| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.1 Cr+₹3.1 Cr (62.3%)Admitted-Finance B 1 E 27 MOHAN COOPERATIVE INDUSTRIAL ESTATE MATHURA ROAD NEW DELHI 110044 INDIA | SOUTH EAST | DELHI | 110044 | ₹8.1 Cr+₹3.1 Cr (62.3%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical LION TOWER PLOT NO 97 ELEGANT ESTATE BAIRAGARH CHICHLI KOLAR ROAD BHOPAL M P | BHOPAL | MADHYA PRADESH | - | - | Rejected-Technical Not Eligible |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Eligible |
| Sl No | Description | Qty | Unit | LEA Associates South Asia Pvt. Ltd. L2 | Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.) L1 |
|---|---|---|---|---|---|
| 1.00Remuneration for Local Staff (inclusive of per Diem allowance) | |||||
| 2.00PROFESSIONAL Staff | |||||
| 3.00 | Team Leader cum Senior Tunnel Engineer | 9 | Man Months | 7,30,000 ₹65,70,000 | 5,50,000 ₹49,50,000 Lowest |
| 4.00 | Tunnel Design Expert | 9 | Man Months | 7,10,000 ₹63,90,000 | 4,00,000 ₹36,00,000 Lowest |
| 5.00 | Senior Geotechnical Engineer | 9 | Man Months | 6,73,000 ₹60,57,000 | 4,00,000 ₹36,00,000 Lowest |
| 6.00 | Senior Geophysicist | 6 | Man Months | 6,66,800 ₹40,00,800 | 4,00,000 ₹24,00,000 Lowest |
| 7.00 | Senior E&M Expert | 6 | Man Months | 6,67,000 ₹40,02,000 | 3,50,000 ₹21,00,000 Lowest |
| 8.00 | Senior Geologist | 9 | Man Months | 6,59,000 ₹59,31,000 | 2,00,000 ₹18,00,000 Lowest |
| 9.00 | Senior Survey Engineer | 6 | Man Months | 3,98,000 ₹23,88,000 | 1,80,000 ₹10,80,000 Lowest |
| 10.00 | Environmental Specialist | 4 | Man Months | 3,90,000 ₹15,60,000 | 1,80,000 ₹7,20,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
10 Oct 2023, 3:00 pmClosed
NHIDCL HQ New Delhi
NHIDCL HQ New Delhi
CS for Preparation of DPR and providing services for pre-construction activities in respect of Rehabilitation and Resettlement of sinking zones and sliding zones and construction of tunnel at Pagal Nallah location in the state of Uttarakhand
2023_NHIDC_759355_1
NHIDCL/UK/DPR/NH-07/ Sinking-Sliding- Pagalnallah
Open Tender
Civil Works
Item Rate
365 days
Uttarakhand
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ New Delhi
13 Mar 2024
26 Jun 2023
11 Oct 2023
26 Jun 2023
10 Oct 2023
3 Aug 2023
26 Jun 2023 - 21 Jul 2023
27 Jul 2023
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
PROFESSIONAL Staff
Team Leader cum Senior Tunnel Engineer
Tunnel Design Expert
Senior Geotechnical Engineer
Senior Geophysicist
Senior E&M Expert
Senior Geologist
Senior Survey Engineer
Environmental Specialist
Highway cum Pavement Engineer
Quantity Surveyor/Documentation Expert
Land Acquisition Expert
Utility Expert
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment and one sub-professional to be a fresh graduate)
Assistant Tunnel Engineer
Assistant Highway cum Pavement Engineer
Assistant Material-cum-Geotechnical Engineer-Geologist
Survey Engineer
Assistant Quantity Surveyor/Documentation Expert
Support Staff (Fixed Rates)
Office Manager (1 No.)
Typist (1 No.)
Office Boy (1 No.)
Night Watchman (1 No.)
Transportation (Fixed Costs)
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants (3 Vehicle for 9 months each)
Duty Travel to Site (Fixed Costs)
All Trips
Office Rent (Fixed Costs)
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication
Office Furniture and Equipment (Fixed costs)
Office Furniture and Equipment
Reports and Document (Fixed costs)
Monthly Report (03 sets)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
LA & Clearances II Report
Survey and Investigation
A. Topographical Survey (Fixed Rate)
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey field staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
B. Investigation (Fixed cost)
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, any other investigation surveys etc.
Net Work Survey and GPR
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
GPR Survey for detection of under ground utilities
Sub-soil Investigation & Other Works
Sub-Soil Investigation
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Cost of supply and fixing Boundary Pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
Land Acquisition Team including support staff and logistics/transportation
A. Land acquisition Team including support staff
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoongo/ Girdawar or equivalent
Ex-Patwari or equivalent
Typist
B. Logistics for Land acquisition Team
Computer including necessary peripherals
Printers
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
LEA Associates South Asia Pvt. Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .