Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹46.8 LAccepted-Finance | ₹46.8 L | H1 | Accepted-Finance As per attached letter |
| 2 | H2₹1.3 Cr+₹81.6 L (174.3%)Accepted-Finance | ₹1.3 Cr+₹81.6 L (174.3%) | H2 | Accepted-Finance As per attached letter |
| 3 | H3₹79.7 L+₹32.8 L (70.2%)Accepted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | ₹79.7 L+₹32.8 L (70.2%) | H3 | Accepted-Finance As per attached letter |
| 4 | H4₹70 L+₹23.2 L (49.6%)Accepted-Finance | ₹70 L+₹23.2 L (49.6%) | H4 | Accepted-Finance As per attached letter |
| 5 | H5₹2.6 Cr+₹2.1 Cr (448.9%)Accepted-Finance | ₹2.6 Cr+₹2.1 Cr (448.9%) | H5 | Accepted-Finance As per attached letter |
Tender Value
Refer Docs
Closing Date
11 Mar 2020, 3:00 pmClosed
SE(NH)PWDDehradun
Office of the Superintending Engineer 10th NH Circle PWD Yamuna Colony Dehradun
preparation of Detailed Project Report of construction of Srinagar bypass from Panch- Pepal to Sweet bridge in 2-lane with paved shoulders on NH-58 in the State of Uttarakhand
2020_MoRTH_540781_1
520/13Yata-NH-10/2020 dated 31.01.2020
Open Tender
Civil Works - Highways
Item Rate
300 days
NH-58(07)
As per RFP documents
3 documents required · 3 mandatory
₹5,000
As per RFP
Exempted
CE(NH)PWDDehradun
20 May 2020
1 Feb 2020
12 Mar 2020
1 Feb 2020
11 Mar 2020
13 Feb 2020
12 Feb 2020
Amount
Local Consultants
Remuneration for Local Staff (Inclusive of per diem allowance
Supporting Staff
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Cost of Supply and fixing Boundary Pillers
Land Acquisition Team including supporting staff and logistics/Transportation
Subtotal Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total Cost Net of Tax
Taxes and Duties
I. Income Tax (Expatriate)
II. Other TAXES/ Duties (if any ) Specify Clearly
Total Cost Net of Goods & Service tax**
Goods and services tax payble in india
** Total Cost Net of Goods & Service Tax shall be considered for financial evaluation Note: No escalation will be payable during the services Insurances shall not be allowed separately. These will be incidental to main items.
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate) [Quantity in Km)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
B. Investigation (Fixed cost)
Road and Bridge Inventory (Qty L.S. One JOB)
FWD Test and Pavement Evaluation (Qty L.S. One JOB)
Roughness Survey (Qty L.S. One JOB)
Axle Load Survey (Qty L.S. One JOB)
Material Survey and Investigation (Qty L.S. One JOB)
Sub-grade Investigation (Qty L.S. One JOB)
Traffic Survey (Qty L.S. One JOB)
Socio-economic & Census Survey/Studies (Qty L.S. One JOB)
Sub-Soil Investigation (Boring) [Note:- Quantities of borings shall be taken from Financial Proposal Form No. V. For financial evaluation, these quantities and rates quoted by the consultant will be considered. However, Payment shall be made on the actual quantity of boring at rates quoted above by the Consultant, which may be substantially more or less than the estimated quantities]
a) Boring in all type of soils (other than hard rock) (Qty in Rmt)
b) Boring in hard rock (Qty in Rmt)
Description of Work / Item(s)
Amount
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) (Qty L.S. One JOB)
Description of Work / Item(s)
Amount
(A) Land acquisition Team including support staff:
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoogo/ Girdwar or equivalent
Ex-Patwari or equivalent
Typist-1
Typist-2
Sub Total
(B) Logistics for Land acquisition Team:
Computer including necessary peripherals
Printers
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
Sub Total
Note: The Consultant shall provide one Land Acquisition Expert along with allied team and supporting logistic as envisaged in Clause 5.1.5.1 of TOR for each 100 km stretches proposed for DPR preparation or part thereof.
Description of Work / Item(s)
Amount
I. Remuneration of Expatriate Staff including per diem allowances
Staff-1
Staff-2
Staff-3
Staff-4
Staff-5
Sub Total
II. Mobilization and Demobilization
No. of trips Rate per trip
1. International Airfares (Fixed costs)
2 Inland Travel in Home Country (Fixed Costs)
3. Other Miscellaneous expenses (like DA, internal travel expenses other incidentals) (Fixed Costs)
Sub Total
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Traffic cum Safety Expert
Environmental Specialist
Quantity Surveyor/ Documentation Expert
Land Acquisition Expert
Utility Expert
Sub Total
B.Sub-Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Staff-1
Staff-2
Staff-3
Staff-4
Staff-5
Staff-6
Staff-7
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Description of Work / Item(s)
Amount
professional and sub professional staff trips
Description of Work / Item(s)
Amount
The rent cost includes maintenance, cleaning, repairs, etc
Description of Work / Item(s)
Amount
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment(Rental)
Office Furniture and Equipment ( Rental )
Description of Work / Item(s)
Amount
Monthly Report (3 Per Month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
G-Eng Advisory Services Pvt. Ltd.
MSV INTERNATIONAL INC
Holtec Consulting Private Limited
Casta Engineers Pvt Ltd
S.M. Consultants
G-Eng Advisory Services Pvt. Ltd.
Holtec Consulting Private Limited
MSV INTERNATIONAL INC
S.M. Consultants
Casta Engineers Pvt Ltd
Agnitio Infrastructure Projects Pvt. Ltd.
Holtec Consulting Private Limited
MSV INTERNATIONAL INC
Casta Engineers Pvt Ltd
S.M. Consultants
Agnitio Infrastructure Projects Pvt. Ltd.
Holtec Consulting Private Limited
G-Eng Advisory Services Pvt. Ltd.
Casta Engineers Pvt Ltd
S.M. Consultants
S.M. Consultants
G-Eng Advisory Services Pvt. Ltd.
Holtec Consulting Private Limited
Agnitio Infrastructure Projects Pvt. Ltd.
Casta Engineers Pvt Ltd
G-Eng Advisory Services Pvt. Ltd.
MSV INTERNATIONAL INC
Casta Engineers Pvt Ltd
Holtec Consulting Private Limited
S.M. Consultants
Agnitio Infrastructure Projects Pvt. Ltd.
MSV INTERNATIONAL INC
G-Eng Advisory Services Pvt. Ltd.
S.M. Consultants
Casta Engineers Pvt Ltd
MSV INTERNATIONAL INC
G-Eng Advisory Services Pvt. Ltd.
Holtec Consulting Private Limited
S.M. Consultants
Casta Engineers Pvt Ltd
G-Eng Advisory Services Pvt. Ltd.
MSV INTERNATIONAL INC
Holtec Consulting Private Limited
S.M. Consultants
Casta Engineers Pvt Ltd
Agnitio Infrastructure Projects Pvt. Ltd.
MSV INTERNATIONAL INC
Holtec Consulting Private Limited
S.M. Consultants
Casta Engineers Pvt Ltd
G-Eng Advisory Services Pvt. Ltd.
MSV INTERNATIONAL INC
Holtec Consulting Private Limited
S.M. Consultants
Casta Engineers Pvt Ltd
G-Eng Advisory Services Pvt. Ltd.
MSV INTERNATIONAL INC
Agnitio Infrastructure Projects Pvt. Ltd.
Casta Engineers Pvt Ltd
Holtec Consulting Private Limited
G-Eng Advisory Services Pvt. Ltd.
MSV INTERNATIONAL INC
S.M. Consultants
Casta Engineers Pvt Ltd
Holtec Consulting Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .