Loading…
Loading…
148 results • Latest
Permanent Restoration Work of Damaged 150 mm dia MSERW pipe line under BAGESHWAR URBAN (Kathayatbara G.O.V.-Jakhera) Water Supply Scheme Due to Natural Calamity on Dated 05.08.2025 in Uttarakhand Jal Sansthan, Division Bageshwar
Permanent Restoration Work of Damaged Restoration work damaged pipe line and protection work under Kapkot (Anarsa, Manigair, Baisani, Pausari and Sumati) W/S Scheme
SHIFTING OF LINES AT BILONA TAKULA ROAD BY NH UNDER DEPOSIT
INCREASING CAPACITY OF TRANSFORMERS UNDER EDSD 1ST UNDER CAPITAL HEAD
REPLACEMENT OF DAMAGED HT LT POLES UNDER EDSD 1ST BAGESHAWR UNDER OandM HEAD
All in One PC (V2) (Q2), Scanner (V3) (Q2) (3 (3 ))
UGIP Upgradation
Restoration work at Almora Bajnath Gwaldam Karanprayag to Vijaypur MR
Restoration of 132 KV GIS Bageshwar Sub station and its associated transmission line under CERC UPRPARE
Construction Of Crematourium In Kheerganga River In Block Kapkot Distt Bageshwar
Construction Of Crematourium In Saryu River In Block Kapkot Distt Bageshwar
Insulated Vaccine Delivery Van
TERM CONTRACT FOR ARTIFICERS WORKS AT KAUSANI UNDER GE RANIKHET
REPAIR MAINT OF EXTERNAL WATER SUPPLY SYSTEM AND EXTERNAL ELECTRIFICATION AT KAUSANI UNDER GE RANIKHET
Design Installation and Maintenance of Educational Lab/Centre - Science Lab; Supply and Installation of Hardware; Buyer
Renovation and repair works of Bageshwar MDG Bldg. under Almora Division
UT24131-Pandey Kharak to Dhyonai MR Stage- I and II with Five Year Maintenance Under PBMC, Length 2.000 Km
UT24133-Charna-Manakhet-Kulsari-Eriya MR Stage-I and II, Length-6.00 Km.
REPLACEMENT OF EXISTING LT BARE CONDUCTOR WITH LT AB CABLE AT GHINGARTOLA, MUSIYOLI, KHUNOLI, DHAPOLI, JATTHAKOT ETC UNDER VIJAYPUR SECTION UNDER EDD BAGESHWAR
L071- Majgaon MR Stage-I and II
L031- Saneti to Sangar MR Stage-I and II, Length- 6.50 Km
L028- Badi Panyali to Nani Panyali MR Stage-I and II
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Construction of Office cum residential (OCR) building for SIB at Bageshwar (under SIB Dehradun), District Bageshwar (UK) Balance work. (SH: P/F overhead Cupboards cabinets and Tables)
UT024122-Kathpuriyachina-Bohala MR to Bohala-Nandigaon MR Stage-II Length-4.00 Km
Construction work of Multi-level Parking in Kanda (Bageshwar)
L032-Jarti to Papoli MR Stage I and II
Improvement and renovation work of Kanda Rikhadi motor road in Kapkot assembly constituency of Bageshwar district under the state plan
REPAIR MAINT OF INTERNAL ELECTRIFICATION AT KAUSANI UNDER GE RANIKHET
DETAILED PROJECT REPORT(DPR) AS-WELL-AS ARRANGING APPROVAL OF THE SAME BY OUR CLIENT,DETAILED TENDER DOCUMENT FOR INVITING OF TENDER TO SELECT CONTRACTOR ETC.AND ALSO PROVIDING CONSULTANCY SERVICES DURING DIFFERENT STAGES OF EXECUTION OF THE PROJECT
L034-Bhanar to Dana Tikta MR Stage-I and II, Length- 3.79 Km
SUPPLY OF T and P ITEMS UNDER EDSD 2ND BAGESHWAR UNDER TandP HEAD
SUPPLY OF T and P ITEMS UNDER EDSD 1ST BAGESHWAR UNDER TandP HEAD
Construction work comprising roof treatment, painting, internal electrification, and the construction of a boundary wall, gate, and approach road at the Rural Self-Employment Training Institute (RSETI), Bageshwar.
All in One PC (V2) (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2), Line Interactive UPS with AVR (V2) (Q2) (3 (3 ))
High End Laptop - Notebook (Q2) (3 (3 ))
Equipments for DDMA Bageshwar
EARTHING, TURFING, CONSTRUCTION AND REPAIRING OF TRENCH OF 33/11 KV SS BAGESHWAR UNDER EDD BAGESHWAR
Major repair work on classrooms at Government Higher Secondary School, Baira Majhera.
Major repair work on class rooms at Government Higher Secondary School, Khaljhuni.
Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Admin
Replacement of existing LT Bare Conductor with LT AB Cable at 11 KV Kanda feeder under Vijaypur Section under EDD Bageshwar
RECONSTRUCTION AND REPAIR WORK OF THE EXISTING 11 KV REETHABGARH-TOLI LINE UNDER EDSD II BAGESHWAR UNDER EDD BAGESHWAR
RECONSTRUCTION AND REPAIR WORK ON THE 11 KV LINE FROM CHAUDASTHAL TO KARMI TO CONNECT THE KAPKOT FEEDER WITH THE KARMI FEEDER UNDER EDD BAGESHWAR
L022-Kanyali Kot to Chachai MR Stage-I and II, Length - 4.971 Km
Reconstruction of damaged causeway and paved shoulder using interlocking tiles on Mandalsera Bypass under District Plan 2025-26