| 1 | L1₹5.1 CrAccepted-Finance VILL P O HUPLI NACHNI TEHSIL MUNSYARI PITHORAGARH UTTARAKHAND | ₹5.1 Cr | L1 | Accepted-Finance BID IS RESPONSIVE |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Bharat Bhushan Singh L1 |
|---|---|---|---|---|
| 1.00Hill side Cutting | ||||
| 2.00 | Earth work in Hill Road (Hill Side Cutting):- Excavation in Hilly area for construction of road in all types of soils, rocks and E&B etc. as met at site true to lines as per plan, L section Cross Slope, super elevation as required also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all lifts & leads required for safe disposal of surplus excavated material at suitable dumping places indicated in Drawing by mechanical means/ manual means and including construction of required coolie walling for retaining and muck, without otherwise damaging Forest, Forest Land, Utilities, Private and Public Properties, including slip clearance till the completion of the work as directed by Engineer-in-charge as per Technical Specification Clause 1601, 1602 & 1603 of MORD Specification for Rural Roads 2014. | 1 | Job | 39,57,770.62 ₹46,70,169.33 Lowest |
| 3.00PROTECTION WORK | ||||
| 4.00 | Excavation for Structures:- Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MoRD as per Technical Specification Clause 305.1&300 | 1,505.84 | Cum. | 453.7 ₹8,06,175.54 Lowest |
| 5.00 | Random Rubble Stone Masonry laid in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.as MORD specifications) | 738.6 | Cum. | 4,788.3 ₹41,73,233.29 Lowest |
| 6.00 | Random Rubble Masonry laid dry in breast wall, retaining wall, parapets, scupper etc. Including supply of all materials, labour, t & p & royalty etc, required for proper completion of work. MORD specifications) | 1,820.68 | Cum. | 2,330.5 ₹50,06,851.79 Lowest |
| 7.00 | HPS filling | 1,192.2 | Cum. | 1,106.9 ₹15,57,182.49 Lowest |
| 8.00PLUM CONCRETE WALL | ||||
| 9.00 | Excavation in foundation for retaining & brest walls | 135 | Cum | 453.7 ₹72,274.41 Lowest |
| 10.00 | Cement plum masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer in charge, as per drawing and Technical Specifications Clauses 802, 803, 1202 & 1203 of MORD Specification for Rural Roads 2014. | 324 | Cum | 4,355.1 ₹16,65,041.83 Lowest |
Tender Value
Refer Docs
EMD Value
₹10.5 L
Closing Date
12 Jun 2026, 1:00 pmClosed
CE URRDA Dehradun
CE URRDA Dehradun
L028- Badi Panyali to Nani Panyali MR Stage-I and II
2026_CCUK_148079_1
UT241412
National Competitive Bid
Civil Works - Roads
Item Rate
365 days
Kapkot
As per Technical Bid
3 documents required · 3 mandatory
₹5,900
₹10.5 L
Almora
16 Sept 2026
29 May 2026
12 Jun 2026
29 May 2026
12 Jun 2026
5 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hill side Cutting | - | - | - | - |
| 2 | Earth work in Hill Road (Hill Side Cutting):- Excavation in Hilly area for construction of road in all types of soils, rocks and E&B etc. as met at site true to lines as per plan, L section Cross Slope, super elevation as required also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all lifts & leads required for safe disposal of surplus excavated material at suitable dumping places indicated in Drawing by mechanical means/ manual means and including construction of required coolie walling for retaining and muck, without otherwise damaging Forest, Forest Land, Utilities, Private and Public Properties, including slip clearance till the completion of the work as directed by Engineer-in-charge as per Technical Specification Clause 1601, 1602 & 1603 of MORD Specification for Rural Roads 2014. | - | Job | 39,57,770.62 | - |
| 3 | PROTECTION WORK | - | - | - | - |
| 4 | Excavation for Structures:- Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MoRD as per Technical Specification Clause 305.1&300 | 1 | Cum. | 453.7 | ₹453.25 |
| 5 | Random Rubble Stone Masonry laid in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.as MORD specifications) | - | Cum. | 4,788.3 | - |
| 6 | Random Rubble Masonry laid dry in breast wall, retaining wall, parapets, scupper etc. Including supply of all materials, labour, t & p & royalty etc, required for proper completion of work. MORD specifications) | - | Cum. | 2,330.5 | - |
| 7 | HPS filling | - | Cum. | 1,106.9 | - |
| 8 | PLUM CONCRETE WALL | - | - | - | - |
| 9 | Excavation in foundation for retaining & brest walls | - | Cum | 453.7 | - |
| 10 | Cement plum masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer in charge, as per drawing and Technical Specifications Clauses 802, 803, 1202 & 1203 of MORD Specification for Rural Roads 2014. | - | Cum | 4,355.1 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_231246.xls
BOQ • 0.36 MB
Drw.pdf
Additional Documents • 7.38 MB
UT241412.pdf
Tender Documents • 3.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .