Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹86.1 CrAdmitted-Finance | -36.11% | ₹86.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹98.7 CrAdmitted-Finance 102 RAVINDRA NAGAR OLD PALASIA INDORE M P | INDORE | MADHYA PRADESH | 452001 | -26.77% | ₹98.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹106.2 CrAdmitted-Finance 125 126 OFFICER COLONY RAJGARH ROAD HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | -21.22% | ₹106.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹107.0 CrAdmitted-Finance 1506 SECTOR 16 17 HISAR SECTOR 16 17 HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | -20.57% | ₹107.0 Cr | L4 | Admitted-Finance |
| 5 | L5₹108.4 CrAdmitted-Finance B 30 RDC RAJNAGAR GHAZIABAD U P | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | -19.56% | ₹108.4 Cr | L5 | Admitted-Finance |
Updated dates
Tender Value
₹106.4 Cr
EMD Value
₹2.1 Cr
Closing Date
12 Mar 2026, 12:00 pmClosed
SE(NH)PWD Dehradun
Office of the Superintending Engineer 10th NH Circle PWD Yamuna Colony Dehradun
Maintenance of road from Ch. 235.250 to 333.400 on NH 58 (New 07) (Brahmpuri to Sweet Bridge section) on NH 58 (New 07) in total length 98.150 Km under Performance Based Maintenance Contract (P.B.M.C.) for the financial year 2025-2026 in the state of
2025_MoRTH_886210_1
4491/13 Yata-NH-10/2025 dt. 19.11.2025
Open Tender
Civil Works - Roads
1825 days
NH-07
As per tender documents
3 documents required · 3 mandatory
₹23,600
As per RFP
₹2.1 Cr
SE(NH)PWD Dehradun
31 Mar 2026
19 Nov 2025
13 Mar 2026
19 Nov 2025
12 Mar 2026
15 Dec 2025
12 Dec 2025
ROUTINE MAINTENANCE(LumpSum) [for Total 60 months] Chainage 235.250 to 333.400 on NH-07 = Total 98.150 km
INITIAL RECTIFICATION WORKS (Lump Sum) [To be completed within 06 months from the notice to proceed] Chainage 235.250 to 333.400 on NH-07 = Total 98.150 km
PERIODICAL MAINTENANCEWORKS (Lump Sum) [To be completed as decided by the Engineer but overlay of Highway to becompletedwithin 24/60 months (as the case may be) from the date of notice to proceed]. Chainage 235.250 to 333.400 on NH-07 = Total 98.150 km
EMERGENCYWORKS(Unit Rates) Chainage 235.250 to 333.400 on NH-07 = Total 98.150 km
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
PBMCRFPNH07.rar
Tender Documents • 3.64 MB
BOQ_931494.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid