Loading…
Loading…
592 results • Best match
Short Term Maintenance work from Km 133.150 to Km 173.600 On NH-707(72B)
Maintenance work on NH-109 (old NH-87 Ext.) from km 171 (Panduwakhal) to km 235 (Karnaprayag) in the State of Uttarakhand under Emergency Repair 2025-26.
Maintenance work on NH-58 (New NH-7) from km. 218.500 to 226.200 excluding level crossing from km 219.200 to 220.00 in the State of Uttarakhand under Special Repair 2025-26 (Length 6.90 Km)
CS for AE for Cons. of Realignment of NH-87 (New NH109) Sec. of Rudrapur Kathgodam from Design Ch. 0.000 (54.050 of NH 87) to Design Ch. 7.875 (61.550 Of NH 87) Due to Proposed Expansion of Pantnagar Airport (DL 7.875 Km) in Uttarakhand on EPC Mode
Road Safety Improvement of existing four lane section of Muzaffarnagar-Haridwar Section of NH-334 on EPC Mode in the state of Uttar Pradesh and Uttarakhand under NH(O)
Strengthening work from Chainage Km 200.000 to Km. 232.000 on NH-119 (New 534) under NH(O) 2020-21 in the state of Uttarakhandon EPC mode.
Short Term Maintenance from km 219.200 to 226.200 on NH-07
DETAILED ESTIMATE FOR BEAUTIFICATION /LANDSCAPE WORK FOR MAUKHAMPUR TO BHANIYAWAALA NHAI DIVIDER
Four/Six lanning of Bhaniyawala- Jollygrant- Rishikesh spur section of NH-07 from Km. 0.000 to Km 19.780 in the state of Uttarakhand under NH(O) on Hybrid Annuity Mode
Road property maintenance under STMC from km. 1 to Km. 12 on NH-123 (507)
Reconstruction and strengthening work of the damaged bridge near Uttaranchal University over Tons River at Km 143 of Dehradun-Herbertpur motor road (National Highway No. 72(07)).
Widening and Strengthening of Single, Intermediate Lane to 2 Lane from Existing Chainage (Km 100.660 to Km 106.540) Design Chainage (Km 78.785 to Km 84.600) on NH-123 (New NH no. 507) in the state of Uttarakhand
Resurfacing work with Bituminous Concrete in Ajabpur Flyover Service Lane in Km 161 and 162 of NH-72 (New NH-07) under STMC 2023-24 in the State of Uttarakhand.
Periodic Renewal work from Km 198 to Km 217.425 (Paligad to Foolchatti) on NH 94(134) under NH Division Barkot in the state of Uttarakhand under Annual Plan 2022-23
Treatment of 04 no. of Landslide Location (Location Ch. Km to 0.150 to km 0.310, Location Ch. Km 49.395 to km 49.535, Location Ch. 53.160 to km 53.500 and Location Ch. Km 66.860 to Ch. Km 67.020 on NH-134) from Dharasu to Yamnotri on NH-134 (Old NH
Consultancy Services for Preparation of Detailed Project Report and providing pre construction activities for widening from Single and intermediate lane to 2-lane with paved shoulder from km 160.00 to km 175.00 Mussoorie to Bataghatof NH-707A and NH-
Installation of Crash Barrier and Protection works from Km. 0.00 to 36.00,Km 70.00 to 84.20 on NH-107A and Km 0.00 to 18.700 on NH 107 in the State of Uttarakhand under Road Safety Annual Plan 2023-2024
Strengthening work from Chainage Km. 70.000 to Km. 84.200 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the state of Uttarakhand
Strengthening work from Design chainage 18.700 to 21.850 (Existing km.16.545 to 19.695) and Construction of R/wall and B/wall on NH-107(old109)under Annual Plan for NH(O) Works 2024-25 in the State of Uttarakhand
Periodicial Renewal (PR) between km. 274.00 to km. 283.00 on NH-707A in the state of Uttarakhand
Short Term Maintenance Work from km. 165.00 To 168, Km 170 and Km 171 on NH-707A
STMC work from Ch. 52.180 to 61.750, 70.750 to 72.900 and 79.360 to 83.000 on NH-707A
Road Safety Work from Km 175.00 to 233.00 on NH-707A and installation of thrie beam crash barrier from Km. 17 to 41 in remaining length on NH-123(507) in the State of Uttarakhand under Road Safety AP 2025-26
Strengthening work from Km 104.00 to Km 125.00 and km 132.00 to km139.00 on NH-72 (New NH-07) in the State of Uttarakhand through an Engineering, Procurement and Construction (EPC) Contract.
Estimate for Construction of Damaged R/Wall, B/ Wall and Culvert of NH 309 (Old NH 121) from km. 63.00 to 263.115 in the State of Uttarakhand under Emergency Repair 2024-25
Upgradation and Four Laning of Haridwar Bypass Package-1 From Km. 0.000 (Km 188.100 of NH-58) to Km. 15.100 (Km 5.100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode
Short Term Maintenance work from Km 134.00 to Km 175.00 on NH-707A in the state of Uttarakhand
Short Term Maintenance (STMC) work of NH 507 from Chainage 0.000 to 12.435 in the state of Uttarakhand
Independent Engineer Services for Supervision of Four/Six lanning of Bhaniyawala Jollygrant Rishikesh spur section of NH 07 from Km. 0.000 to Km 19.780 in the state of Uttarakhand under NH (O) on Hybrid Annuity Mode
Pit Making, Maintenance of mulberry plants in NHAI-125 on Sitaraganj to Tanakpur section
Maintenance work of NH 507 from Chainage 2.094 to 6.400 under Deposit District-Dehradun in the State of Uttarakhand
In reference of G-20 summit in 2023 Improvement of road from km. 229.700 to 235.900 on NH-58
Treatment of 05 Nos. of Landslide location (Ch. 29.010 to 29.280, Ch.54.840 to 54.980, Ch. 56.050 to 56.140) on NH-107 and Ch.70.260 to 70.340, Ch.81.900 to 82.015 on NH-107A in the State of Uttarakhand under Annual Plan 2024-2025
Strengthening work Of NH-107 (Old NH-109) (Kakdagad-Kund-Guptkashi) from Km. 33.130 To 41.260 and Treatment of Sinking Zones in Village Semi and Bhainsari (As per DPR submitted by THDC) from Kund To Guptkashi under Annual Plan 2022-23 in the State Of
Slope Protection works for Treatment of Landslide zone near Khat Village from Ch. 54.750 to 54.950 (based on DPR submitted by THDC India Ltd.) and Strengthening of existing road from Ch. 53.425 to 55.335 on NH-107 (Old NH-109) in the State of Uttarak
Maintenance of road from Ch. 235.250 to 333.400 on NH 58 (New 07) (Brahmpuri to Sweet Bridge section) on NH 58 (New 07) in total length 98.150 Km under Performance Based Maintenance Contract (P.B.M.C.) for the financial year 2025-2026 in the state of
Hill side treatment of Lambagarh Land Slide Zone at km 504.371 to km 504.871 on NH-58 (New NH-07) under Annual Plan 2022-23 in the State of Uttarakhand
RFP for providing Manpower Services to InvitConcessionaire for collection of User Fee at Chhapar FP of Muzaffarnagar to Haridwar section from Km. 130.560 to Km. 209.120 of Old NH 58 (New NH 334) in Uttar Pradesh and Uttarakhand
Treatment of sinking zone in Kaladhungi-I(69.880 to 69.980),Kaiadhungi- II (70.540 to 70.610) and Rampur (71.440 to 71.520) of NH-109(New NH-107) in the State of Uttarakhand under Annual Plan 2022-23
Short Term Maintenance work from Km 23.00 to Km 28.00 and Km 34.00 to 44.00 on NH-119(New 534)
Rehabilitation of existing bridges on NH-07 (Rishikesh to Srinagar) in the State of Uttarakhand under Annual Plan 2025-26
Treatment of 05 nos. of landslide location (Ch. 12.985 km to 13.410 km, 30.330 km to 30.425 km, 54.350 to 54.580, Ch. 56.328 - 56.432 km on NH-107 and 81.240 to 81.550 km) on NH-107A in the state of Uttarakhand under Annual Plan 2025-26
Under the State Plan CM Ghosna No 586 2018 new construction work of motor road from National Highway to Kalyani Village 1 Km under Dunda Block of Yamunotri Assembly Constituency
Landslide Treatment work of 05 Locations CH.298.360-CH.298.750, CH.304.120-CH.304.350, CH.304.870-CH.305.050, CH.312.190-CH.312.230 and CH.333.000-CH.333.100 ON NH-07 (OLD NH-58) under EPC mode in the State of Uttarakhand under Annual Plan 2024-25
Carrying out Geophysical Investigations of Vulnerable stretches on NH-717A and 717 B (Sikkim and West Bengal), Arunachal (NH-13, NH-215, NH-415, NH-513 and NH-713 A and Twang) and Mizoram (NH-502A, NH-54 and NH-108)
Consultancy Services for preparation of DPR for widening to 2 Lane configuration of NH-309B (Almora-Panar) including connectivity to proposed Almora Bypass on NH-87Ext. in the State of Uttarakhand.
Periodic Renewal of road from km 175.00 to 192.00 on NH- 707A in the State of Uttarakhand under NH(0) Annual Plan 2021-22
Strengthening work from km. 28.00 to km. 34.00 and km 44.00 to km 58.00 and Protection work from km.23.00 to km. 78.00 on NH-119 (New NH-534) in the State of Uttarakhand under EPC mode
Engagement of user fee collection agency on the basis of EQ through E-Tender for Shahpur Kalyanpur FP at Km. 13.400 of Poanta Saheb Ballupur Section of NH-7 (old NH-72) in the State of Himachal Pradesh and Uttarakhand
Engagement of user fee collection agency on the basis of CB through E-Tender for Shahpur Kalyanpur Fee Plaza at Km.13.400 of Poanta Saheb-Ballupur Section of NH-7 (old NH-72) in the State of Himachal Pradesh and Uttarakhand