| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 CrAdmitted-Finance T 10 3RD FLOOR CITY CENTRE PRESS COMPLEX PLOT NO 1 M P NAGAR ZONE I BHOPAL M P 462011 | BHOPAL | BHOPAL | MADHYA PRADESH | 462011 | ₹20.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹18.8 CrAdmitted-Finance | ₹18.8 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | L N MALVIYA INFRA PROJECTS PVT LTD L1 | SA Infrastructure Consutants Pvt. Ltd. L2 |
|---|---|---|---|---|---|
| 10.00A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES) | |||||
| 20.00 | Local Consultants
Remuneration for Local Professional Staff
(inclusive of per diem allowance) | 1 | Nos | 1,02,50,000 ₹1.0 Cr | 1,28,19,600 ₹1.3 Cr |
| 30.00 | Support Staff (inclusive of per diem allowance) | 1 | Nos | 9,12,000 ₹9.1 L | 8,63,868 ₹8.6 L |
| 40.00 | Transportation | 1 | Nos | 12,00,000 ₹12 L | 6,01,200 ₹6.0 L |
| 50.00 | Duty Travel to Site | 1 | Nos | 20,00,000 ₹20 L | 3,00,000 ₹3 L |
| 60.00 | Office Rent | 1 | Nos | 7,20,000 ₹7.2 L | 3,00,000 ₹3 L |
| 70.00 | Office Supplies, Utilities and Communication | 1 | Nos | 2,40,000 ₹2.4 L | 6,00,000 ₹6 L |
| 80.00 | Office Furniture and Equipment (Rental) | 1 | Nos | 3,60,000 ₹3.6 L | 66,000 ₹66,000 |
| 90.00 | Reports and Document Printing | 1 | Nos | 1,22,000 ₹1.2 L | 1,77,600 ₹1.8 L |
| 100.00Surveys & Investigations | |||||
Updated dates
Tender Value
Refer Docs
Closing Date
27 Feb 2026, 5:00 pmClosed
RO, MoRTH, Dehradun
Office of the Regional Officer, MoRTH 1st Floor, The Institution of Engineers (India) Building Near ISBT, Saharanpur Road, Dehradun, Uttarakhand, Pin 248002
Project Management Consultancy Services for Construction of 2 Lane Elevated Srinagar Bypass on NH-07 Design length 8.0 km in the state of Uttarakhand.
2025_MoRTH_888726_1
RO/UK/NH-07/Srinagar Bypass/PMC/01
Open Tender
Civil Works - Roads
5110 days
Srinagar Bypass
As per Tender documents.
3 documents required · 3 mandatory
₹5,900
As Per RFP
Exempted
O/o RO, MoRTH, Dehradun
21 Apr 2026
5 Dec 2025
2 Mar 2026
5 Dec 2025
27 Feb 2026
8 Dec 2025
19 Jan 2026
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixing boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total cost net of Goods &service tax**
Remuneration for Local Professional Staff
Supporting Staff
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment
Reports and Document Printing
Road Survey Equipment
Contingencies
Sub Total
Grand Total net of Goods and Service tax (for all 3 phases)
Goods & Service Tax
Grand Total including goods and service tax (for all 3 phases)
BoQ_Ver3.0
Bidder Name :
PRICE SCHEDULE (FORM -II) Estimate of Local Currency Costs A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES) I - REMUNERATION FOR LOCAL PROFESSIONAL STAFF (including per diem allowance) For Standalone Tunnel Project
NUMBER #
Highway cum Pavement Engineer
Environmental Specialist
Senior Geotechnical Engineer
Senior Geophysicist
Land Acquisition Expert
Sub Total
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Staff 7
Sub Total
BoQ_Ver3.0
Bidder Name :
II. Support Staff A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
Office Manager
Typist
Office Boy
Night Watchman
BoQ_Ver3.0
Bidder Name :
III.Transportation (Fixed Cost) A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
BoQ_Ver3.0
Bidder Name :
IV.Duty Travel to Site (Fixed Costs) A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
Duty Travel to Site
BoQ_Ver3.0
Bidder Name :
V.Office Rent (Fixed Costs) A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
The rent cost includes maintenance, Cleaning, repairs, etc.
