Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹24.7 LAccepted-Finance | ₹24.7 L | L 1 | Accepted-Finance Accepted |
| 2 | L 2₹25.5 L+₹72,654 (2.94%)Rejected-Finance MANDAL SERA BAGESHWAR DISTRICT BAGESHWAR | ₹25.5 L+₹72,654 (2.94%) | L 2 | Rejected-Finance Rejected |
| 3 | L 3₹25.8 L+₹1.1 L (4.38%)Rejected-Finance GRAM POST KARMI KAPKOT DISTRICT BAGESHWAR | BAGESHWAR | UTTARAKHAND | 263619 | ₹25.8 L+₹1.1 L (4.38%) | L 3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | maa bhagwati electricals L3 | M/s Upadhyay Electronics & Electricals L1 | SANGAM ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (SUPPLY) | ||||||
| 2.00 | Stay Clamp for SP 23 Double End | 19 | Nos | 372 ₹7,068 | 357 ₹6,783 Lowest | 367 ₹6,973 |
| 3.00 | Earth wire clamp with N&B | 48 | Nos | 331 ₹15,888 | 318 ₹15,264 Lowest | 327 ₹15,696 |
| 4.00 | E-Clamp | 141 | Nos | 169 ₹23,829 | 162 ₹22,842 Lowest | 167 ₹23,547 |
| 5.00 | PG Clamp Alu Alloy Rabbit to Rabbit | 315 | Nos | 287 ₹90,405 | 275 ₹86,625 Lowest | 283 ₹89,145 |
| 6.00 | Stay Clamp S/E for SP-23 with N&B | 24 | Nos | 298 ₹7,152 | 285 ₹6,840 Lowest | 294 ₹7,056 |
| 7.00 | HT Stay Insulator | 124 | Nos | 134 ₹16,616 | 130 ₹16,120 Lowest | 133 ₹16,492 |
| 8.00 | Bracing Clamp Top for SP-23 with N/B | 30 | Nos | 304 ₹9,120 | 292 ₹8,760 Lowest | 300 ₹9,000 |
| 9.00 | Bracing Clamp Bottom for SP-23 with N/B | 30 | Nos | 338 ₹10,140 | 325 ₹9,750 Lowest | 334 ₹10,020 |
| 10.00 | Top Channel Holding Clamp for SP-23 Pole | 119 | Nos | 202 ₹24,038 | 195 ₹23,205 Lowest | 200 ₹23,800 |
Tender Value
₹24.7 L
EMD Value
₹84,000
Closing Date
10 Aug 2026, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
RECONSTRUCTION AND REPAIR WORK OF THE EXISTING 11 KV REETHABGARH-TOLI LINE UNDER EDSD II BAGESHWAR UNDER EDD BAGESHWAR
2026_UPCL9_98099_1
EDC(R)-42/2026-27
Open Tender
Electrical Works
Item Rate
180 days
Bageshwar
As per Tender Documents
2 documents required · 2 mandatory
₹2,360
Executive Engineer
₹84,000
1 Sept 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | NON-CENTRALIZED MATERIAL (SUPPLY) | - | - | - | - |
| 2 | Stay Clamp for SP 23 Double End | 19 | Nos | 100 | ₹1,900 |
| 3 | Earth wire clamp with N&B | 48 | Nos | 100 | ₹4,800 |
| 4 | E-Clamp | 141 | Nos | 100 | ₹14,100 |
| 5 | PG Clamp Alu Alloy Rabbit to Rabbit | 315 | Nos | 100 | ₹31,500 |
| 6 | Stay Clamp S/E for SP-23 with N&B | 24 | Nos | 100 | ₹2,400 |
| 7 | HT Stay Insulator | 124 | Nos | 100 | ₹12,400 |
| 8 | Bracing Clamp Top for SP-23 with N/B | 30 | Nos | 100 | ₹3,000 |
| 9 | Bracing Clamp Bottom for SP-23 with N/B | 30 | Nos | 100 | ₹3,000 |
| 10 | Top Channel Holding Clamp for SP-23 Pole | 119 | Nos | 100 | ₹11,900 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
TenderDocReethabagarh042.pdf
Tender Documents • 16.19 MB
BOQ_115774.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .