136.00 TO KM 169.00 OF NH 309A IN THE STATE OF UK
DEVELOPMENT OF NEW A SITE RO AT LOCATION BETWEEN OLD KM STONE NO. 162 AND 171 ON NH-09 ON RHS FROM MORADABAD TOWARDS RAMPUR, KHASRA NO. 40 MI, 41, VILLAGE JAGATPUR RAMRAI MU DISTRICT MORADABAD, UNDER MORADABAD DO, UPSO-II.
Consultancy Services for Preparation of DPR for Construction of 150 m span two lane class 70R loading RCC Bridge work from Village Halwaheri towards NH-58 over Ratmau River of Piran Kaliyar Constituency of Haridwar district Under State Sector 23-24.
Renewal work by micro surfacing in (1) Bhogpur-Lalatappad Road up to NH-72 (2) Doiwala-Khatta Road (3) Road from Jakhan Causeway to Shrikant house (4) Road from Jolly Grant to Kaluwala Badowala School________________under Annual Repair Year 2024-25
TREATMENT OF 04 NOS OF LANDSLIDE LOCATION AT KM 100.125 to100.570 BARETHI -OPEN TUNNEL KM. 102.960 KM.103.100 POKHU DEVTA MATLI KM.109.885 KM. 110.037 JASKOT VILLAGE and KM 127.560 KM 127.760 GOJMER VILLAGE ON NH-34 ON GANGOTRI RISHIKESH
Improvement work by Tiles on internal public roads Lane No 2 to 12 Main Road Lane No 10A and Lane No 12 in Ward No 60 Gaujajali with in the Lalkuan Assembly constituency of District Nainital Under the State Plan
STABILIZATION OF LANDSLIDE AND SLOPE PROTECTION AT KM 474.710 TO KM 474.850 and KM 475.565 TO KM 475.625 ON RISHIKESH JOSHIMATH - MANA ROAD NH-07 ON EPC MODE IN THE STATE OF UTTARAKHAND. (NOS OF LAND SLIDE 02 NOS ON ENGINEERING,
Widening to Two lanes with earthen shoulder and Geometric improvement from Km 45.00 to 55.560 (Kakrighat to Quarab) of NH-87 Extn.(New NH-109) under Annual Plan2018-19 improvement from Km 45.00 to 55.560 (Kakrighat to Quarab) of NH-87 Extn.(N
CS for Preparation of DPR and providing services for pre-construction activities in respect of Rehabilitation and Resettlement of sinking zones and sliding zones and construction of tunnel at Pagal Nallah location in the state of Uttarakhand
Rehabilitation and up gradation of existing rd bet Km 95.287 to Km 100.300 design chainage Km 81.800 to Km 87.000 single lane to double lane with paved shoulder specification on Gangotri Uttarkashi Dharasu rd NH 34 on EPC mode in the State
Consultancy Services for Authority Engineer for supervision of Rehabilitation and up-gradation to 2-lane configuration of Kanda to Bageshwar road from Km 103.25 to Km 122.72 Existing Km 110 to Km 130 of NH-309A in the State of Uttarakhand Package-II.
PROVIDING LAYING 30MM BC 75MM COMPACTED DBM APPLICATION OF TACK COAT ROAD MARKING PROVIDING AND FIXING CAT EYES DELINEATORS AND BERM FILLING FROM KM 12 TO KM 42PT300 ON BHAIRONGHATI SONAM RD NH 134A IN 72 RCC 36 TF PROJECT SHIVALIK IN UTTARAKHAND
All in One PC (V2) (Q2), Multifunction Machine MFM (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2)
Office Chair (V3) (Q2), Sofas (V2) (Q3), Dressing Table (Q3)
E-Tender for Laying/Pulling PLB pipe/ Duct by Open Trench Method/Trenchless Technology and PLB duct pulling/blowing in 300mm dia NHAI Telecom Utility duct, and Associated works for Chamba-Chiniyalisaur AWRP OFC route
Construction of underground drain from NH to Gurudwara at Bheemawala road
Consultancy Services for Identification and Preparation of Detailed Project Report for Slope Protection work on Hill and Valley Side, Sinking Zones and Bridges in Uttarakhand
E-Tender for Laying/Pulling PLB pipe/ Duct by Open Trench Method/Trenchless Technology and PLB duct pulling/blowing in 300mm dia NHAI Telecom Utility duct, OFC Pulling/Blowing, splicing works and Associated works for Tanakpur-Champawat
E-Tender for Laying Pulling PLB pipe Duct by Open Trench Method Trenchless Technology and PLB duct pulling blowing in 300mm dia NHAI Telecom Utility duct OFC Pulling Blowing, splicing works and Associated works for Rishikesh Srinagar
Providing, Laying and Compaction of BC 40 mm th, correction work with DBM 75 mm th, road Marking, Cat Eye and Delineator for resurf work bet Km 13.3 to Km 18.02 on road Rishikesh-Dharasu (New NH-34) in 1442 BCC under Project Shivalik in Uttarakhand
Construction of Box Culvert in km 134 HM (8-10) (Tunera Gadhera) and Protection work along with Saryu River in Km 134 HM (8-10) and Km 135 HM (0-2 to 4-6) of NH 309A under Annual Plan 2025-26 in the State of Uttarakhand
E-Tender for Laying/Pulling PLB pipe/ Duct by Open Trench Method/Trenchless Technology and PLB duct pulling/blowing in 300mm dia NHAI Telecom Utility duct, OFC Cable Pulling/Blowing, splicing works and Associated works for Champawat-Pithoragarh
E-Tender for Laying/Pulling PLB pipe/ Duct by Open Trench Method/Trenchless Technology and PLB duct pulling/blowing in 300mm dia NHAI Telecom Utility duct, Optical Fibre Cable Pullingand Associated works for Karanprayag - Chamoli AWRP OFC route
E-Tender for Laying/Pulling PLB pipe/ Duct by Open Trench Method/Trenchless Technology and PLB duct pulling/blowing in 300mm dia NHAI Telecom Utility duct, OF Cable Pulling/Blowing, splicing works and Associated works for Srinagar- Rudraprayag
Hume Pipes 600 MM dia, Double beam Crash Barrier, Convex mirror 60 CM dia approved by NHAI, 75 MM dia MS pole 3 M high and fixing clamp for Convex mirror, Double Wall corrugated pipe as per IS 16205
Hume Pipes 600 MM dia, Double beam Crash Barrier, Convex mirror 60 CM dia approved by NHAI, 75 MM dia MS pole 3 M high and fixing clamp for Convex mirror, Double Wall corrugated pipe as per IS 16205
E-Tender for Laying/Pulling PLB pipe/ Duct by Open Trench Method/Trenchless Technology and PLB duct pulling/blowing in 300mm dia NHAI Telecom Utility duct, Optical Fibre Cable Pulling/Blowing, splicing works and Associated works for Rudraprayag-Kund
E-Tender for Laying/Pulling PLB pipe/ Duct by Open Trench Method/Trenchless Technology and PLB duct pulling/blowing in 300mm dia NHAI Telecom Utility duct, Optical Fibre Cable Pulling/Blowing, splicing works and Associated works for Rishikesh-Chamba
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION FOR Rehabilitation and upgradation of Askot Lipulekh on EPC basis for Phase I Design Chainage Km 21.330 to Km 56.935 under Project Hirak of BRO in the State of Uttarakhand under Bharatmala
Rehabilitation and upgradation of Askot Lipulekh on EPC basis for Phase-I existing Km 72.000 to Km 107.620 Design Chainage Km 21.330 to Km 56.935 under Project Hirak of BRO in the State of Uttarakhand
Hume Pipes 600 MM dia, Double beam Crash Barrier, Convex mirror 60 CM dia approved by NHAI, 75 MM dia MS pole 3 M high and fixing clamp for Convex mirror, Double Wall corrugated pipe as per IS 16205, Box Culvert
Restoration of piple line works amd other appurtemant works at gumkhal satpuli NH roads.
Short term maintenance work for restoration and repair of Pagalnallah of NH-07 Chamoli
Construction of underground drain from NH to house of Ashok at Geeta Bhavan road ward no. 08
PROVN OF ONE GUARD ROOM WITH TOILET AND BATHROOM NEAR STN HQ GATE ON NH-9 AND PROVN OF BATHROOM BLOCK WITH WC AND URINAL AT MT AREA OF 438 (I) FD COY AND PROVN OF TOILET BLOCK TO BLDG NO 2/2 MAIN GATE RP POST OF 2119 FD HOSP AND INCLUDING CERTAIN MIN
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Selection of Authority engineer for supervision of civil construction works of (I) (i) Construction an up gradation of existing road to 2lane with paved shoulder from existing Chainage Km 504.871 to Km 508.610 of NH-07 (Old NH-58) (Lambagarh to Ben
Short Term Maintenance work (Miscellaneous Structure works) from Km. 368.000 to Km. 468.000 of Rudraprayag to Helang on NH-7 (old NH-58) under MR Head and at Risk and Cost of the EPC Contractor in the state of Uttarakhand - 2nd Call.
Restoration of Protection work and Boulder trap along NH Road at top of MAT Portal of Power House DGPS