BoQ_Ver3.0
Bidder Name :
VI. Office Supplies, Utilities and Communication ( Fixed Costs ) A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
BoQ_Ver3.0
Bidder Name :
VII. Office Furniture and Equipment ( Rental ) A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
BoQ_Ver3.0
Bidder Name :
VIII.Reports and Document Printing A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
Draft EMP
Final EMP
BoQ_Ver3.0
Bidder Name :
IX Survey and Investigation A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
BoQ_Ver3.0
Bidder Name :
(90.2) B. Investigation (Fixed cost) A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Geophysical Investigation
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring) Rate (INR) Quantity Amount (INR) Amount (INR) in Words
a) Boring in all type of soils (including hard rock)
Sub Total
Note:* Quantities of borings shall be taken from Financial Proposal Form No.V. For financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, Payment shall be made on the actual quantity of boring at rates quoted above by the Consultant, which may be substantially more or less than the estimated quantities. Actual boring requirement would be strictly as per the codal provision.
BoQ_Ver3.0
Bidder Name :
C. NET WORK SURVEY AND GPR A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
Net work Survey of the existing Highways as a repository for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
BoQ_Ver3.0
Bidder Name :
X Cost of supply and fixing boundary pillars A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
BoQ_Ver3.0
Bidder Name :
(101). Land acquisition Team including support staff and logistics/transportation A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
BoQ_Ver3.0
Bidder Name :
Estimate of Cost for Expatriate Consultants (INR) Remuneration of Expatriate staff including per diem allowances A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
Remuneration of Expatriate staff including per diem allowances
BoQ_Ver3.0
Bidder Name :
International Airfares (Fixed Cost) Mobilization and Demobilization A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
NUMBER #
International Airfares (Fixed costs)
Inland Travel in Home Country (Fixed Costs)
Description Lump Sum RATE Trips Amount
Inland Travel in Home Country (Fixed Costs)
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Trips Amount
Other Miscellaneous expenses (like DA, internal travel expenses other incidentals)
Sub Total for Mobilization and Demobilization
BoQ_Ver3.0
Bidder Name :
Estimate of Local Currency costs B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE) . REMUNERATION FOR LOCAL PROFESSIONAL STAFF For Standalone Tunnel Project:
NUMBER #
Team Leader cum Senior Tunnel Engineer
Resident Engineer cum Excavation Specialist
Senior Contract Specialist
Sub Total
Survey Engineer
CAD Expert
Environmental Engineer
Assistant Quality cum Material Engineer
E&M Engineer
Quantity Surveyor
Sub Total
BoQ_Ver3.0
Bidder Name :
Support Staff B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE)
NUMBER #
Office Manager
Accountant cum cashier
Steno cum Computer Operator
Office Boy (1 no)
BoQ_Ver3.0
Bidder Name :
Transportation (Fixed rate on rentalbasis) B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE)
NUMBER #
BoQ_Ver3.0
Bidder Name :
Duty Travel to Site (Fixed Costs) (For all Lengths of projects): Professional and Sub-Professional Staff B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE)
NUMBER #
professional and sub professional staff trips * Rate quoted includes Hotel charges, travel cost etc.complete
BoQ_Ver3.0
Bidder Name :
Office Rent (Fixed Costs) B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE)
NUMBER #
Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete.
BoQ_Ver3.0
Bidder Name :
Office Supplies, Utilities and Communication ( Fixed Costs ) B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE)
NUMBER #
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
BoQ_Ver3.0
Bidder Name :
Office Furniture and Equipment ( Rental ) B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE)
NUMBER #
Office Furniture and Equipment ( Rental ) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2external &10 internal lines), photocopier (15ppm, 12000copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
BoQ_Ver3.0
Bidder Name :
Reports and Document Printing B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE)
NUMBER #
Monthly reports (Design and Construction)
Half yearly Reports
Various others reports as provided in the EPC Agreement such as Completion Report
BoQ_Ver3.0
Bidder Name :
Road Survey Equipment B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Road signs inspection using Retro Reflectometer
BoQ_Ver3.0
Bidder Name :
Contingencies B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE) (This BO
NUMBER #
stage.html
html • 0.03 MB
techsummary_934117.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
RFP.pdf
Tender Documents • 6.75 MB
BOQ_934117.xls
BOQ • 1.02 MB
Download all tender documents and submit your bid