Loading…
Loading…
148 results • Latest
CC work on the approach road from Gagrigol bridge to Panchayat Bhawan Purda under the district Plan
L025- Kanoli to Kalapair Kappari MR Stage - I and II, Length - 17.11 Km
improvement work of garur Devnai chaukhutiya motor road in km 1 2 and 3.(remaining work)
Beautification work of the Bhagwati Temple, Badiyakot, under the Manaskhand Mandir Mala Mission in the Kapkot Assembly constituency of Bageshwar district
Beautification work of the Kalika Temple, Kanda, under the Manaskhand Mandir Mala Mission in the Kapkot Assembly constituency of Bageshwar district
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) ( ( 3 3 ))
REPAIR TO CERTAIN BR WORKS PETTY WORK PERIODICAL SERVICES TO ALL MD OTM ACCN AT KAUSANI UNDER GE RANIKHET
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Beautification work of the Bhadrakali Temple, Kanda, under the Manaskhand Mandir Mala Mission in the Kapkot Assembly constituency of Bageshwar district
Manpower Outsourcing Services - Fixed Remuneration - Others; Office Peon; High School, Manpower Outsourcing Services - Fixed Remuneration - Others; Sweeper; High School, Manpower Outsourcing Services - Fixed Remuneration - Others; Driver - LMV; High School
One Year contract for MRI work of KCC/NON KCC and Solar consumers above 5 KW and Bill Distribution under EDD Bageshwar
CA NO. CWE/HILLS/RKT/102 OF 2025-2026 SPECIAL REPAIR TO HELIPAD OF C COMP SIG REGT AT MIL STN KAUSANI UNDER GE RANIKHET
Ration Kit (Q4)
CA NO. CWE/HILLS/RKT/44 OF 2026-2027 PROVN OF 10000 GALLON WATER TANK OF STEEL STRUCTURE FOR C COMP SIG REGT AT MIL STN KAUSANI UNDER GE RANIKHET
Repairing and Renovation/Construction of HT/LT line and Sub-Station for electrification of village-Borbalara under Capital (C.M. Ghosna No. 1675/2021)
Replacement of 11 KV ACSR to AAAC to different location under Kausani Section under EDD Bageshwar
Repairing and Renovation/Construction of HT/LT line and Sub-Station for electrification of village-Kuwari under Capital (C.M. Ghosna No. 1675/2021)
Supply and fixing of 33 KV Fault Inducator in Vijaypur and Banlekh under EDD Bageshwar
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
SHIFTING OF LINES AT KUNTI NAALA ON REQUEST OF IRRIGATION DEPARTMENT UNDER DEPOSIT HEAD
Liquid Consortia (V2) (Q3)
Neem-based EC (Emulsifiable Concentrate) Azadirachtin
Annual Maintenance work of 33/11 KV Sub-Station Kapkot under EDD Bageshwar
Annual Maintenance work of 33/11 KV Sub-Station Karmi under EDD Bageshwar
L033- Bhanar to Chanoli MR Stage- I and II, Length- 5.00 Km
UT24134- Paya to Dabu-Hadap MR Stage-I and II, Length-9.50 Km
UT024126-Bageshwar-Baijnath MR to Talar-Malujhal MR Stage-II, Length-9.16 Km
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Minor repair and painting work at the hostel building of the Government Industrial Training Institute, Kamedi.
001_BAG_sayalisates_1.08ha
construction of staff quarter type 1 at and augmentation of existing gravity scheme and other appurtenant work.
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Layer 2 Access Switch (V2) (Q2), Networking/Server Rack (Q2) (3 (3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Layer 2 Access Switch (V2) (Q2), Networking/Server Rack (Q2) (3 (3 ))
Interactive Panels with CPU (Q2) (3 (3 ))
Annual Maintenance work of 33/11 KV Sub-Station Dangoli-II under EDD Bageshwar
Annual Maintenance work of 33/11 KV Sub-Station Vijaypur under EDD Bageshwar
UT024124- Banlekh to Moudiyar MR Stage-II, Length-4.95 Km
L030-Baisani to Paunsari MR Stage- I and II, Length - 2.80 Km
L029-Bageshwar Kapkot to Rainthal MR Stage- I and II, Length - 4.95 Km
L024-Baghar to Dhaptigaon MR Stage - I and II, Length - 5.60 Km
L027- Gogina to Keemu MR Stage-I and II, Length- 4.80 Km
CA NO. CWE/HILLS/RKT/19 OF 2026-2027 REPAIR/MAINT TO STEEL FURNITURE ARTICLES INCLUDING CANNING/DENTING/PAINTING/ POLISHING TO REPAIRED FURNITURE AT RANIKHET, CHAUBATTIA, ALMORA, NANITAL AND KAUSANI UNDER GE RANIKHET
Sports Abdominal Guard (Q3), Cricket Bat (V2) Conforming to IS 828 (Q3), Cricketer helmet (Q3), Cricket gloves (Q3), Cricket Ball (V2) Conforming to IS 10800 (Q3) (3 (3 ))
Sports Nets (V2) Conforming to IS 3345 (Q3), Football (V2) Conforming to IS 417 (Part 1) (Q3), Volleyball (V3) Conforming to IS 417 (Q4), Volleyball Net (V2) Conforming to IS 3345 (Q3), Basketball (V2) (Q3), Badminton Net (V2) Conforming to IS 3345 (Q3), Shuttlecocks (V2) Conforming to IS 415 (Q4) (3 (3 ))
Renovation of assembly stage in play ground at KV Kausani, Distt. Bageshwar (UK) (SH Balance work)
Procurement of Batton cane (Lathi) 3 x 1.1/4.
REPAIR TO SEWAGE LINE MANHOLE SEPTIC TANK MISC EXTERNAL WORK TO ALL MD OTM ACCN AT KAUSANI UNDER GE RANIKHET
Rate Contract for Supply Erection and Commissioning of LED based Solar Street Lights at various locations in District Bageshwar with 05 years warrantee and comprehensive Annual Maintenance Contract