Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹24.9 LAccepted-Finance | ₹24.9 L | L 1 | Accepted-Finance Accepted |
| 2 | L 2₹25.2 L+₹34,560.01 (1.39%)Rejected-Finance MANDAL SERA BAGESHWAR DISTRICT BAGESHWAR | ₹25.2 L+₹34,560.01 (1.39%) | L 2 | Rejected-Finance Rejected |
| 3 | L 3₹25.5 L+₹66,930.13 (2.69%)Rejected-Finance GRAM POST KARMI KAPKOT DISTRICT BAGESHWAR | BAGESHWAR | UTTARAKHAND | 263619 | ₹25.5 L+₹66,930.13 (2.69%) | L 3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | maa bhagwati electricals L3 | SANGAM ENTERPRISES L2 | M/s Upadhyay Electronics & Electricals L1 |
|---|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (SUPPLY) | ||||||
| 2.00 | E-Clamp for 11 KV | 144 | Nos | 165 ₹23,760 | 163 ₹23,472 | 162 ₹23,328 Lowest |
| 3.00 | Stay Clamp for SP 23 Single End | 19 | Nos | 292 ₹5,548 | 289 ₹5,491 | 286 ₹5,434 Lowest |
| 4.00 | Stay Clamp for SP 23 Double End | 56 | Nos | 365 ₹20,440 | 361 ₹20,216 | 357 ₹19,992 Lowest |
| 5.00 | Holding Clamp for SP-23 without N/B | 64 | Nos | 199 ₹12,736 | 197 ₹12,608 | 195 ₹12,480 Lowest |
| 6.00 | Earth wire clamp for SP-23 with N/B | 60 | Nos | 325 ₹19,500 | 321 ₹19,260 | 318 ₹19,080 Lowest |
| 7.00 | PG Clamp Alu Alloy Rabbit to Rabbit | 540 | Nos | 281 ₹1,51,740 | 278 ₹1,50,120 | 270 ₹1,45,800 Lowest |
| 8.00 | Bracing Clamp Top for SP-23 with N/B | 26 | Nos | 299 ₹7,774 | 295 ₹7,670 | 292 ₹7,592 Lowest |
| 9.00 | Bracing Clamp Bottom for SP-23 with N/B | 26 | Nos | 332 ₹8,632 | 328 ₹8,528 | 325 ₹8,450 Lowest |
| 10.00LABOUR PART (WORK) | ||||||
Tender Value
₹24.9 L
EMD Value
₹84,000
Closing Date
10 Aug 2026, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
RECONSTRUCTION AND REPAIR WORK ON THE 11 KV LINE FROM CHAUDASTHAL TO KARMI TO CONNECT THE KAPKOT FEEDER WITH THE KARMI FEEDER UNDER EDD BAGESHWAR
2026_UPCL9_98098_1
EDC(R)-41/2026-27
Open Tender
Electrical Works
Item Rate
180 days
Bageshwar
As per Tender Documents
2 documents required · 2 mandatory
₹2,360
Executive Engineer
₹84,000
1 Sept 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | NON-CENTRALIZED MATERIAL (SUPPLY) | - | - | - | - |
| 2 | E-Clamp for 11 KV | 144 | Nos | 100 | ₹14,400 |
| 3 | Stay Clamp for SP 23 Single End | 19 | Nos | 100 | ₹1,900 |
| 4 | Stay Clamp for SP 23 Double End | 56 | Nos | 100 | ₹5,600 |
| 5 | Holding Clamp for SP-23 without N/B | 64 | Nos | 100 | ₹6,400 |
| 6 | Earth wire clamp for SP-23 with N/B | 60 | Nos | 100 | ₹6,000 |
| 7 | PG Clamp Alu Alloy Rabbit to Rabbit | 540 | Nos | 100 | ₹54,000 |
| 8 | Bracing Clamp Top for SP-23 with N/B | 26 | Nos | 100 | ₹2,600 |
| 9 | Bracing Clamp Bottom for SP-23 with N/B | 26 | Nos | 100 | ₹2,600 |
| 10 | LABOUR PART (WORK) | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_115773.xls
BOQ • 0.26 MB
TenderDocChodasthal041.pdf
Tender Documents • 16.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .