Loading…
Loading…
592 results • Best match
Construction/ Extension of Dudhadhari Elevated Flyover including approaches on Muzaffarnagar -Haridwar Section from Km.206.220 to Km. 208.870 of NH-58 in Uttarakhand on EPC Mode.
Construction of 40.00m span P.S.C. Bridge over Hadvaha Nala at km. 29.00 of Purkaji-Laksar-Haridwar NH-334-A in Distt. Haridwar in the State of Uttarakhand Under Annual Plan 2020-2021
Consultancy Services for preparation of DPR for widening to 2 Lane configuration of Chamoli Kund Section km 0 to km 84 of National Highway 107A in the State of Uttarakhand
Periodical Renewal of Damaged road surface by B.C from km 0.00 to km 12.00 on NH-123 (New no. 507) in the State of Uttarakhand
Reconstruction work of Damaged Road surface in NH-72 (A) which was Damaged By Different Department under Deposit work.(km 37 to km 41) (Both side) District-Dehradun in The State of Uttarakhand
Short Term Maintenance from km 60.00 to 65.00 and road property maintenance from km 41.00 to 111.00 on NH-123(507) in the state of Uttarakhand.
Widening to 2 Lane from Existing Chainage Km 74.700 to Km 100.660 (Design Chainage Km 53.365 to Km 78.785) on NH 507 in the state Uttarakhand
Strengthening work from km 25 to km 32 and Construction of Damaged Retaining wall, Breast Walls in km 25 to km 40 on NH-123(New NH-507) on EPC mode under Annual Plan 2022-23 in the State of Uttarakhand
Strengthening from Km 149.00 (Ballupur Flyover) to Km 156.00 and km 162.00 to km 164.00 of including Junction Improvement at Kamla Palace of NH-72 (New NH-07) in the State of Uttarakhand under Annual Plan 2021-22
Landslide treatment work on NH 58 from Kodiyala (Km. 266.130) to Devprayag (Km. 296.925) at 10 locations under EPC mode.(As per DPR submitted by THDC) under Annual Plan2022-23in the State of Uttarakhand
Maintenance of road from Ch.15.00 to 61.500 of NH 334A in total length of 46.500 Km under Performance based Maintenance Contract (PBMC) for the financial year 2024-25 in the State of Uttarakhand
Landslide treatment work of 08 location on NH-07 under EPC mode in the State of Uttarakhand under Annual Plan 2024-25
IRQP work from km. 63.00 to 70.00 (Marchula to Shankarpur) on NH-121(309) in the State of Uttarakhand
Treatment of 07 no. of landslide location on NH-134 from Dharasu to Yamnotri in the State of Uttarakhand under Annual Plan 2023-24 on EPC Mode.
Periodic Renewal of road from Km. 233.00 to km.239.00, Km 242.00 to Km. 244.00 and Km. 261.00 to 274.00 of NH-707(A) under Annual Renewal Plan 2021-22 in the state of Uttarakhand
Strengthening work from km. 125.00 to km. 132.00 and reconstruction of damaged drain and Protection work from km. 104.00 to km. 139.00 on NH-72 (New NH-07) in the State of Uttarakhand under EPC mode
Short Term Maintenance From Km 198.00 to Km 204.00 Including Road Property Maintenance From Km 195.00 to Km 217.425 of NH -94 (134).
Construction of 6 Meter Span Culvert and Protection Work from Km 110.00 to 262.000 on NH- 121 (309) in the State of Uttarakhand under Annual Plan 2019-20
Estimate for construction of Damaged R/wall, B/wall on NH 534(119) from km 27.000 to 80.000 under Emergency Repair 2024-25 in the state of Uttarakhand
Work of Road Safety from Km 65.000 to 111.350 on NH 123 (507) in the state of Uttarakhand under EPC mode under Road Safety Annual Plan 2021-22
Geometric improvement work of intersections/junctions (Balaji Dham, Suddhowala Chowk, and Nanda Ki Chowki) located in the section from Jhajhra to Ballupur (Km 140.00 to 148.90) of National Highway No. 72 (New No. 07), subsequent to its transfer from
Slope Protection Measures (CH.7.590 Km to 7.690 Km Near Medanpur and CH.35.210 km to 35.265 km near Kund Barrage Along Rudraprayag - Gaurikund Road, NH-107) Under Annual Plan 2022-23 in the state of uttarakhand
Construction work of CC road from main highway in Khatima Mandi area towards Bandia via canal, from approach road in Gram Sabha Pachpeda towards Ravinder Singh Rana pond and from Kolhu of Gram Sabha Jamour Shakeel towards National Highway via canal
Under Chief Minister Announcement No. 634-2024 Reconstruction of the road stretch from Km 5.000 to Km 12.255 is proposed by Thin White Topping TWT on National Highway No. 109 in District Udham Singh Nagar, within Kichha Assembly Constituency, from Pt
Construction of Hard shoulders from km. 161.00 to 164.00 on NH-72(07) on EPC mode in the State of Uttarakhand
preparation of Detailed Project Report of construction of Srinagar bypass from Panch- Pepal to Sweet bridge in 2-lane with paved shoulders on NH-58 in the State of Uttarakhand
Construction of 65 Meter Span Steel Truss Girder Bridge at Km 1 of NH-707A under Annual plan 2021-22 N.H.(O) in the state of Uttarakhand (Under EPC mode)
Strengthening work from Zero Point (junction of Lal Bahadur Shastri National Academy of Administration) to Library Chowk Mussoorie (ch. 160.00 to 161.50 km) in the section of NH-707A (Tyuni- Chakrata- Mussoorie- Dhanaulti- New Tehri) in the State of
Landslide treatment work on NH-58 (New 07) at Bachelikhal Ch. 279.400 to 279.600 (200 m length) and Chamdhar Ch.337.940 to 338.165 (225 m length) under EPC mode in the state of Uttarakhand under Annual Plan 2024-25
TREATMENT OF 04 LANDSLIDE LOCATIONS CH 102pt66 KM TO CH 102pt885 KM ON PITHORAGARH TAWAGHAT ROAD AND CH 4pt680 KM CH 4pt880 KM CH 4pt890 KM CH 5pt250 KM AND CH 5pt733 KM CH 5pt833 KM IN TAWAGHAT GHATIABAGARH SECTION OF NH 09 OLD NH 125 IN THE UK
Installation of crash barrier at narrow and blind curves and providing, fixing road delineators and reflectors along crash barrier, improvement of 5 intersection points between km. 233.00 to km. 283.00 of NH-707A under road safety annual plan 2021-22
PR work from km 193 to 233 (41 km) and Provision of THRIE Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 2023-24 on EPC mode
Maintenance /Repair of road due to damaged by laying Gas pipeline from Km 155 to 165 (Shimla Bypass to Mohkampur) on NH-72 (New No.07 ) in the State of Uttrakhand
Short Term Maintenance (STMC) Works Km 81 to 88, Km 98 to 110 and Road Property Maintenance From Km 75 to 111 on NH-123(507) in the state of Uttarakhand
Land slide protection works of 04 nos on NH-07 Joshimath Mana Road
Installation of crash barrier and Construction of retaining wall from Km 171 to 235 on NH109(Old NH-87 Ext.) in The State Of Uttarakhand under Road Safety Annual Plan 2023-24
Periodic Renewal work in km. 238.00 to 243.00 (Chipalghat to Paboun) on NH-121(309) in the State of Uttarakhand
Treatment of 04 nos. of landslide location (Ch. 11.447 km to 11.690 km, CH 23.950 km - 24.270 km, Ch. 74.366 km to 74.471 km and 74.590 km to 74.650 km) on NH-107 in the state of Uttarakhand under Annual Plan 2025-26
Rehabilitation and Up-gradation from single lane to two lane with paved shoulder from existing Km 195.175 to Km 220.00 (Design Chainage from Km 71.300 to Km 95.947 Paligad to Jankichatti) on NH 134 in the state of Uttarakhand under EPC mode
Providing and fixing of THRIE metal beam crash barrier at accident prone areas from Km 16.000 to 55.000 and Improvement widening of junction in Km 52 and Km 54 on NH-334A under Road safety Annual Plan 2022-23 on EPC mode
P.R work from Km. 134.00 to Km. 154.00, Km. 155.00 to Km. 159.00, Km. 161.00 to Km. 164.00, Km. 169.00 and Km. 172.00 to 175.00 (Yamuna Pull to Bataghat) on NH-707A in the State of Uttarakhand under Annual Plan 2023-24
Upgradation and Four Laning of Poanta Saheb Ballupur Section of NH72 in the State of Himachal Pradesh and Uttarakhand under NH O on HAM Pkg1 Poanta Saheb Mednipur from Design Ch 0.000 to Ch 18.700.
RFP for IE Services during O n M period of TOM n Transfer of Muzaffarnagar to Haridwar sec from Km 130.560 to Km 209.120 of old NH 58 New NH334 in Uttar Pradesh and Uttarakhand
Construction of Two laning with Paved Shoulder of Khatima bypass of Sitarganj-Tanakpur section on NH-125 from Km. 24.720 to Km. 32.975 in the State of Uttarakhand under NHDP Phase-IV on EPC mode
CA NO. CWE/HILLS /PGH/48 OF 2023-2024 SPECIAL REPAIR TO ROAD LEADING TO MES OFFICE COMPLEX FROM NATIONAL HIGHWAY JUNCTION AND PCC ROAD FROM BUILDING NO 96 TO P-102 (QG TO AUDITORIUM) AT MIL STN DHARCHULA UNDER GE PITHORAGARH
Hill side cutting and muck disposal work Phase II stage 1 and Construction of wall and cross drainage work Phase II stage 2 in Kathgodam to Ranibag section of National Highway No. 87 (109) Honble Chief Minister Announcement No. 550 2019 Bhimtal As
Strengthening work from Km 149.000 to Km171.000 on NH-87 Extn.(New NH-109) in the state of Uttarakhand under NH(O) on EPC mode
Maintenance of NH-87 (New NH-109) under Short Term Maintenance of year 2023-24
Supervision Consultancy services for the construction of balance works of Two laning with paved shoulders of Sitarganj-Bareilly section of NH-74 from Km 254.820 to Km 329.280 in the state of Uttar Pradesh and Uttarakhand
Upgradation and Four Laning of Poanta Saheb Ballupur Section of NH72 in the State of Uttarakhand under NH(O) on Hybrid Annuity Mode Package-2 Medinipur to Ballupur (Dehradun) from Design Ch 18.700 to Ch 44.800.