Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
18 live13 closing this weekmost from PWD and Panchayati Raj Department Uttrakhand
18 results • Latest
Construction of Part-2 work at Manyuda to Naragwadi motor road in Garud block of the constituency assembly Bageshwar in District Bageshwar under the State Plan.
Repairing of damaged retaining wall at KV Kausani, Bageshwar (UK). SH: Balance Work)
Facility Management Services - LumpSum Based - Solar Lighiting system north eastern states hill states solar street light with 12 volt 30 ah li battery GI poles 3 inch dia 6 meters pole copper wire 75 watt solar pennel 12 watt led bulb etc add mainti..
14_ Bamshsera-Chirabagad_1.20 ha
15_jankudi-Khadgeda_1.50 ha
Canteen Service - Best Price on Fixed Menu Rate Model - Vegetarian; Lunch, Dinner, Breakfast, Beverages; Inside Building Premises (exclusive for employees/patients/in house personnel)
Facility Management Services - LumpSum Based - Solar Lighiting system north eastern states hill states solar street light with 12 volt 30 ah li battery GI poles 3 inch dia 6 meters pole copper wire 75 watt solar pennel 12 watt led bulb etc add mainti..
7Watt White-LED Based Solar Street Lighting System As Per MNRE Specification (Q3)
Flood Protection Work in Saryu and Kanalgarh river in block kapkot Distt Bageshwar Under State Disaster Mitigation Fund
construction of a new motor road extending from km 10 of the Khadlekh Bhanar motor road in the Bageshwar district to the Ghurdiya Bend on the Dharamghar Majkhet motor road from km 6 to km 8 Phase II Stage I
Construction work of Ramlila stage in Dugnakuri of Kapkot Block.
Under the One Time Maintenance Improvement and Bituminous Work covering 5 km from Km 70 of Bageshwar Kotmanya Motor Road to Km 1 to 5 of Maharudi Motor Road
Under the One Time Maintenance improvement and bituminous work on the Balighat Dofad Khuldauri motor road covering from km 1 to km 6
Facility Management Services - LumpSum Based - Solar Lighiting system north eastern states hill states solar street light with 12 volt 30 ah li battery GI poles 3 inch dia 6 meters pole copper wire 75 watt solar pennel 12 watt led bulb etc add mainti..
Construction Of Proposed VC Room and Supervisor Office CO At Bageshwar Champawat Dharchula Khatima Ramnagar and Srinagar Uttarakhand
Reconstruction of 110 M Motor Bridge at Bhakuna Nachni over Ramganga river in Bageshwar District.
Rehabilitation and up-gradation to 2-lane configuration of Kanda to Bageshwar road from km 103.25 to Km 122.72 (Existing Chainage 110 to Km 130) of NH-309A in the State of Uttarakhand (Package-ll) under NH(O)