Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H-1₹3.8 CrAccepted-Finance | ₹3.8 Cr | H-1 | Accepted-Finance Responsive |
| 2 | H-2₹5.1 Cr+₹1.3 Cr (33.7%)Accepted-Finance | ₹5.1 Cr+₹1.3 Cr (33.7%) | H-2 | Accepted-Finance Responsive |
| 3 | H-3₹5.5 Cr+₹1.7 Cr (43.6%)Accepted-Finance | ₹5.5 Cr+₹1.7 Cr (43.6%) | H-3 | Accepted-Finance Responsive |
| 4 | H-4₹4.8 Cr+₹1.0 Cr (27.1%)Accepted-Finance | ₹4.8 Cr+₹1.0 Cr (27.1%) | H-4 | Accepted-Finance Responsive |
| 5 | H-5₹5.4 Cr+₹1.6 Cr (42.2%)Accepted-Finance | ₹5.4 Cr+₹1.6 Cr (42.2%) | H-5 | Accepted-Finance Responsive |
Tender Value
Refer Docs
Closing Date
20 Nov 2023, 5:00 pmClosed
CE-RO, MoRTH,Dehradun
Chief Engineer-Regional Officer,MoRTH, 1st Floor, The Institution of Engineers (India) Building Near ISBT, Saharanpur Road, Dehradun, Uttarakhand
Consultancy Services for Authority Engineer for Supervision of REHABITATION AND UP-GRADATION TO 2-LANE CONFIGURATION OF BAGESHWAR TO KANGARCHINA ROAD FROM KM 129.600 TO KM 161.600 EXISTING CHAINAGE 136.00 TO KM 169.00 OF NH 309A IN THE STATE OF UK
2023_MoRTH_772754_1
NH-309A/AP/UK/2021-22/613-AE
Open Tender
Civil Works - Roads
EPC Contract
2700 days
Bageshwar
As per RFP
3 documents required · 3 mandatory
₹5,000
As per RFP
Exempted
O/o CE (NH), PWD, Yamuna Colony, Dehradun
23 Jul 2024
21 Sept 2023
21 Nov 2023
22 Sept 2023
20 Nov 2023
22 Sept 2023
16 Oct 2023
Amount
Key Personnel
Team Leader Cum Senior Highway Engineer (1No)
Resident cum Highway Engineer (1 No)
Bridge/Structural Engineer (1 No)
Senior Pavement Specialist (1No)
Senior Quality cum Material Expert (1 No)
Road Safety Expert (1 No)
Sub Professional Staff
Survey Engineer (1 No)
Assistant Highway Engineer (02 nos)
CAD Expert (1 No)
Environmental Engineer(1 No)
Assistant Bridge Engineer (01 nos)
Assistant Quality cum Material Engineer (02 nos)
Electrical Engineer for Utility Shifting (01 nos)
Quantity Surveyor(1 No)
Support Staff
Office Manager (1 No)
Accountant cum cashier (1 No)
Steno cum Computer Operator (1 No)
Office Boy (1 Nos)
Duty Travel to Site (Fixed Costs)
Site to CE-RO, MoRTH, Office for Key Professionals
Site to NH PWD for Key Professionals
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc. Office Rent (Fixed Costs) Minimum 200 sqm area of office shall be rented during construction period and 100 sqm area during maintenance period. The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete. The rent cost includes maintenance, cleaning, repairs, etc.
During Construction Period
During Maintenance Period
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required) etc.
Reports and Document Printing
Monthly Reports (Design and Construction)
Quarterly Reports
Survey and Investigation A. Topographical Survey (Fixed Rate)
Surface defects detection and roughness measurement using Network Survey Vehicle (32 Kms)
Pavement strength measurement using FWD (32 Kms)
Bridge inspection using Mobile Bridge Inspection Unit (32 Kms)
Road signs inspection using Retro Reflectometer (32 Kms)
Contingency (A fixed amount of Indian Rupees ONE MILLION shall be include dinthe Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority inMinistry of Road Transport & Highways(MoRT&H))
JAIMAN Construction and Consultants LLP
Redecon INDIA private Limited
MSPARK Futuristics & Associates
Sterling Indo Tech Consultants Pvt Ltd.
G-Eng Advisory Services Pvt. Ltd.
TECHNICAL CONSULTANCY SERVICES
MSV INTERNATIONAL INC
Geo Designs and Reserch Pvt. Ltd.
Marc Technocrats Private Limited
Agnitio Infrastructure Projects Pvt. Ltd.
Yongma Engineering Co., Ltd.
Aushta Consulting Engineers (I) Pvt Ltd
Technocrats Advisory Services Pvt. Ltd.
HIGHWAY ENGINEERING CONSULTANT
Theme Engineering Services Pvt Ltd
Almondz Global Infra-Consultant Limited
Lion Engineering Consultants Private Limited
SA Infrastructure Consutants Pvt. Ltd.
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .